Parallel, Asynchronous Global Optimization Techniques for Medium & Large Geophysical Inversion Problems
介质的并行、异步全局优化技术
基本信息
- 批准号:9300992
- 负责人:
- 金额:$ 25万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:1994
- 资助国家:美国
- 起止时间:1994-09-01 至 1996-08-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
ABSTRACT: 9300992, PI-Pereyra: This Phase II SBIR proposal aims to model, design algorithms, and produce software to analyze and interpret seismic data. Enhanced global optimization techniques will be used to filter noisy data and to handle complex geophysical models that are not accessible to computation with the present methods. This project builds upon the results of the work accomplished in Phase I on the construction of global optimization algorithms. The resulting codes and software will find applications in seismic processing, reservoir delineation, and will help with enhanced recovery processes in the oil fields. Applications are also envisioned to non destructive testing of mechanical components in industrial tools.
摘要:9300992,Pi-Pereyra:这个第二阶段的SBIR提案旨在建立模型、设计算法,并生成分析和解释地震数据的软件。增强的全局优化技术将被用来过滤噪声数据和处理复杂的地球物理模型,这些模型无法用目前的方法进行计算。该项目建立在第一阶段关于构建全局优化算法的工作成果的基础上。由此产生的代码和软件将在地震处理、储集层圈定中得到应用,并将有助于油田的强化开采过程。工业工具中机械部件的无损检测也有望得到应用。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Victor Pereyra其他文献
Stability of general systems of linear equations
- DOI:
10.1007/bf01817724 - 发表时间:
1969-06-01 - 期刊:
- 影响因子:0.700
- 作者:
Victor Pereyra - 通讯作者:
Victor Pereyra
Iterated deferred corrections for nonlinear operator equations
- DOI:
10.1007/bf02162030 - 发表时间:
1967-11-01 - 期刊:
- 影响因子:2.200
- 作者:
Victor Pereyra - 通讯作者:
Victor Pereyra
Victor Pereyra的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Victor Pereyra', 18)}}的其他基金
SBIR Phase II: A Toolbox for Optimal Design
SBIR 第二阶段:优化设计工具箱
- 批准号:
0321420 - 财政年份:2003
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
SBIR Phase I: A Toolbox for Optimal Design
SBIR 第一阶段:优化设计工具箱
- 批准号:
0124874 - 财政年份:2002
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Parallel, Asychronous Global Optimization Techniques for Medium and Large Inversion Problems
中大型反演问题的并行异步全局优化技术
- 批准号:
9160572 - 财政年份:1992
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Numerical Algorithms for Cooperative Imaging of Complex Geological Regions
复杂地质区域协同成像的数值算法
- 批准号:
8920545 - 财政年份:1990
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Numerical Algorithms for Cooperative Imaging of Complex Geological Regions
复杂地质区域协同成像的数值算法
- 批准号:
8860588 - 财政年份:1989
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Numerical Methods for Inverse Problems in Three-Dimensional Geophysical Modeling
三维地球物理建模中反问题的数值方法
- 批准号:
8619607 - 财政年份:1987
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Numerical Methods for Inverse Problems in Three-Dimensional Geophysical Modeling
三维地球物理建模中反问题的数值方法
- 批准号:
8560154 - 财政年份:1986
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
相似海外基金
BIGDATA: IA: Collaborative Research: Asynchronous Distributed Machine Learning Framework for Multi-Site Collaborative Brain Big Data Mining
BIGDATA:IA:协作研究:用于多站点协作大脑大数据挖掘的异步分布式机器学习框架
- 批准号:
2348159 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
CAREER: Physics-inspired Machine Learning with Sparse and Asynchronous p-bits
职业:利用稀疏和异步 p 位进行物理启发的机器学习
- 批准号:
2237357 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Continuing Grant
OAC Core: LABIOS: Storage Acceleration via Data Labeling and Asynchronous I/O
OAC 核心:LABIOS:通过数据标签和异步 I/O 进行存储加速
- 批准号:
2313154 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Standard Grant
Asynchronous Scientific Continuous Computations Exploiting Disaggregation (ASCCED)
利用分解的异步科学连续计算 (ASCCED)
- 批准号:
EP/X01794X/1 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Research Grant
Asynchronous Open Online Course Addressing Structural Racism and Discrimination to Reduce Disparities
异步开放在线课程解决结构性种族主义和歧视以减少差异
- 批准号:
10649862 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Large-scale sparse learning using asynchronous architecture for interpretable model
使用异步架构进行可解释模型的大规模稀疏学习
- 批准号:
23K11213 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Development of an Asynchronous Cellular Automata Based on Termites
基于白蚁的异步元胞自动机的开发
- 批准号:
23KJ2050 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Grant-in-Aid for JSPS Fellows
Development of Architectural Educational Reference Tools in Remote and Asynchronous Environments using Object VR
使用对象 VR 在远程和异步环境中开发建筑教育参考工具
- 批准号:
23K02643 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
High throughput asynchronous digital logic implementation flow
高吞吐量异步数字逻辑实现流程
- 批准号:
10074333 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Grant for R&D
Extension of computer vision methods to asynchronous image sensors
将计算机视觉方法扩展到异步图像传感器
- 批准号:
23K16902 - 财政年份:2023
- 资助金额:
$ 25万 - 项目类别:
Grant-in-Aid for Early-Career Scientists














{{item.name}}会员




