Learning from Earthquakes: Building Resilient Communities Through Earthquake Reconnaissance, Response and Recovery
Learning from Earthquakes: Building Resilient Communities Through Earthquake Reconnaissance, Response and Recovery
批准号:
EP/P025951/1
负责人:
Tiziana Rossetto
金额:
$62.89万
依托单位国家:
英国
项目类别:
Research Grant
财政年份:
2017
资助国家:
英国
项目状态:
已结题
起止时间:
2017 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.
期刊论文(10)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
Observations from the 26th November 2019 Albania earthquake: the earthquake engineering field investigation team (EEFIT) mission
2019 年 11 月 26 日阿尔巴尼亚地震的观测:地震工程现场调查小组 (EEFIT) 任务
DOI:
10.1007/s10518-021-01062-8
发表时间:
2021
期刊:
Bulletin of Earthquake Engineering
影响因子:
4.6
作者:
[Freddi F]
通讯作者:
Freddi F
Anticipating a risky future: LSTM models for spatiotemporal extrapolation of population data in areas prone to earthquakes and tsunamis in Lima, Peru
预测危险的未来:秘鲁利马地震和海啸易发地区人口数据时空外推的 LSTM 模型
DOI:
10.5194/egusphere-2023-1794
发表时间:
2023
期刊:
影响因子:
--
作者:
[Geiß C]
通讯作者:
Geiß C
Assessing Emergency Response and Early Recovery using Sentiment Analysis (SA). The case of Zagreb, Croatia
使用情绪分析 (SA) 评估紧急响应和早期恢复。
DOI:
--
发表时间:
2021
期刊:
影响因子:
--
作者:
[Contreras D]
通讯作者:
Contreras D
Editorial: Disaster Reconnaissance Missions: Is a Hybrid Approach the Way Forward?
社论:灾难侦察任务:混合方法是前进的方向吗?
DOI:
10.3389/fbuil.2022.954571
发表时间:
2022
期刊:
Frontiers in Built Environment
影响因子:
3
作者:
[Aktas Y]
通讯作者:
Aktas Y
Lessons Learnt From the 2009 Padang Indonesia, 2011 Tohoku Japan and 2016 Muisne Ecuador Earthquakes
从 2009 年印度尼西亚巴东地震、2011 年日本东北地震和 2016 年厄瓜多尔美伊讷地震中汲取的经验教训
DOI:
10.3389/fbuil.2019.00073
发表时间:
2019
期刊:
Frontiers in Built Environment
影响因子:
3
作者:
[Chian S]
通讯作者:
Chian S
共 9 条
Challenging RISK: Achieving Resilience by Integrating Societal and Technical Knowledge
-
批准号:EP/K022377/1
-
项目类别:Research Grant
-
资助金额:$208.18万
-
财政年份:2013
-
负责人:Tiziana Rossetto
-
依托单位:
POST EARTHQUAKE FIELD INVESTIGATION OF THE M6.2 AQUILA, ITALY EARTHQUAKE OF APRIL 6, 2009
-
批准号:EP/H016120/1
-
项目类别:Research Grant
-
资助金额:$3.09万
-
财政年份:2009
-
负责人:Tiziana Rossetto
-
依托单位:
POST EARTHQUAKE FIELD INVESTIGATION OF THE M7.9 EASTERN SICHUAN, CHINA EARTHQUAKE OF MAY 12, 2008, AND DEVELOPMENT OF VIRTUAL DISASTER VIEWER
-
批准号:EP/G030111/1
-
项目类别:Research Grant
-
资助金额:$2.53万
-
财政年份:2008
-
负责人:Tiziana Rossetto
-
依托单位:
EPICENTRE - Earthquake and People Interaction Centre
-
批准号:EP/F012179/1
-
项目类别:Research Grant
-
资助金额:$114.12万
-
财政年份:2007
-
负责人:Tiziana Rossetto
-
依托单位:
海外基金