Collaborative Research: Risk Analysis for Evaluation of Bridges
合作研究:桥梁评估的风险分析
基本信息
- 批准号:8516771
- 负责人:
- 金额:$ 12.13万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:1985
- 资助国家:美国
- 起止时间:1985-08-15 至 1988-07-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
Highway bridges are becoming old and as a consequence are deteriorating at a rapid rate. To plan a program of repair, retrofit or replacement, it is necessary to evaluate the current capacity of the bridge. This project will investigate and develop a rational approach to the evaluation of the safety of existing highway bridges and subsequently to develop a decision model based on a reliability analysis.
高速公路桥正在变得陈旧,因此正在迅速恶化。为了规划维修、改造或更换计划,有必要对桥梁的当前通行能力进行评估。该项目将研究和开发一种合理的方法来评估既有公路桥梁的安全性,并随后开发基于可靠性分析的决策模型。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Fred Moses其他文献
Fred Moses的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Fred Moses', 18)}}的其他基金
Travel: To Exchange Information on Bridge Loadings, Fatigueand Reliability with French Researchers
旅行:与法国研究人员交流桥梁荷载、疲劳和可靠性信息
- 批准号:
8414255 - 财政年份:1984
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Reliability and Optimization of Structural Systems
结构系统的可靠性和优化
- 批准号:
7520858 - 财政年份:1975
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
相似国自然基金
Research on Quantum Field Theory without a Lagrangian Description
- 批准号:24ZR1403900
- 批准年份:2024
- 资助金额:0.0 万元
- 项目类别:省市级项目
Cell Research
- 批准号:31224802
- 批准年份:2012
- 资助金额:24.0 万元
- 项目类别:专项基金项目
Cell Research
- 批准号:31024804
- 批准年份:2010
- 资助金额:24.0 万元
- 项目类别:专项基金项目
Cell Research (细胞研究)
- 批准号:30824808
- 批准年份:2008
- 资助金额:24.0 万元
- 项目类别:专项基金项目
Research on the Rapid Growth Mechanism of KDP Crystal
- 批准号:10774081
- 批准年份:2007
- 资助金额:45.0 万元
- 项目类别:面上项目
相似海外基金
Collaborative Research: Understanding and overcoming the impediments to high-risk, high-return science
合作研究:理解并克服高风险、高回报科学的障碍
- 批准号:
2346644 - 财政年份:2024
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: Understanding and overcoming the impediments to high-risk, high-return science
合作研究:理解并克服高风险、高回报科学的障碍
- 批准号:
2346645 - 财政年份:2024
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: CPS: Small: Risk-Aware Planning and Control for Safety-Critical Human-CPS
合作研究:CPS:小型:安全关键型人类 CPS 的风险意识规划和控制
- 批准号:
2423130 - 财政年份:2024
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: Improving Worker Safety by Understanding Risk Compensation as a Latent Precursor of At-risk Decisions
合作研究:通过了解风险补偿作为风险决策的潜在前兆来提高工人安全
- 批准号:
2326937 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Continuing Grant
Collaborative Research: BoCP-Design US-Sao Paulo: Land use change, ecosystem resilience and zoonotic spillover risk
合作研究:BoCP-Design US-Sao Paulo:土地利用变化、生态系统恢复力和人畜共患病溢出风险
- 批准号:
2225023 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: BoCP-Design US-Sao Paulo: Land use change, ecosystem resilience and zoonotic spillover risk
合作研究:BoCP-Design US-Sao Paulo:土地利用变化、生态系统恢复力和人畜共患病溢出风险
- 批准号:
2225022 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: NSFGEO-NERC: Hurricane Risk Amplification and Changing North Atlantic Natural Disasters
合作研究:NSFGEO-NERC:飓风风险放大和改变北大西洋自然灾害
- 批准号:
2244918 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: ATD: Geospatial Modeling and Risk Mitigation for Human Movement Dynamics under Hurricane Threats
合作研究:ATD:飓风威胁下人类运动动力学的地理空间建模和风险缓解
- 批准号:
2319552 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: ATD: Geospatial Modeling and Risk Mitigation for Human Movement Dynamics under Hurricane Threats
合作研究:ATD:飓风威胁下人类运动动力学的地理空间建模和风险缓解
- 批准号:
2319551 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant
Collaborative Research: SOTERIA: Satisfaction and Risk-aware Dynamic Resource Orchestration in Public Safety Systems
合作研究:SOTERIA:公共安全系统中的满意度和风险意识动态资源编排
- 批准号:
2319994 - 财政年份:2023
- 资助金额:
$ 12.13万 - 项目类别:
Standard Grant














{{item.name}}会员




