SBIR Phase I: Analysis of Progress Photos for Indoor Construction Progress Monitoring
SBIR 第一阶段:室内施工进度监控的进度照片分析
基本信息
- 批准号:1819248
- 负责人:
- 金额:$ 22.5万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:2018
- 资助国家:美国
- 起止时间:2018-06-15 至 2018-11-30
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is that it will save billions of dollars by anticipating construction delays and streamlining coordination to prevent them. Lower costs will help upgrade our nation's infrastructure, which is a critical national priority. Many construction companies strongly want a solution to indoor progress monitoring. Laser scanning is too expensive and slow, and photography services can cost hundreds of thousands of dollars for large projects and introduce logistical challenges. The proposed research would simplify the workflow for progress monitoring of interiors by automatically registering 360 degree photos and video and aligning them to building information models (BIM), providing a cheap, quick, and effective solution for daily progress monitoring.This Small Business Innovation Research (SBIR) Phase I project aims to localize images, reconstruct 3D models, align them to floorplans or 3D BIM, and use the aligned models to provide actionable data to construction managers. A main challenge is to robustly solve for camera pose using structure-from-motion in indoor scenes that are unfinished and contain textureless and reflective surfaces. A second challenge is to automatically or semi-automatically register the models to 2D or 3D plans, made more difficult by the fact that the site is incomplete and constantly changing. A third challenge is to create interfaces that project personnel can use to perform visual inspection, progress monitoring, requests for information, and other supervision and coordination tasks. The project will investigate the use of tags (i.e., markers) to improve robustness of 3D reconstruction and to perform registration without requiring the 3D positions of tags to be known in advance. Thus, the project addresses major unsolved problems in computer vision, robotics, and their application to construction management.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.
这个小企业创新研究(SBIR)第一阶段项目的更广泛的影响/商业潜力是,它将通过预测施工延误和简化协调来防止延误,从而节省数十亿美元。降低成本将有助于升级我们国家的基础设施,这是一个关键的国家优先事项。许多建筑公司强烈希望有一个室内进度监控的解决方案。激光扫描过于昂贵和缓慢,而摄影服务对于大型项目来说可能要花费数十万美元,并带来后勤挑战。该研究将通过自动注册360度照片和视频并将其与建筑信息模型(BIM)对齐来简化内部进度监控的工作流程,为日常进度监控提供廉价,快速和有效的解决方案。这个小型企业创新研究(SBIR)第一阶段项目旨在本地化图像,重建3D模型,将其与平面图或3D BIM对齐,并使用对齐的模型为施工管理人员提供可操作的数据。一个主要的挑战是鲁棒地解决相机姿态使用结构从运动在室内场景是未完成的,包含无纹理和反射表面。第二个挑战是自动或半自动地将模型配准到2D或3D平面图,由于场地不完整且不断变化,这使得难度更大。第三个挑战是创建项目人员可以用来执行目视检查、进度监控、信息请求以及其他监督和协调任务的界面。该项目将调查标签的使用(即,标记)以提高3D重建的鲁棒性并执行配准,而不需要预先知道标签的3D位置。因此,该项目解决了计算机视觉、机器人技术及其在施工管理中的应用等方面尚未解决的主要问题。该奖项反映了NSF的法定使命,并通过使用基金会的知识价值和更广泛的影响审查标准进行评估,被认为值得支持。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Derek Hoiem其他文献
Learning Curves for Analysis of Deep Networks
深度网络分析的学习曲线
- DOI:
- 发表时间:
2020 - 期刊:
- 影响因子:0
- 作者:
Derek Hoiem;Tanmay Gupta;Zhizhong Li;Michal Shlapentokh - 通讯作者:
Michal Shlapentokh
Analysis of Reviews for CVPR 2012
CVPR 2012 评论分析
- DOI:
- 发表时间:
2012 - 期刊:
- 影响因子:0
- 作者:
A. Khosla;Derek Hoiem;Serge J. Belongie - 通讯作者:
Serge J. Belongie
Object Detection Analysis Code (v2)
物体检测分析代码 (v2)
- DOI:
- 发表时间:
2014 - 期刊:
- 影响因子:0
- 作者:
Derek Hoiem - 通讯作者:
Derek Hoiem
Opportunistic Use of Vision to Push Back the Path-Planning Horizon
机会性地利用视觉来推迟路径规划的范围
- DOI:
10.1109/iros.2006.281676 - 发表时间:
2006 - 期刊:
- 影响因子:0
- 作者:
Bart C. Nabbe;Derek Hoiem;Alexei A. Efros;M. Hebert - 通讯作者:
M. Hebert
C 2013 Pritam Purushothama Sukumar Object Categorization Using Collections of Parts and Second Order Pooling Features
C 2013 Pritam Purushothama Sukumar 使用零件集合和二阶池化特征进行对象分类
- DOI:
- 发表时间:
