Integration of ERP and an optimal plan for inventory layout
ERP集成和库存布局优化计划
基本信息
- 批准号:526379-2018
- 负责人:
- 金额:$ 1.81万
- 依托单位:
- 依托单位国家:加拿大
- 项目类别:Engage Grants Program
- 财政年份:2018
- 资助国家:加拿大
- 起止时间:2018-01-01 至 2019-12-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
At present the primary challenge for the industry partner, ACQBUILT, Inc., is not only to improve its**manufacturing process in order to reduce time and cost, but to improve inventory management in accordance**with the JIT principle (which can also provide significant benefits such as increased cash flow by reducing the**inventory holding cost), and to establish real-time data collection for more effective decision making. Although**these inventory management operations are supportive services considered vital from a management**perspective, ineffective control of inventory and internal supply chain can disrupt the company's cash flow and**lower its productivity. Hence, the industry partner is seeking to improve the performance of inventory**management such that real-time data collection can be achieved in terms of both field operation and**administrative aspects of the ERP system. In order to improve the current state, a four-step methodology is**proposed that will be carried out over six months in collaboration with the industry partner.**STAGE 1: Analyze the efficiency of the current state of inventory management and processes; STAGE 2:**Develop a real-time data acquisition system to collect real-time data for inventory management; STAGE 3:**Plan and develop an integrated material management system to collaborate with the existing ERP system;**STAGE 4: Plan an optimal inventory layout based on cost-benefit analysis, and identify avenues for future**research**A material management system can capture all dynamic data in real time and effectively synthesize it along the**internal supply chain associated with various types of resources. With the assistance of a feature-based**modelling method, real-time information collection can be merged into an ERP system. For these reasons, this**research will benefit the industry partner (and the construction manufacturing industry in general), and enhance**its inventory and supply chain management practice in order to further leverage the benefits of a construction**manufacturing approach.
目前,行业合作伙伴ACQBUILT, Inc.面临的主要挑战不仅是改进其制造工艺以减少时间和成本,而且要根据JIT原则改进库存管理(这也可以通过降低库存持有成本来增加现金流等显著效益),并建立实时数据收集以进行更有效的决策。虽然从管理的角度来看,这些库存管理操作是至关重要的支持性服务,但对库存和内部供应链的无效控制可能会扰乱公司的现金流,降低生产力。因此,工业伙伴正在设法改进库存管理的性能,以便能够在ERP系统的现场操作和管理方面实现实时数据收集。为了改善目前的状况,提出了一个四步骤的方法,将在六个月内与行业合作伙伴合作实施。**第一阶段:分析当前库存管理和流程的效率状况;第二阶段:**开发实时数据采集系统,收集库存管理的实时数据;第三阶段:**计划和开发一个集成的物料管理系统,与现有的ERP系统协同工作;**STAGE 4:基于成本效益分析,规划最优库存布局,并确定未来**研究的途径**物料管理系统可以实时捕获所有动态数据,并沿着**与各类资源相关的内部供应链进行有效的综合。借助基于特征的**建模方法,可以将实时信息采集合并到ERP系统中。由于这些原因,这项研究将有利于行业合作伙伴(以及一般的建筑制造业),并加强其库存和供应链管理实践,以进一步利用建筑制造方法的好处。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Ma, Yongsheng其他文献
Identification and characterization of bicistronic speB and prsA gene expression in the group A streptococcus
- DOI:
10.1128/jb.01059-06 - 发表时间:
2006-11-01 - 期刊:
- 影响因子:3.2
- 作者:
Ma, Yongsheng;Bryant, Amy E.;Stevens, Dennis L. - 通讯作者:
Stevens, Dennis L.
