"What Controls Earthquake Size and Occurrence? II"

“什么控制地震的规模和发生?II”

基本信息

项目摘要

This research is proposed as an Accomplishment Based Renewal based on the strength of the past research of the proposer. Future work will continue to concentrate on the factors that control a major earthquake's size, location, and timing. Using plate tectonics as a framework, measurements will be made of the depth extent and geometry of the seismogenic zone, i.e., that portion of the plate interface capable of generating large earthquakes. The methodology developed to perform this measurement is innovatively flexible and powerful with rigorous statistical error estimates. Measurements will also concentrate on the "inside" part of the earthquake where spatial heterogeneity in coupling strength along the fault controls many features of seismicity and earthquake rupture processes. This research is a component of the National Earthquake Hazard Reduction Program.
本研究是在总结前人研究成果的基础上提出的基于成就的更新方法。未来的工作将继续集中在控制大地震的大小、位置和时间的因素上。以板块构造为框架,将测量孕震带的深度、范围和几何形状,即板块界面上能够发生大地震的那部分。为执行这一测量而开发的方法具有创新的灵活性和强大的功能,并具有严格的统计误差估计。测量还将集中在地震的“内部”部分,在那里,沿断层耦合强度的空间不均一性控制着地震活动和地震破裂过程的许多特征。这项研究是国家减少地震灾害计划的一部分。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Larry Ruff其他文献

Larry Ruff的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Larry Ruff', 18)}}的其他基金

Interaction between Earthquakes, Stress, Temperature, and Fluid Flow in the Seismogenic Zone
地震带中地震、应力、温度和流体流动之间的相互作用
  • 批准号:
    9905503
  • 财政年份:
    1999
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Source Time Functions and Stress Drop
源时间函数和应力下降
  • 批准号:
    9725175
  • 财政年份:
    1998
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Before and Beyond the Earthquake Rupture Process
地震破裂过程之前和之后
  • 批准号:
    9405533
  • 财政年份:
    1994
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Generation Mechanism of Non-Seismic Tsunamis
非地震海啸的发生机制
  • 批准号:
    9405767
  • 财政年份:
    1994
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Continuing Grant
Upgrading the Computer System for Geophysical Research at the University of Michigan
升级密歇根大学地球物理研究计算机系统
  • 批准号:
    9219237
  • 财政年份:
    1993
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
What Controls Earthquake Size & Occurrence?
地震规模由什么控制
  • 批准号:
    8720935
  • 财政年份:
    1988
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Continuing Grant
The Rupture Process of Great Earthquakes
大地震的破裂过程
  • 批准号:
    8407786
  • 财政年份:
    1985
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Presidential Young Investigator Award: Earthquake Seismology
总统青年研究员奖:地震学
  • 批准号:
    8351515
  • 财政年份:
    1984
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Continuing Grant

相似海外基金

Using a dynamic earthquake simulator to investigate controls on slow-slip events, subduction earthquakes, and their interactions
使用动态地震模拟器研究慢滑移事件、俯冲地震及其相互作用的控制
  • 批准号:
    2147340
  • 财政年份:
    2022
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
NSFGEO-NERC Earthquake nucleation versus episodic slow slip: what controls the mode of fault slip?
NSFGEO-NERC 地震成核与幕式慢滑移:什么控制断层滑移模式?
  • 批准号:
    NE/V011804/1
  • 财政年份:
    2021
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Research Grant
NSFGEO-NERC: Earthquake nucleation versus episodic slow slip: what controls the mode of fault slip?
NSFGEO-NERC:地震成核与偶发性慢滑移:什么控制断层滑移模式?
  • 批准号:
    2139331
  • 财政年份:
    2021
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Earthquake Precursors and Controls on Earthquake Magnitudes: Probing the Behavior of Megathrust Faults through Numerical Simulations
地震前兆和地震震级的控制:通过数值模拟探讨巨型逆冲断层的行为
  • 批准号:
    1723249
  • 财政年份:
    2017
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
A high-resolution controlled-source seismic experiment to elucidate geologic controls on megathrust slip: the 2014 Pisagua, Chile earthquake sequence as a natural laboratory
高分辨率受控源地震实验,阐明巨型逆冲滑动的地质控制:2014 年智利皮萨瓜地震序列作为天然实验室
  • 批准号:
    1459368
  • 财政年份:
    2016
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Continuing Grant
Monsoon and earthquake controls on sediment flux in an arid bedrock landscape, Zanskar, India
印度赞斯卡干旱基岩景观中季风和地震对沉积物通量的控制
  • 批准号:
    133859300
  • 财政年份:
    2009
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Heisenberg Fellowships
Monsoon and earthquake controls on sediment flux in an arid bedrock landscape, Zanskar, India
印度赞斯卡干旱基岩景观中季风和地震对沉积物通量的控制
  • 批准号:
    133876762
  • 财政年份:
    2009
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Research Grants
Exploring structural controls on great earthquake rupture and architecture of the Sumatra-Andaman convergent margin: A regional seismic reflection survey in collaboration with the
探索大地震破裂的结构控制和苏门答腊-安达曼会聚边缘的建筑:与
  • 批准号:
    0623165
  • 财政年份:
    2007
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Standard Grant
Subduction zone segmentation and controls on earthquake rupture: The 2004 and 2005 Sumatra earthquakes
俯冲带分割和地震破裂控制:2004年和2005年苏门答腊岛地震
  • 批准号:
    NE/D003431/1
  • 财政年份:
    2006
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Research Grant
Subduction zone segmentation and controls on earthquake rupture: The 2004 and 2005 Sumatra earthquakes
俯冲带分割和地震破裂控制:2004年和2005年苏门答腊岛地震
  • 批准号:
    NE/D002575/1
  • 财政年份:
    2006
  • 资助金额:
    $ 14.29万
  • 项目类别:
    Research Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了