课题基金 / 基金详情

Small Grants for Exploratory Research: Collaborative Proposal Rapid Response to the November 14, 2001 Kunlun Fault Earthquake

Small Grants for Exploratory Research: Collaborative Proposal Rapid Response to the November 14, 2001 Kunlun Fault Earthquake
探索性研究小额资助:2001 年 11 月 14 日昆仑断层地震快速响应合作提案
批准号:
0209892
负责人:
Jeffrey Freymueller
金额:
$0.57万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2002
资助国家:
美国
项目状态:
已结题
起止时间:
2002-03-01 至 2004-02-29

项目摘要

项目成果

Jeffrey Freymueller的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
EAR-0209434/EAR-0209892Shen Zheng-Kang/FreymuellerScientist from the University of Alaska, University of California Los Angeles, and the China Seismological Bureau are carrying out a a rapid response to the November 14, 2001 Mw~7.9 Kunlun fault earthquake in Tibet. This earthquake provides a unique opportunity to measure the postseismic deformation of an M~8 earthquake that occurred within a pre-existing geodetic network in which relative site velocities are known to about 1 mm/yr., Three continuously recording GPS sites near the rupture and a fourth about 150 km away were established one week after the event by the China Seismological Bureau. Also, 17 existing and new GPS sites along the Qinghai-Tibet highway were surveyed in December, 2001. A second field campaign is extending GPS network westward from the Qinghai-Tibet highway, adding new sites along the fault on either side of surface rupture in the near field. This survey is repeating measurements at all of the sites surveyed in November-December, providing the initial postseismic results. These measurements will lead to a better understanding of the rheological structure of the exceptionally thick northern Tibetan crust as well as the postseismic processes triggered by such a large event.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Collaborative Research: Revealing the hidden groundwater storage dynamics of the Great Lakes Basin by synthesizing geodesy, hydrologic modeling, and remote sensing
  • 批准号:
    2218028
  • 项目类别:
    Standard Grant
  • 资助金额:
    $95.73万
  • 财政年份:
    2022
  • 负责人:
    Jeffrey Freymueller
  • 依托单位:
Collaborative Research: RAPID: Response to the 29 July 2021 Chignik M8.2 Earthquake
  • 批准号:
    2147422
  • 项目类别:
    Standard Grant
  • 资助金额:
    $7.24万
  • 财政年份:
    2021
  • 负责人:
    Jeffrey Freymueller
  • 依托单位:
Collaborative Research: The M7.8 Simeonof earthquake: Untangling Slip from Seconds to Years across the edge of the Shumagin Seismic Gap
  • 批准号:
    2052558
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $58.19万
  • 财政年份:
    2021
  • 负责人:
    Jeffrey Freymueller
  • 依托单位:
Collaborative Research: RAPID Geodetic Field Response to the 2018 Magnitude 7 Anchorage Earthquake
  • 批准号:
    1917435
  • 项目类别:
    Standard Grant
  • 资助金额:
    $1.5万
  • 财政年份:
    2019
  • 负责人:
    Jeffrey Freymueller
  • 依托单位:
海外基金