课题基金 / 基金详情

Initial imperfections and pipeline buckling

Initial imperfections and pipeline buckling
初始缺陷和管道屈曲
批准号:
386335-2009
负责人:
Adeeb, Samer
金额:
$5.83万
依托单位:
依托单位国家:
加拿大
项目类别:
Collaborative Research and Development Grants
财政年份:
2009
资助国家:
加拿大
项目状态:
已结题
起止时间:
2009-01-01 至 2010-12-31

项目摘要

项目成果

Adeeb, Samer的其他基金

相似基金

相关文献

中文摘要
翻译
对能源的高需求要求将气体和液体能源从北方地区安全运输到需求地区。最近,冶金学的进步已经允许制造用于容纳和运输这种材料的高强度钢管道。虽然这些高强度管道允许通过减少所需的壁厚来降低初始成本,但是它们也容易受到可能导致大变形的地面运动的影响。这种地面移动主要是由于地面斜坡的移动和冻融区域的相对沉降。在严重的地面移动情况下,这些大的变形可能导致对工业和环境产生非常大影响的遏制损失。阿尔伯塔大学与管道行业合作,广泛研究了管道的大变形(以皱纹和波纹的形式出现),并确定了管道中产生波纹的主要因素是管道轮廓中初始缺陷的数量和分布(例如,不圆度、不直度、波纹)。虽然数值模型能够根据初始缺陷的一定分布预测管道的行为,但没有关于管道轮廓和相关初始缺陷的数据。目前的项目建议测量制造管道内的初始缺陷量,并比较行业中经常使用的不同管道制造商。拟议项目依赖于制造特殊设备和购买高分辨率相机系统,这些系统能够以非常高的精度快速描绘管道。研究结果将有助于对初始缺陷的类型、程度和分布进行分类,并允许对承受大变形的能源管道进行准确建模。
英文摘要
The high demand of energy requires the safe transport of gaseous and liquid energy resources from northern regions to areas of demand. Recently, the advance in metallurgy has allowed the manufacturing of high strength steel pipelines for the containment and transport of such material. While these high strength pipelines allow for the reduction of the initial cost by reducing the wall thickness required, they are also susceptible to ground movements that can cause large deformations. Such ground movements are primarily due to movement of ground slopes and relative settlement of areas of freezing and thawing. In severe ground movement cases, these large deformations can lead to loss of containment with very high impact on the industry and the environment. The University of Alberta in collaboration with the pipeline industry has been extensively studying the large deformations of pipelines in the forms of wrinkles and buckles and has identified that a major factor for the initiation of buckles in a pipeline is the amount and distribution of the initial imperfections in the pipeline profile (e.g. out or roundness, out of straightness, ripples). While numerical models are able to predict the behaviour of the pipeline based on a certain distribution of initial imperfections, no data is available on the pipeline profile and the associated initial imperfections. The current project proposes measuring the amount of initial imperfections within manufactured pipelines and comparing the different pipeline manufacturers that are frequently employed in the industry. The proposed project relies on manufacturing special devices and the purchase of high resolution camera systems that are able to quickly profile the pipeline with very high accuracy. The results will help categorize the type, extent and distribution of the initial imperfections and will allow for accurate modelling of energy pipelines subjected to large deformations.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Fracture Criteria for XFEM for pipeline steels
  • 批准号:
    RGPIN-2020-04041
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2022
  • 负责人:
    Adeeb, Samer
  • 依托单位:
Fracture Criteria for XFEM for pipeline steels
  • 批准号:
    RGPIN-2020-04041
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2021
  • 负责人:
    Adeeb, Samer
  • 依托单位:
Fracture criterion for XFEM to predict burst pressure of dents with cracks in pipeline steels
  • 批准号:
    536002-2018
  • 项目类别:
    Collaborative Research and Development Grants
  • 资助金额:
    $4.3万
  • 财政年份:
    2020
  • 负责人:
    Adeeb, Samer
  • 依托单位:
Fracture Criteria for XFEM for pipeline steels
  • 批准号:
    RGPIN-2020-04041
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2020
  • 负责人:
    Adeeb, Samer
  • 依托单位:
海外基金