2013 - 期刊:
- 影响因子:0
- 作者:
Derek Hoiem - 通讯作者:
Derek Hoiem
Derek Hoiem的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Derek Hoiem', 18)}}的其他基金
RI: Small: Semantic 3D Neural Rendering Field Models that are Accurate, Complete, Flexible, and Scalable
RI:小型:准确、完整、灵活且可扩展的语义 3D 神经渲染场模型
- 批准号:
2312102 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
Continuing Grant
RI: Small: Recovering Object 3D Shape and Material from Isolated Images
RI:小:从孤立图像中恢复对象 3D 形状和材质
- 批准号:
1421521 - 财政年份:2014
- 资助金额:
$ 22.5万 - 项目类别:
Continuing Grant
CAREER: Large-Scale Recognition Using Shared Structures, Flexible Learning, and Efficient Search
职业:使用共享结构、灵活学习和高效搜索的大规模识别
- 批准号:
1053768 - 财政年份:2011
- 资助金额:
$ 22.5万 - 项目类别:
Continuing Grant
RI: Medium: Collaborative Research: Physically Grounded Object Recognition
RI:媒介:协作研究:物理接地物体识别
- 批准号:
0904209 - 财政年份:2009
- 资助金额:
$ 22.5万 - 项目类别:
Standard Grant
相似国自然基金
Baryogenesis, Dark Matter and Nanohertz Gravitational Waves from a Dark
Supercooled Phase Transition
- 批准号:24ZR1429700
- 批准年份:2024
- 资助金额:0.0 万元
- 项目类别:省市级项目
ATLAS实验探测器Phase 2升级
- 批准号:11961141014
- 批准年份:2019
- 资助金额:3350 万元
- 项目类别:国际(地区)合作与交流项目
地幔含水相Phase E的温度压力稳定区域与晶体结构研究
- 批准号:41802035
- 批准年份:2018
- 资助金额:12.0 万元
- 项目类别:青年科学基金项目
基于数字增强干涉的Phase-OTDR高灵敏度定量测量技术研究
- 批准号:61675216
- 批准年份:2016
- 资助金额:60.0 万元
- 项目类别:面上项目
基于Phase-type分布的多状态系统可靠性模型研究
- 批准号:71501183
- 批准年份:2015
- 资助金额:17.4 万元
- 项目类别:青年科学基金项目
纳米(I-Phase+α-Mg)准共晶的临界半固态形成条件及生长机制
- 批准号:51201142
- 批准年份:2012
- 资助金额:25.0 万元
- 项目类别:青年科学基金项目
连续Phase-Type分布数据拟合方法及其应用研究
- 批准号:11101428
- 批准年份:2011
- 资助金额:23.0 万元
- 项目类别:青年科学基金项目
D-Phase准晶体的电子行为各向异性的研究
- 批准号:19374069
- 批准年份:1993
- 资助金额:6.4 万元
- 项目类别:面上项目
相似海外基金
SBIR Phase I: Detection of Chronic Diseases via Multiplex Analysis of Circulating Metabolites
SBIR 第一阶段:通过循环代谢物的多重分析检测慢性疾病
- 批准号:
2212865 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
Standard Grant
SBIR Phase II: A novel, microfluidic device to improve collection and analysis of biopsy samples from ocular paracentesis
SBIR II 期:一种新型微流体装置,可改善眼穿刺活检样本的收集和分析
- 批准号:
2233691 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
Cooperative Agreement
SBIR TOPIC 425 PHASE I: POSTURE ANALYSIS THROUGH MACHINE LEARNING (PATHML)
SBIR 主题 425 第一阶段:通过机器学习进行姿势分析 (PATHML)
- 批准号:
10931985 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
SBIR Phase I: The Development of an Artificial Analysis (AI) Static Code Analysis Platform to Increase Software Developer Productivity
SBIR 第一阶段:开发人工分析 (AI) 静态代码分析平台以提高软件开发人员的工作效率
- 批准号:
2318738 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
Standard Grant
SBIR Phase I: A real-time precision nutrient analysis and management system for hydroponic farming operations
SBIR 第一阶段:用于水培农业作业的实时精确养分分析和管理系统
- 批准号:
2210046 - 财政年份:2023
- 资助金额:
$ 22.5万 - 项目类别:
Standard Grant
SBIR Phase II: Innovative Platform for Low Volume Blood Coagulation Analysis
SBIR II 期:低容量凝血分析的创新平台
- 批准号:
2134020 - 财政年份:2022
- 资助金额:
$ 22.5万 - 项目类别:
Cooperative Agreement
SBIR Phase II: 3D Markerless Motion Capture Technology For Gait Analysis
SBIR 第二阶段:用于步态分析的 3D 无标记运动捕捉技术
- 批准号:
2153138 - 财政年份:2022
- 资助金额:
$ 22.5万 - 项目类别:
Cooperative Agreement
SBIR Phase II: Developing a platform for superior predictive analysis of HERG Ion Channel-Drug Interactions for the Comprehensive In-vitro Proarrhythmia Assay (CiPA)
SBIR II 期:开发一个平台,对 HERG 离子通道-药物相互作用进行高级预测分析,用于综合体外致心律失常测定 (CiPA)
- 批准号:
2151522 - 财政年份:2022
- 资助金额:
$ 22.5万 - 项目类别:
Cooperative Agreement
SBIR Phase I: Trustworthy and Automated Electrocardiogram Analysis
SBIR 第一阶段:值得信赖的自动化心电图分析
- 批准号:
2208759 - 财政年份:2022
- 资助金额:
$ 22.5万 - 项目类别:
Standard Grant
SBIR PHASE I TOPIC #439 - ADVANCED SAMPLE PROCESSING PLATFORMS FOR DOWNSTREAM SINGLE-CELL MULTI-OMIC ANALYSIS
SBIR 第一阶段主题
- 批准号:
10724107 - 财政年份:2022
- 资助金额:
$ 22.5万 - 项目类别: