Intercity transport facility planning responsive to cancellation and delay risks

Intercity transport facility planning responsive to cancellation and delay risks
应对取消和延误风险的城际交通设施规划
批准号:
17360249
负责人:
OKUMURA Makoto
金额:
$10.5万
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
2005
资助国家:
日本
项目状态:
已结题
起止时间:
2005 至 2007

项目摘要

项目成果

OKUMURA Makoto的其他基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
In order to improve the responsibility of inter-city transport facility plan to cancellation and delay risks, especially airports in non metropolitan area, where automobiles are mainly used for access measure, the following researches were conducted in these three years.1. Measuring automobile traffic flows on routes entering airport: To grasp the behavior of airport users in time dimension, automobile traffic flows around Oita, Sendai and Hiroshima Airports were measured by portable traffic counters, covering also the case of cancellation or delays of flights.2. Analysis of behavioral changes by cancellation or delay: Independent Component Analysis method was applied to the above measured traffic data and grasp some typical change of behavior due to cancellation and delays at Hiroshima.3. Pre-information of the flight cancellation and delay: Average arrival time to the airport calculated through the traffic flow data, and geographical distribution of trip origins are considered to estimate the required timing f pre-information of flight cancellation and delay.4. Conflicts among the stakeholders of terminal facility planning: In order to avoid the delay of planning process due to the conflicts among the stakeholders, a typical facility planning process is divided into sub-planning process based on the pre-determined unique quantity of traffic, based on non-delay, non-cancellation basis.5. Improvement of planning process aiming to be risk-responsive: We proposed a new process of planning by adding performance check process in case of cancellation or severe delays. Independent. Component Analysis method was applied to historical flight time data, in order to pick up several typical delay patterns.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
DOI: --
发表时间: 2006
期刊: Infrastructure Planning Review 23(3)
影响因子: --
作者: [Murakami, N., Takeuchi T., Okumura M. and Tsukai M.]
通讯作者: Okumura M. and Tsukai M.
鉄道運行戦略に対する航空サービスの影響分析
航空服务对铁路运营策略的影响分析
DOI: --
发表时间: 2006
期刊: 第12回鉄道技術連合シンポジウム講演論文集 12
影响因子: --
作者: [Tsukai, Makoto, 塚井誠人, 村上 直樹]
通讯作者: 村上 直樹
Statistical Analysis of Flight Delays at Sendai Airport
仙台机场航班延误统计分析
DOI: --
发表时间: 2007
期刊:
影响因子: --
作者: [Kimura Y., Kato H., Okumura M. and Tsukai M.]
通讯作者: Okumura M. and Tsukai M.
仙台空港利用車両の時間分布特性の分析
仙台机场使用车辆时间分布特征分析
DOI: --
发表时间: 2007
期刊: 交通工学研究発表会論文報告集 27
影响因子: --
作者: [Arai, S., Satoh, H., Koibuchi, Y., Onuki, M., Isobe, M., Mino, T., 塚井誠人, 奥村 誠]
通讯作者: 奥村 誠
23
    Usage of large scale positioning data for disaster area support
    • 批准号:
      24656299
    • 项目类别:
      Grant-in-Aid for Challenging Exploratory Research
    • 资助金额:
      $2.5万
    • 财政年份:
      2012
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    Methodological study on inter-city transportation analysis for nation-wide transportation management
    • 批准号:
      21360239
    • 项目类别:
      Grant-in-Aid for Scientific Research (B)
    • 资助金额:
      $11.15万
    • 财政年份:
      2009
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    Development of Planning Support System for Emergent Water Distribution in Medium Size Cities
    • 批准号:
      11555143
    • 项目类别:
      Grant-in-Aid for Scientific Research (B)
    • 资助金额:
      $3.97万
    • 财政年份:
      1999
    • 负责人:
      OKUMURA Makoto
    • 依托单位:
    DECENTRALIZATION OF INFRASTRUCTURE PLANING PROCESS
    • 批准号:
      07305022
    • 项目类别:
      Grant-in-Aid for Scientific Research (B)
    • 资助金额:
      $1.28万
    • 财政年份:
      1995
    • 负责人:
      OKUMURA Makoto
    • 依托单位: