课题基金 / 基金详情

Risk identification, impact, and mitigation for maintenance and rehabilitation of Heritage Places (HeritagePlaces@Risk)

Risk identification, impact, and mitigation for maintenance and rehabilitation of Heritage Places (HeritagePlaces@Risk)
遗产地维护和修复的风险识别、影响和缓解措施 (HeritagePlaces@Risk)
批准号:
RGPIN-2014-04002
负责人:
SantanaQuintero, Mario
金额:
$1.46万
依托单位:
依托单位国家:
加拿大
项目类别:
Discovery Grants Program - Individual
财政年份:
2018
资助国家:
加拿大
项目状态:
已结题
起止时间:
2018-01-01 至 2019-12-31

项目摘要

项目成果

SantanaQuintero, Mario的其他基金

相似基金

相关文献

中文摘要
翻译
鉴于加拿大和世界各地的大量遗产地不断受到各种风险的压力,(自然灾害,发展,旅游,污染,不适当的现场管理,疏忽工程,抢劫和冲突)该计划的长期目标是制定一个5维(X,Y,Z,时间和事件)资源管理信息系统,该系统将能够系统地识别世界遗产地的风险,利用最先进的数字化工具评估其影响和遗产结构的脆弱性。这一办法将考虑到这些威胁取决于其所在地点的性质、具体特点、固有的抵抗力和地理环境。这将使研究人员、现场管理人员和有关当局能够规划更深入的工程评估和成本效益分析,从而更有效地减少风险。该研究计划的短期目标(未来五年)包括巩固世界遗产地“风险评估”的方法,以发展5D(X,Y,Z,时间和事件)风险管理(教科文组织),研究将在加拿大进行,建立在过去四年开展的工作以及与这些领域机构正在进行的合作框架的基础上。这些地点的工作将涉及三维记录工具(3D扫描和摄影测量)、地理信息系统(GIS)和建筑信息管理(BIM)应用程序,以绘制世界遗产地。以及研究和描述自然或人为的威胁,即人为的威胁。正如正在进行的项目所建议的那样,自然风险可以分为两类:对遗产地产生直接影响的灾难性和突发性事件,如洪水或地震;以及具有累积和缓慢影响的持续威胁,如侵蚀和物质腐烂。人为风险来自若干不同的人类活动,包括一般的发展,特别是旅游业,以及管理不当、缺乏维护和忽视。
英文摘要
Given that a significant number of heritage sites in Canada and around the world are under constant (ongoing) pressure from a variety of risks (Natural disasters, development, tourism, pollution, inappropriate site management, negligent engineering works, looting and conflict) the long-term objective of this program is to develop a 5 dimensional (X, Y, Z, time and event) resource management information system that will enable the systematic identification of risk at world heritage sites, assessing their impact and the vulnerability of the heritage fabric using state-of-the-arts digital tools. This approach will take into consideration that these threats are dependent on the nature, specific characteristics, inherent resistance and geographical environment of the site where they are located. This would then enable researchers, site managers and concerned authorities to plan more in-depth engineering assessments and cost-benefit analysis, therefore mitigating risks more efficiently. The short-term objectives (next five years) of this research program involves the consolidation of a methodology for "risk assessment" at World Heritage Sites to develop the 5D (X,Y,Z, time and event) management of risk (UNESCO), the research will be conducted in Canada, building on the previous worked carried out in the past four years and the ongoing collaboration framework with institutions working in these areas. The work in these locations will involve three-dimensional recording tools (3D scanning and photogrammetry), Geographic Information Systems (GIS), and Building Information Management (BIM) applications for mapping World Heritage Sites. As well as, the study and characterization of threats that can be either natural or anthropogenic: that is, human-made. As suggested in the ongoing projects, natural risks can be divided into two categories: catastrophic and sudden occurrences, such as a flood or an earthquake, which have an immediate impact on heritage sites, and continuous threats with cumulative and slow effects, such as erosion and material decay. Anthropogenic risks result from a number of different human activities, including development in general and tourism in particular, and inappropriate management, lack of maintenance and neglect.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Conserving the Past for the Future: supporting sustainable rehabilitation of Existing/Historic Buildings
  • 批准号:
    RGPIN-2020-06487
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2022
  • 负责人:
    SantanaQuintero, Mario
  • 依托单位:
Conserving the Past for the Future: supporting sustainable rehabilitation of Existing/Historic Buildings
  • 批准号:
    RGPIN-2020-06487
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2021
  • 负责人:
    SantanaQuintero, Mario
  • 依托单位:
Conserving the Past for the Future: supporting sustainable rehabilitation of Existing/Historic Buildings
  • 批准号:
    RGPIN-2020-06487
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2020
  • 负责人:
    SantanaQuintero, Mario
  • 依托单位:
Engineering Students Supporting Heritage and Sustainability (Heritageengineering)
  • 批准号:
    465459-2015
  • 项目类别:
    Collaborative Research and Training Experience
  • 资助金额:
    $21.86万
  • 财政年份:
    2020
  • 负责人:
    SantanaQuintero, Mario
  • 依托单位:
国内基金
海外基金
脊髓新鉴定SNAPR神经元相关环路介导SCS电刺激抑制恶性瘙痒
  • 批准号:
    82371478
  • 项目类别:
    面上项目
  • 资助金额:
    48.00万元
  • 批准年份:
    2023
  • 负责人:
    焦英甫
  • 依托单位:
面向人工智能生成内容的风险识别与治理策略研究
  • 批准号:
    72304290
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    30.00万元
  • 批准年份:
    2023
  • 负责人:
    向安玲
  • 依托单位:
Identification and quantification of primary phytoplankton functional types in the global oceans from hyperspectral ocean color remote sensing
  • 批准号:
    --
  • 项目类别:
    --
  • 资助金额:
    160万元
  • 批准年份:
    2022
  • 负责人:
    李忠平
  • 依托单位:
白桦雄花早期发育转录组分析及重要基因功能鉴定
  • 批准号:
    31100449
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    23.0万元
  • 批准年份:
    2011
  • 负责人:
    刘雪梅
  • 依托单位: