Risk Propagation of Delayed Payment in Stakeholder Network of Large Hydropower Project Construction considering Risk Resistance and Mitigation

Risk Propagation of Delayed Payment in Stakeholder Network of Large Hydropower Project Construction considering Risk Resistance and Mitigation
复制标题

考虑风险抵御与缓解的大型水电工程建设利益相关者网络延期付款风险传播

DOI:
10.1155/2018/8013207
复制
发表时间:
2018-07
影响因子:
--
通讯作者:
Zhao Maoyang
Zhao Maoyang
中科院分区:
工程技术4区
文献类型:
--
作者:
Chen Yun;Hu Zhigen;Liu Quan;Zhao Maoyang

文献摘要

参考文献

被引文献

相似文献

大型水电项目在建设阶段涉及众多利益相关者。通过复杂的利益相关者关系,延迟付款的风险可能会升级为灾难性的经济损失事件。本文构建了一个复杂的利益相关者网络
Large hydropower project involves numerous stakeholders in the construction phase. The risk of delayed payment may escalate into an event of catastrophic economic loss through complex stakeholders’ relationships. This paper builds a complex stakeholder ne
DOI: 10.1007/s11771-011-0731-5
发表时间: 2011-04
影响因子: --
作者:
Dan-chi Wang;Lung-chang Wang
通讯作者: Dan-chi Wang;Lung-chang Wang
DOI: 10.1016/j.coche.2016.07.006
发表时间: 2016-11
影响因子: 6.6
作者:
F. Khan;S. Hashemi;N. Paltrinieri;P. Amyotte;V. Cozzani;G. Reniers
通讯作者: F. Khan;S. Hashemi;N. Paltrinieri;P. Amyotte;V. Cozzani;G. Reniers
高风险水电建设项目工作系统安全评估的混合方法
DOI: 10.1016/j.ssci.2013.12.008
发表时间: 2014-04
期刊: Safety Science
影响因子: 6.1
作者:
Jian-Lan Zhou;Ze-Hua Bai;Zhi-Yu Sun
通讯作者: Zhi-Yu Sun
DOI: 10.1007/s00603-016-0949-5
发表时间: 2016-08-01
影响因子: 6.2
作者:
Liu, Guo-Feng;Feng, Xia-Ting;Duan, Shu-Qian
通讯作者: Duan, Shu-Qian
DOI: 10.1088/0305-4470/26/15/020
发表时间: 1993-08-07
期刊: JOURNAL OF PHYSICS A-MATHEMATICAL AND GENERAL
影响因子: --
作者:
BOCCARA, N;CHEONG, K
通讯作者: CHEONG, K