Risk assessment of ground hazards along railways - Phase IV
Risk assessment of ground hazards along railways - Phase IV
批准号:
549684-2019
负责人:
Hendry, MichaelMT
金额:
$14.26万
依托单位:
依托单位国家:
加拿大
项目类别:
Alliance Grants
财政年份:
2022
资助国家:
加拿大
项目状态:
已结题
起止时间:
2022-01-01 至 2023-12-31
中文摘要
加拿大铁路行业的独特之处在于,它必须维护穿越不同地理区域的数万公里长的铁轨。评估不同地貌和地质领域的地面灾害风险对铁路工程师来说是一个巨大的挑战,因为与单一场地设施相比,线性设施固有地暴露于更广泛的种类和更高的频率。铁路沿线遇到的地面灾害分为:土质滑坡、岩质滑坡、塌陷、泥石流、水流侵蚀和溪流侵蚀。据铁路行业估计,这些地面灾害每年造成的损失高达数百万美元,主要是因为基础设施受损和业务中断。所有工程项目都有风险。我们评估这种风险的能力取决于我们对所涉及的过程和危险的理解。研究将包括(1)开发和评估监测技术,以调查地面灾害机制和预警系统;(2)调查极端天气事件的影响和对气候变化的适应;(3)评估多尺度危害;以及(4)评估软基补救工作的有效性。该计划将在艾伯塔大学和女王大学与行业合作伙伴密切合作进行。这项研究的结果将为未来几十年基础设施的必要改善提供信息并做出贡献。这将提高加拿大铁路网的可靠性和弹性,并使行业运营/基础设施能够适应新的铁路交通要求和日益频繁的极端天气事件。向更广泛的技术社区传播结果和培训HQP以解决现实世界的工程问题是该计划的基本要素。
英文摘要
The Canadian railway industry is unique in that it must maintain tens of thousands of kilometres of tracks that traverse diverse physiographic regions. Assessing ground hazard risk in diverse physiographic and geologic domains presents a significant challenge to railway engineers as linear facilities are inherently exposed to a wider variety and higher frequency of ground hazards than single site facilities. Ground hazards encountered along railways are classified as: earth landslides, rock landslides, subsidence, debris slides, flow erosion and stream erosion. These ground hazards cause a significant annual loss, estimated by the railway industry, to be in the millions of dollars, primarily from damage to infrastructure and interruption of business.All engineering projects have risk. Our ability to assess this risk is dependent on our understanding of the processes and hazards involved. Research will include (1) developing and evaluating monitoring technologies for the investigation of ground hazard mechanisms and warning systems, (2) investigating the impact of extreme weather events and adaptation to climate change, and (3) assessing multi-scale hazards; and (4) evaluate the effectiveness of soft subgrade remediation efforts. The program will be carried out at the University of Alberta and at Queen's University, in close collaboration with the industry partners. The results of this research will inform and contribute to necessary improvements to infrastructure over the next couple of decades. This will increase the reliability and resiliency of Canada's railway networks and enable industry operations/infrastructure to adapt to new rail traffic requirements and the increasing frequency of extreme weather events. The dissemination of results to the wider technical community and the training of HQP to solve real world engineering problems are essential elements of this program.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
NSERC Industrial Research Chair in Railway Engineering
-
批准号:544435-2018
-
项目类别:Industrial Research Chairs
-
资助金额:$6.19万
-
财政年份:2022
-
负责人:Hendry, MichaelMT
-
依托单位:
The pore pressure behaviour of argillaceous formations subjected to induced shear
-
批准号:554460-2020
-
项目类别:Alliance Grants
-
资助金额:$7.28万
-
财政年份:2022
-
负责人:Hendry, MichaelMT
-
依托单位:
国内基金
海外基金
基于重要农地保护LESA(Land Evaluation and Site Assessment)体系思想的高标准基本农田建设研究
-
批准号:41340011
-
项目类别:专项基金项目
-
资助金额:20.0万元
-
批准年份:2013
-
负责人:钱凤魁
-
依托单位:
城镇居民亚健康状态的评价方法学及健康管理模式研究
-
批准号:81172775
-
项目类别:面上项目
-
资助金额:14.0万元
-
批准年份:2011
-
负责人:许军
-
依托单位: