DECENTRALIZATION OF INFRASTRUCTURE PLANING PROCESS
DECENTRALIZATION OF INFRASTRUCTURE PLANING PROCESS
批准号:
07305022
负责人:
OKUMURA Makoto
金额:
$1.28万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
1995
资助国家:
日本
项目状态:
已结题
起止时间:
1995 至 1996
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Orthodox infrastructure planning process has implicitly assumed an public body with perfect information as a planner. In the reality, however, private sectors as well as public bodies on several regional levels build plans of infrastructure development. They have different information and different political aims. We must build a new planning theory to support plural actors in planning process, enabling them to corporate effectively.Considering the origin of actors in decentralized processing systems, in general, systems can be classified into two different categories ; Distributed Planning Process and Cooperative Planning Process. The former is a system where planning works originally executed by the central planning actor are distributed on several local bolies, in order to increase the total system efficiency (management point of view), while the latter system are grown from bilateral cooperations between local actors having their own rights to decide plans by themselves. In both sy … More stems, the corporative process requeres planning abilities in each local bodies. Information interactions between local bodies seems key point in order to manage such systems effectively. This study discussed mathematical structures about such information exchages between local managers of water reservoirs interacting each other.In case of disasters, e.g.large earthquakes, information exchange in hierarchical structures in public bodies become difficult, then decentralized management and processing are widely seen. The study summarized the common characteristics of such decentralized management of public service after Hanshin Awaji Earthquake in Jan., 1995, and shown that regional decentralization and parallel processing saved time of decision making in ordinal process in series. Parallel data processing scheme can be used to analyze effectiveness of performance of such systems.We are now entering a second stage of infrastructure planning ; from civil-minimum infrastructures for existence of life to selective infrastructures for higher quality of life.. Such infrastructure requires software as well as hardware. In software planning, public sector has not sufficient information, idea or knowledge. Private actors and users are expected as positive planner of such software. In such case, discussions on conflicts between private aims and public one are required. We analyzed conflicts between landowners in urban development projects and discussed conflict resolution methods using game theory. Less
期刊论文(27)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
Kiyoshi Kobayashi: "Exploring Sustainability" Regional Planning Research Group,Tottori Univ., 310 (1996)
小林清:“探索可持续性”区域规划研究小组,鸟取大学,310(1996)
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
奥村 誠: "小規模小売店の最適更新行動に関する研究" 土木計画学研究・講演集. 18(2). 89-92 (1995)
Makoto Okumura:“小型零售店的最佳更新行为研究”土木工程规划研究和讲座 18(2)(1995)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
木俣 昇: "ペトリネットによる交通流シミュレーションシステムの実用化と応用" 土木計画学研究・講演集. 18(2). 197-200 (1995)
Noboru Kimata:“使用Petri网的交通流模拟系统的实际实现和应用”土木工程规划研究和讲座集197-200(1995)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
秀島栄三: 土木計画学研究・講演集. 19(2). 159-162 (1996)
Eizo Hideshima:土木工程规划研究和讲座集 19(2) (1996)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
木俣昇: "道路整備計画における経験的評価支援システムとその地図情報化に関する研究" 土木学会中部支部研究発表会講演概要集. 461-462 (1996)
Noboru Kimata:“道路维护规划及其地图信息转换的实证评估支持系统的研究”日本土木工程师学会中部分会研究会议演讲摘要461-462(1996)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
共 26 条
Usage of large scale positioning data for disaster area support
-
批准号:24656299
-
项目类别:Grant-in-Aid for Challenging Exploratory Research
-
资助金额:$2.5万
-
财政年份:2012
-
负责人:OKUMURA Makoto
-
依托单位:
Methodological study on inter-city transportation analysis for nation-wide transportation management
-
批准号:21360239
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$11.15万
-
财政年份:2009
-
负责人:OKUMURA Makoto
-
依托单位:
Intercity transport facility planning responsive to cancellation and delay risks
-
批准号:17360249
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$10.5万
-
财政年份:2005
-
负责人:OKUMURA Makoto
-
依托单位:
Development of Planning Support System for Emergent Water Distribution in Medium Size Cities
-
批准号:11555143
-
项目类别:Grant-in-Aid for Scientific Research (B)
-
资助金额:$3.97万
-
财政年份:1999
-
负责人:OKUMURA Makoto
-
依托单位: