课题基金 / 基金详情

Development of Planning Support System for Emergent Water Distribution in Medium Size Cities

Development of Planning Support System for Emergent Water Distribution in Medium Size Cities
中等城市应急配水规划支持系统的开发
批准号:
11555143
负责人:
OKUMURA Makoto
金额:
$3.97万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
1999
资助国家:
日本
项目状态:
已结题
起止时间:
1999 至 2001

项目摘要

项目成果

OKUMURA Makoto的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
In case of break down of water supply system by earthquake, use of ground water for drinking and utilities strongly helps emergent water distribution work, especially in the medium-size cities where huge investment for earth-quake proof water pipe line is not affordable. Ground water, however, can be contaminated by the break of sewage system, and its quality must be checked before use for drinking. In this study, we have studied two points concerning on emergent water supply: Ground water quality simulation system to increase the usability of it as drinking water, and water distribiition planning system.For the first viewpoints, this study proposes a procedure to select small number of test wells in order to diagnose the ground water quality of other wells in the region economically, based on the correlation among the wells. The procedure simulates transfer of contamination under every possible destruction pattern and evaluates expected water distnbution cost for the people around the risky wells.For the second purpose, we formulate the emergent water supply problem as a compound problem of a facility location problem to determine water supplying points, and a vehicle routing problem. The former is a problem. The former is a problem minimizes the number of supplying water points with the condition of covering of all residence places within the limit distance for water carrying. The latter is a problem which makes minimizes the total vehicle distance to distribute water to all water supplying points detemined above the facility location problem. Using heuristic methods, a calculation procedure to propose efficient water supply work in an emergency is established We apply this procedure to the Saijo area in Higashi-Hiroshima City. The influence of the destructions of water storages and bridges on the water supply work is calculated, and the effects of the pre-disaster earthquake-proof countermeasures for these facilities are analyzed.
期刊论文(56)
专著(0)
科研奖励(0)
会议论文
開發一郎: "西条盆地の地下水動態の四半世紀変化"日本地下水学会2001年秋季講演会講演要旨. 56-57 (2001)
Shinichiro Kai:“西条盆地地下水动态的四分之一世纪变化”日本地下水水文学会 2001 年秋季会议摘要 56-57 (2001)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
中島和樹: "車両巡回モデルによる緊急時給水体制の分析"土木学会年次学術講演会講演概要. 56-IV(CD-ROM). 462-463 (2001)
Kazuki Nakajima:“利用车辆巡逻模型分析应急供水系统”日本土木工程学会年度学术会议摘要56-IV(CD-ROM)462-463(2001)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
塚井誠人: "避難勧告への信頼度と避難行動"土木計画学研究講演集. 21(2). 517-520 (2000)
Masato Tsukai:“疏散建议和疏散行为的信心”土木工程规划研究讲座集 21(2)517-520(2000)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
Komatsu, T: "Study on ground water use system in emergency (in Japanese)"Proceedings of Annual Conference, JSCE Chugoku Branch. Vol.53. 739-740 (2002)
Komatsu, T:“紧急情况下地下水利用系统的研究(日语)”JSCE 中国分会年会记录。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
28
    Usage of large scale positioning data for disaster area support
    • 批准号:
      24656299
    • 项目类别:
      Grant-in-Aid for Challenging Exploratory Research
    • 资助金额:
      $2.5万
    • 财政年份:
      2012
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    Methodological study on inter-city transportation analysis for nation-wide transportation management
    • 批准号:
      21360239
    • 项目类别:
      Grant-in-Aid for Scientific Research (B)
    • 资助金额:
      $11.15万
    • 财政年份:
      2009
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    Intercity transport facility planning responsive to cancellation and delay risks
    DECENTRALIZATION OF INFRASTRUCTURE PLANING PROCESS
    • 批准号:
      07305022
    • 项目类别:
      Grant-in-Aid for Scientific Research (B)
    • 资助金额:
      $1.28万
    • 财政年份:
      1995
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    海外基金