RAPID: Collaborative Research: The Impact of Trauma on Economic Preferences
RAPID:合作研究:创伤对经济偏好的影响
基本信息
- 批准号:1145912
- 负责人:
- 金额:$ 6.72万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:2011
- 资助国家:美国
- 起止时间:2011-08-15 至 2014-07-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
In this RAPID project, the Principal Investigators will examine the effects of trauma from the violence of war on risk aversion and other economic attitudes by conducting economic experiments in Afghanistan. The team has preliminary results showing that Afghans who live near a bombing site, when primed to recall a fearful event, are willing to pay far more for certainty in an economic trade-off than is predicted by mainstream economic theory. This project will extend this work to examine the effects of trauma on all of the "Big 5" core factors that significantly shape economic behavior: tolerance for risk, patience and time discounting, social preferences, competitive propensity, and strategic sophistication. These changes in economic attitude can turn individuals away from otherwise beneficial economic opportunities and, society-wide, harm prospects for recovery.In terms of broader impacts, this research will reveal how exposure to violence can dramatically influence many aspects of an individual's economic decision making. The project will also attempt to demonstrate the potential for simple economic instruments to act as diagnostic tools for economists and policy makers to identify potentially at-risk individuals, especially in transitional economies. While conducted with Afghans, these experiments may shed light on the effects of trauma on anyone exposed to violence, including members of the U.S. military and victims of violent crime. More broadly, this work may show shifts in economic attitudes that can have implications for the development and economic growth prospects of war-torn societies.
在这个快速项目中,主要研究人员将通过在阿富汗进行经济实验,研究战争暴力对风险规避和其他经济态度的创伤影响。该团队的初步结果显示,居住在爆炸现场附近的阿富汗人,当他们回忆起一个可怕的事件时,愿意为经济交易中的确定性付出比主流经济理论预测的更多的钱。该项目将扩展这项工作,以研究创伤对所有“五大”核心因素的影响,这些因素显著塑造了经济行为:对风险的容忍度,耐心和时间折扣,社会偏好,竞争倾向和战略复杂性。经济态度的这些变化可能使个人远离原本有益的经济机会,并在整个社会范围内损害恢复的前景,就更广泛的影响而言,这项研究将揭示遭受暴力如何会极大地影响个人经济决策的许多方面。该项目还将试图展示简单的经济手段作为经济学家和决策者的诊断工具的潜力,以查明特别是转型期经济体中可能面临风险的个人。虽然这些实验是在阿富汗人身上进行的,但它们可能会揭示创伤对任何暴露于暴力的人的影响,包括美国军人和暴力犯罪的受害者。更广泛地说,这项工作可能表明经济态度的转变,这可能对受战争破坏的社会的发展和经济增长前景产生影响。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
James Andreoni其他文献
James Andreoni的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('James Andreoni', 18)}}的其他基金
Social Tipping Points and Norm Change in Large-scale Laboratory Experiments
大规模实验室实验中的社会临界点和规范变化
- 批准号:
2242443 - 财政年份:2023
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Doctoral Dissertation Research Improvement in Economics: Supply-Side Responses to Discrimination
经济学博士论文研究的改进:供给方对歧视的反应
- 批准号:
2117463 - 财政年份:2021
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Accomplishment-Based Renewal: Experimental Studies of Time Inconsistent Preferences for Risk Fairness and Charitable Giving
基于成就的更新:风险公平和慈善捐赠的时间不一致偏好的实验研究
- 批准号:
1951167 - 财政年份:2020
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Experimental Studies of Time Inconsistent Preferences for Risk, Fairness, and Charitable Giving
风险、公平和慈善捐赠的时间不一致偏好的实验研究
- 批准号:
1658952 - 财政年份:2017
- 资助金额:
$ 6.72万 - 项目类别:
Continuing Grant
Risk, Time, Altruism, and Emotions
风险、时间、利他主义和情感
- 批准号:
1427355 - 财政年份:2014
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Doctoral Dissertation Research in Economics: Uncertainty Equivalents
经济学博士论文研究:不确定性等价物
- 批准号:
1024683 - 财政年份:2010
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
New Measures of Preferences: Risk, Time, Beliefs, and Social Image
新的偏好衡量标准:风险、时间、信仰和社会形象
- 批准号:
0962484 - 财政年份:2010
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Altruism and Institutions: Theoretical, Econometric and Experimental Studies
利他主义与制度:理论、计量经济学和实验研究
- 批准号:
0701815 - 财政年份:2006
- 资助金额:
$ 6.72万 - 项目类别:
Continuing Grant
Altruism and Institutions: Theoretical, Econometric and Experimental Studies
利他主义与制度:理论、计量经济学和实验研究
- 批准号:
0551296 - 财政年份:2006
- 资助金额:
$ 6.72万 - 项目类别:
Continuing Grant
Altruism and Institutions: Theoretical, Econometric and Experimental Studies
利他主义与制度:理论、计量经济学和实验研究
- 批准号:
0320106 - 财政年份:2003
- 资助金额:
$ 6.72万 - 项目类别:
Continuing Grant
相似海外基金
Collaborative Research: Unlocking the evolutionary history of Schiedea (carnation family, Caryophyllaceae): rapid radiation of an endemic plant genus in the Hawaiian Islands
合作研究:解开石竹科(石竹科)石竹的进化史:夏威夷群岛特有植物属的快速辐射
- 批准号:
2426560 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
RAPID: Reimagining a collaborative future: engaging community with the Andrews Forest Research Program
RAPID:重新构想协作未来:让社区参与安德鲁斯森林研究计划
- 批准号:
2409274 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
- 批准号:
2403883 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425431 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427233 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425430 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427232 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427231 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
- 批准号:
2403882 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425429 - 财政年份:2024
- 资助金额:
$ 6.72万 - 项目类别:
Standard Grant