A survey of manufacturing oriented topology optimization methods
- DOI:
10.1016/j.advengsoft.2016.07.017 - 发表时间:
2016-10-01 - 期刊:
- 影响因子:4.8
- 作者:
Liu, Jikai;Ma, Yongsheng - 通讯作者:
Ma, Yongsheng
Force calculation using analytical and CAE methods for thin-blade slotting process
- DOI:
10.1080/23311916.2017.1412106 - 发表时间:
2017-12-14 - 期刊:
- 影响因子:1.9
- 作者:
Kordestany, Yazdan;Ma, Yongsheng - 通讯作者:
Ma, Yongsheng
Feature-based intelligent system for steam simulation using computational fluid dynamics
- DOI:
10.1016/j.aei.2018.08.011 - 发表时间:
2018-10-01 - 期刊:
- 影响因子:8.8
- 作者:
Li, Lei;Lange, Carlos F.;Ma, Yongsheng - 通讯作者:
Ma, Yongsheng
Association of design and computational fluid dynamics simulation intent in flow control product optimization
- DOI:
10.1177/0954405417697352 - 发表时间:
2018-11-01 - 期刊:
- 影响因子:2.6
- 作者:
Li, Lei;Lange, Carlos F.;Ma, Yongsheng - 通讯作者:
Ma, Yongsheng
Ma, Yongsheng的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Ma, Yongsheng', 18)}}的其他基金
Advanced Feature Semantics Modeling Methodology and Technology Development in a Smart Product and Process Engineering Regime
智能产品和过程工程体系中的高级特征语义建模方法和技术开发
- 批准号:
RGPIN-2020-03956 - 财政年份:2022
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Advanced Feature Semantics Modeling Methodology and Technology Development in a Smart Product and Process Engineering Regime
智能产品和过程工程体系中的高级特征语义建模方法和技术开发
- 批准号:
RGPIN-2020-03956 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Advanced Feature Semantics Modeling Methodology and Technology Development in a Smart Product and Process Engineering Regime
智能产品和过程工程体系中的高级特征语义建模方法和技术开发
- 批准号:
RGPIN-2020-03956 - 财政年份:2020
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Unified Feature-based Product and Process Modeling and for Energy Engineering
用于能源工程的基于特征的统一产品和过程建模
- 批准号:
RGPIN-2014-05641 - 财政年份:2018
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Optimal design of facility layout for manufacturing system
制造系统设施布局优化设计
- 批准号:
514473-2017 - 财政年份:2017
- 资助金额:
$ 1.81万 - 项目类别:
Engage Grants Program
Unified Feature-based Product and Process Modeling and for Energy Engineering
用于能源工程的基于特征的统一产品和过程建模
- 批准号:
RGPIN-2014-05641 - 财政年份:2017
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Unified Feature-based Product and Process Modeling and for Energy Engineering
用于能源工程的基于特征的统一产品和过程建模
- 批准号:
RGPIN-2014-05641 - 财政年份:2016
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Integrated design and quality conformance of parts manufactured via fused deposition modeling
通过熔融沉积建模制造的零件的集成设计和质量一致性
- 批准号:
491751-2015 - 财政年份:2015
- 资助金额:
$ 1.81万 - 项目类别:
Engage Grants Program
Unified Feature-based Product and Process Modeling and for Energy Engineering
用于能源工程的基于特征的统一产品和过程建模
- 批准号:
RGPIN-2014-05641 - 财政年份:2015
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
Unified Feature-based Product and Process Modeling and for Energy Engineering
用于能源工程的基于特征的统一产品和过程建模
- 批准号:
RGPIN-2014-05641 - 财政年份:2014
- 资助金额:
$ 1.81万 - 项目类别:
