课题基金 / 基金详情

SBIR Phase I: Analysis of Progress Photos for Indoor Construction Progress Monitoring

SBIR Phase I: Analysis of Progress Photos for Indoor Construction Progress Monitoring
SBIR 第一阶段:室内施工进度监控的进度照片分析
批准号:
1819248
负责人:
Derek Hoiem
金额:
$22.5万
依托单位:
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2018
资助国家:
美国
项目状态:
已结题
起止时间:
2018-06-15 至 2018-11-30

项目摘要

项目成果

Derek Hoiem的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is that it will save billions of dollars by anticipating construction delays and streamlining coordination to prevent them. Lower costs will help upgrade our nation's infrastructure, which is a critical national priority. Many construction companies strongly want a solution to indoor progress monitoring. Laser scanning is too expensive and slow, and photography services can cost hundreds of thousands of dollars for large projects and introduce logistical challenges. The proposed research would simplify the workflow for progress monitoring of interiors by automatically registering 360 degree photos and video and aligning them to building information models (BIM), providing a cheap, quick, and effective solution for daily progress monitoring.This Small Business Innovation Research (SBIR) Phase I project aims to localize images, reconstruct 3D models, align them to floorplans or 3D BIM, and use the aligned models to provide actionable data to construction managers. A main challenge is to robustly solve for camera pose using structure-from-motion in indoor scenes that are unfinished and contain textureless and reflective surfaces. A second challenge is to automatically or semi-automatically register the models to 2D or 3D plans, made more difficult by the fact that the site is incomplete and constantly changing. A third challenge is to create interfaces that project personnel can use to perform visual inspection, progress monitoring, requests for information, and other supervision and coordination tasks. The project will investigate the use of tags (i.e., markers) to improve robustness of 3D reconstruction and to perform registration without requiring the 3D positions of tags to be known in advance. Thus, the project addresses major unsolved problems in computer vision, robotics, and their application to construction management.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
RI: Small: Semantic 3D Neural Rendering Field Models that are Accurate, Complete, Flexible, and Scalable
RI: Small: Recovering Object 3D Shape and Material from Isolated Images
CAREER: Large-Scale Recognition Using Shared Structures, Flexible Learning, and Efficient Search
RI: Medium: Collaborative Research: Physically Grounded Object Recognition
国内基金
海外基金
Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark Supercooled Phase Transition
  • 批准号:
    24ZR1429700
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    YUICHIRO NAKAI
  • 依托单位:
ATLAS实验探测器Phase 2升级
  • 批准号:
    11961141014
  • 项目类别:
    国际(地区)合作与交流项目
  • 资助金额:
    3350万元
  • 批准年份:
    2019
  • 负责人:
    刘衍文
  • 依托单位:
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
  • 批准号:
    41802035
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    12.0万元
  • 批准年份:
    2018
  • 负责人:
    张里
  • 依托单位:
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究