Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
批准号:
LP0219306
负责人:
Prof Robin Fell
金额:
$8.91万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2002
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2002-04-11 至 2005-12-31
中文摘要
土石坝的破坏和事故有一半是由内部侵蚀和管涌引起的。从历史上看,大约2%的大坝受到了影响。最常见的侵蚀起因是低应力区的裂缝或水力压裂。这
英文摘要
Internal erosion and piping causes half of embankment dam failures and accidents. Historically about two percent of dams have been affected. The most common cause of initiation of erosion is in cracks or by hydraulic fracture in low stress zones. This
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Erosion of embankment dams and dam spillways
-
批准号:LP110100389
-
项目类别:Linkage Projects
-
资助金额:$33.42万
-
财政年份:2011
-
负责人:Prof Robin Fell
-
依托单位:
Cracking of Embankment Dams Under Normal Operating, and Flood Conditions, and the Implications for Internal Erosion and Piping Failure
-
批准号:ARC : LP0219306
-
项目类别:Linkage Projects
-
资助金额:$12.85万
-
财政年份:2002
-
负责人:Prof Robin Fell
-
依托单位:
海外基金