Discovery Grants Program - Individual
相似国自然基金
TRPV1-HDAC2轴介导ERp44拟素化修饰在心肌缺血再灌注损伤中的机制研究
- 批准号:JCZRLH202500162
- 批准年份:2025
- 资助金额:0.0 万元
- 项目类别:省市级项目
顾及多尺度效应和有效角动量的地球自转参数(ERP)预报研究
- 批准号:
- 批准年份:2024
- 资助金额:0.0 万元
- 项目类别:省市级项目
基于fMRI大尺度时变网络变异性的个体ERP波形预测研究
- 批准号:82372084
- 批准年份:2023
- 资助金额:48 万元
- 项目类别:面上项目
顾及有效角动量信息和近期观测数据的地球自转参数(ERP)预报算法研究
- 批准号:42374015
- 批准年份:2023
- 资助金额:51 万元
- 项目类别:面上项目
未成年网络游戏成瘾者的冲动决策表现及其ERP机制
- 批准号:2023JJ40205
- 批准年份:2023
- 资助金额:0.0 万元
- 项目类别:省市级项目
基于ERP、溯源定位和SIRT1/CRTC1通路研究脑小血管病认知障碍及番茄红素微乳保护机制
- 批准号:82301474
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
基于ERP和眼跳预测轻度认知功能障碍转归的纵向研究
- 批准号:
- 批准年份:2022
- 资助金额:30 万元
- 项目类别:青年科学基金项目
ADHD儿童执行功能障碍的fNIRS和ERP多模态研究
- 批准号:
- 批准年份:2022
- 资助金额:52 万元
- 项目类别:面上项目
二硫键异构酶ERp72调控静脉血栓形成的作用与机制
- 批准号:
- 批准年份:2022
- 资助金额:52 万元
- 项目类别:面上项目
TXNIP通过ERp44介导内质网-线粒体Ca2+输送功能异常在心肌缺血/再灌注损伤中的作用及机制研究
- 批准号:
- 批准年份:2022
- 资助金额:30 万元
- 项目类别:青年科学基金项目
相似海外基金
Neural signatures of spontaneous level-2 perspective taking: an EEG ERP study
自发 2 级换位思考的神经特征:脑电图 ERP 研究
- 批准号:
559900-2021 - 财政年份:2022
- 资助金额:
$ 1.81万 - 项目类别:
Alexander Graham Bell Canada Graduate Scholarships - Doctoral
ERP studies of acute influences of THC and CBD on memory encoding and retrieval processes
THC 和 CBD 对记忆编码和检索过程的急性影响的 ERP 研究
- 批准号:
10297708 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
ERP studies of acute influences of THC and CBD on memory encoding and retrieval processes
THC 和 CBD 对记忆编码和检索过程的急性影响的 ERP 研究
- 批准号:
10624345 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
Neural signatures of spontaneous level-2 perspective taking: an EEG ERP study
自发 2 级换位思考的神经特征:脑电图 ERP 研究
- 批准号:
559900-2021 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
Alexander Graham Bell Canada Graduate Scholarships - Doctoral
ERP studies of acute influences of THC and CBD on memory encoding and retrieval processes
THC 和 CBD 对记忆编码和检索过程的急性影响的 ERP 研究
- 批准号:
10459601 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
Doctoral Dissertation: Does Speaking Improve Comprehension and Processing of a Foreign Language? A Computer-Assisted Language Learning and ERP Study
博士论文:口语能否提高外语的理解和处理能力?
- 批准号:
2040812 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
Standard Grant
Cortical Hyperexcitability and Attention using ERP
使用 ERP 提高皮质过度兴奋性和注意力
- 批准号:
564815-2021 - 财政年份:2021
- 资助金额:
$ 1.81万 - 项目类别:
University Undergraduate Student Research Awards
ERP/fMRI同時計測によるモラル判断に関わる脳活動の発達的変化の解明
通过同步 ERP/fMRI 测量阐明与道德判断相关的大脑活动的发育变化
- 批准号:
20K03363 - 财政年份:2020
- 资助金额:
$ 1.81万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Programming in the Brain: An ERP Study of the Neurocognitive Mechanisms Supporting Programming Language Processing
大脑编程:支持编程语言处理的神经认知机制的 ERP 研究
- 批准号:
556389-2020 - 财政年份:2020
- 资助金额:
$ 1.81万 - 项目类别:
Alexander Graham Bell Canada Graduate Scholarships - Master's
Reverse supply chain management ERP system for E-waste
电子垃圾逆向供应链管理ERP系统
- 批准号:
134005 - 财政年份:2020
- 资助金额:
$ 1.81万 - 项目类别:
CR&D Bilateral