Semi-continuous, on-line monitoring of selenium in coal-fired power plant waste water
Semi-continuous, on-line monitoring of selenium in coal-fired power plant waste water
批准号:
10081220
负责人:
Mark C Peterman
金额:
$50.0万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2020
资助国家:
美国
项目状态:
已结题
起止时间:
2020-08-01 至 2022-07-31
关键词:
AddressAir PollutionArsenicBeliefCalciumCalibrationChemicalsChromiumCoalComplexCoupledDetectionDevelopmentDisclosureElectricityElectrodesEngineeringEvaluationFeasibility StudiesFutureGasesGoalsGovernment AgenciesGypsumHeadHourIndustrializationIndustryLaboratoriesLegal patentMeasurementMeasuresMercuryMetalsMethodsMonitorNitratesOilsOnline SystemsOptical MethodsOpticsOutcomePerformancePhasePollutionPositioning AttributePower PlantsPreparationProcessProviderRaman Spectrum AnalysisReagentRegulationResearchResearch InstituteSamplingScanningScientistSeleniteSeleniumSiteSmall Business Innovation Research GrantSocietiesSourceSpecificityStreamSulfurSurfaceSystemSystems AnalysisTechnologyTestingTimeUnited StatesVisionWaterWater PollutantsWater SupplyWorkanalytical toolaqueouscostdesigndesulfurizationexperienceinnovationinnovative technologiesinstrumentoxidationpollutantprototypereal time monitoringremediationselenatesingle moleculesuccesstoolwastingwater samplingwater testing
中文摘要
项目总结/文摘
英文摘要
Project Summary/Abstract
The proposed Phase II SBIR Project will convert our successful Phase I feasibility study into a prototype
system for on-line, real-time monitoring of selenium in coal-fired power plant waste water. As an
innovator in advanced chemical analysis, OndaVia is positioned to be the provider of choice for
companies demanding fast, accurate water testing. The OndaVia analysis system consists of test kits
designed for fast, easy, laboratory-grade water analysis. These kits couple with an instrument that scans
the sample to determine contaminant concentrations. Results are presented simply to the user—with
calibration-free analysis performed over a wide concentration range. This project represents a beach-head
market opportunity for a platform technology capable of measuring a wide-range of metals in water.
The specific Phase II goal is to develop, evaluate, and validate our innovative technology into an online,
autonomous selenium analysis platform, enabling Phase III commercial activities. During the Phase I
project, OndaVia demonstrated the feasibility of semi-continuous selenium analysis in coal-fired power
plant waste water, achieving a 2.5-ppb minimum detection limit in real-world water samples. Our auto-
calibrating, modular system overcomes the challenges faced by other on-line systems using an optical
method coupled with an internal standard to determine selenium concentration. With the further capability
to speciate selenium, and future potential to measure arsenic and nitrate with the sample platform,
OndaVia’s approach addresses the needs of industry in the years to come.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Semi-continuous, on-line monitoring of selenium in coal-fired power plant waste water
-
批准号:10224199
-
项目类别:
-
资助金额:$47.32万
-
财政年份:2020
-
负责人:Mark C Peterman
-
依托单位:
Fast, quantitative analysis of trichloroethylene (TCE) in water
-
批准号:9048306
-
项目类别:
-
资助金额:$14.9万
-
财政年份:2015
-
负责人:Mark C Peterman
-
依托单位:
海外基金