Collection of Perishable Data from the October 1987 WhittierNarrows Earthquake for Unreinforced and Reinforced Masonry Buildings
Collection of Perishable Data from the October 1987 WhittierNarrows Earthquake for Unreinforced and Reinforced Masonry Buildings
批准号:
8803058
负责人:
Robert Englekirk
金额:
$0.0万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1988
资助国家:
美国
项目状态:
已结题
起止时间:
1988-01-01 至 1989-06-30
中文摘要
这项研究项目涉及收集10月1日和4日惠蒂尔窄地震的易腐烂数据,这些数据来自选定地区的砖石建筑和大洛杉矶地区特别感兴趣的个别建筑。这包括每个选定区域中损坏和未损坏的建筑的未加固和加固砖石建筑数据。将对记录有强震数据的地区进行研究。这些数据将为进一步研究从惠蒂尔纳罗斯地震中吸取的教训提供知识基础。
英文摘要
This research project is concerned with collecting perishable data from the October 1 and 4 Whittier Narrows earthquakes from masonry buildings in selected regions and from individual buildings of particular interest in the greater Los Angeles area. This includes both unreinforced and reinforced masonry building data for damaged and undamaged buildings in each region selected. Regions with recorded strong motion data will be studied. These data will form a knowledge base for further studies on lessons learned from the Whittier Narrows Earthquake.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Press Project 1.1: Concept Development
-
批准号:9011671
-
项目类别:Continuing grant
-
资助金额:$0.0万
-
财政年份:1990
-
负责人:Robert Englekirk
-
依托单位:
Force Displacement Models for Masonry Components
-
批准号:8722869
-
项目类别:Continuing grant
-
资助金额:$34.41万
-
财政年份:1988
-
负责人:Robert Englekirk
-
依托单位:
Analysis Models for Masonry Components and Structures
-
批准号:8517022
-
项目类别:Continuing grant
-
资助金额:$0.0万
-
财政年份:1986
-
负责人:Robert Englekirk
-
依托单位:
Increasing Strength and Ductility in Concrete Masonry Shear Walls Using Confinement (Phase II)
-
批准号:8420384
-
项目类别:Standard Grant
-
资助金额:$0.0万
-
财政年份:1986
-
负责人:Robert Englekirk
-
依托单位:
Increasing Strength and Ductility in Concrete Masonry Shear Walls Using Confinement
-
批准号:8360799
-
项目类别:Standard Grant
-
资助金额:$3.43万
-
财政年份:1984
-
负责人:Robert Englekirk
-
依托单位:
Analysis of the Imperial County Services Building
-
批准号:8013663
-
项目类别:Standard Grant
-
资助金额:$0.0万
-
财政年份:1981
-
负责人:Robert Englekirk
-
依托单位:
Earthquake Damage Evaluation
-
批准号:8009902
-
项目类别:Standard Grant
-
资助金额:$0.0万
-
财政年份:1980
-
负责人:Robert Englekirk
-
依托单位:
海外基金