课题基金 / 基金详情

NEW METHOD FOR YIELD PILLAR DESIGN TO CONTROL COAL BUMPS

NEW METHOD FOR YIELD PILLAR DESIGN TO CONTROL COAL BUMPS
控制煤涌的产量支柱设计新方法
批准号:
6311401
负责人:
SYD S PENG
金额:
$10.95万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2000
资助国家:
美国
项目状态:
已结题
起止时间:
2000-09-30 至 2003-09-29

项目摘要

项目成果

SYD S PENG的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Coal mine bumps have presented serious mining problems in the United States throughout the 20th century. Fatalities and injuries have resulted when these destructive events occurred at the working faces of the mines. Persistent bump problem not only threaten the safety of miners, but also have caused the abandonment of large coal reserves and have led to premature mine closures. This research project focuses on coal bumps prevention in long-wall coalmines. A new method for gate-road design using yield pillar in long-wall coalmines will be developed for bumps and floor heave control. Current practice of yield pillars application shows that it can prevent coal bumps in some long-wall mines. The proposed approach will provide a method for stable yield pillar design. To differentiate between stable and violent failure of rocks, an approach proposed by Crouch and Fairhurst, (1) and Salamon (2) will be used in this method. The technical approach designed to meet this objective comprises three phases. In Phase 1, a survey of mining practices and problems related to coal bumps in long-wall coal mines will be conducted. Also, the most significant factors that contribute to coal bumps, such as geological, geometrical, geomechanical and mining variables will be defined statistically. In Phase 2, the main objective of this phase is to simulate the performance of yield pillar system at different stages of long-wall mining using large 3-D finite element models. These models will only consider the most significant variables obtained in Phase 1. Modeling results will be verified by field measurements. These measurements will include changes in pillar stress, pillar dilation, roof-to-floor closure, etc. In Phase 3, using the FE modeling results obtained in Phase 2, a multi-regression model correlating the pillar size to studied variables will be developed. This model will be adjusted and verified using actual cases of mines using yield pillar systems.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Coal Bumps Prediction in Longwall Coal Mines
  • 批准号:
    7681061
  • 项目类别:
  • 资助金额:
    $15.14万
  • 财政年份:
    2008
  • 负责人:
    SYD S PENG
  • 依托单位:
Coal Bumps Prediction in Longwall Coal Mines
  • 批准号:
    7595981
  • 项目类别:
  • 资助金额:
    $21.4万
  • 财政年份:
    2008
  • 负责人:
    SYD S PENG
  • 依托单位:
NEW METHOD FOR YIELD PILLAR DESIGN TO CONTROL COAL BUMPS
  • 批准号:
    6446049
  • 项目类别:
  • 资助金额:
    $10.95万
  • 财政年份:
    2000
  • 负责人:
    SYD S PENG
  • 依托单位:
NEW METHOD FOR YIELD PILLAR DESIGN TO CONTROL COAL BUMPS
  • 批准号:
    6598079
  • 项目类别:
  • 资助金额:
    $10.95万
  • 财政年份:
    2000
  • 负责人:
    SYD S PENG
  • 依托单位:
海外基金