Coordination Funds

协调基金

基本信息

项目摘要

In many respects, the buildings of the high modern era (around 1880 to 1970) escape classical approaches to monument preservation. Not infrequently, their construction is the actual cultural heritage, because the load-bearing structure or the manufacturing process define the heritage value. However, a lack of fundamentals in construction history, monument theory and engineering science has severely hindered the development of adequate strategies and methods for the evaluation and preservation of this cultural heritage. This is where the priority program "Construction as Cultural Heritage" comes into play. Across disciplines, it operates in three thematic areas: 1. Refinement of construction history's coordinate system of the high modern era as an indispensable basis for a sound positioning and assessment of the cultural heritage construction (thematic area "surveying and classifying"). 2. Elaboration of new methods for an integral evaluation of the broad spectrum of different buildings and complex structures (thematic area "identification and evaluation"). 3. Development of networked strategies for the preservation and further development of this heritage (thematic area "Preservation and Development"). The priority program's coordination project promotes interdisciplinary and cross-location cooperation through the use of appropriate tools, ensures constant knowledge transfer and provides impulses for a cross-disciplinary development of the project work. In this way, the competences of the disciplines of historical sciences, monument preservation and civil engineering, which previously acted largely independently of each other, were bundled for the first time in the first phase of this priority program to form a unique interdisciplinary research network. This interconnection of disciplines opens numerous new perspectives on high modern building constructions as well as on better procedures for dealing adequately with this complex heritage. This path will be continued and further expanded in the program's second stage. To this end, the coordination project is complementing already established actions with new impulses such as increased attention to ecological factors or the inclusion of international perspectives. In this final program phase, particular attention will be given to sustainably consolidating the work field "engineering-based and networked heritage conservation", which is currently being established through the SPP. In the interest of immediate theory-practice transfer, specific conclusions will be disseminated to the respective specialist communities and decision-makers by means of recommendations and guidelines. Above all, however, a summarizing final volume of the SPP's publication series will present a concise overview of the historical development of high-modern building constructions and the manifold potentials for their valorization and further development.
在许多方面,高度现代的建筑(大约在1880年至1970年)避开了传统的古迹保护方法。它们的建造往往是真正的文化遗产,因为承重结构或制造工艺决定了遗产的价值。然而,由于缺乏建筑史、古迹理论和工程科学方面的基础知识,严重阻碍了制定适当的战略和方法来评估和保护这一文化遗产。这就是优先项目“文化遗产建设”的用武之地。跨学科,它在三个主题领域运作:1.完善近现代建筑史的坐标系,作为对文化遗产建设进行合理定位和评估的不可或缺的基础(专题领域“调查和分类”)。2.拟订对不同建筑物和复杂结构的广泛范围进行综合评价的新方法(专题领域“鉴定和评价”)。3.为保护和进一步发展这一遗产制定联网战略(专题领域“保护和发展”)。优先计划的协调项目通过使用适当的工具促进跨学科和跨地点的合作,确保持续的知识转移,并为项目工作的跨学科发展提供动力。就这样,历史科学、古迹保护和土木工程等学科的能力,以前在很大程度上相互独立地发挥作用,在这一优先计划的第一阶段首次被捆绑在一起,形成了一个独特的跨学科研究网络。这种学科的相互联系为高度现代化的建筑建设以及充分处理这一复杂遗产的更好程序开辟了许多新的视角。这条道路将在计划的第二阶段继续并进一步扩大。为此,协调项目正在以新的动力补充已经确定的行动,如更多地关注生态因素或纳入国际观点。在这一最后的计划阶段,将特别注意可持续地巩固“以工程为基础的和联网的遗产保护”这一工作领域,该领域目前正在通过战略性计划建立起来。为了立即将理论转化为实践,将以建议和准则的方式将具体结论分发给各自的专家团体和决策者。然而,最重要的是,最重要的是,SPP出版物系列的最后一卷将简要概述高现代建筑建筑的历史发展,以及它们评估和进一步发展的多种潜力。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Professor Dr.-Ing. Werner Lorenz其他文献

Professor Dr.-Ing. Werner Lorenz的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Professor Dr.-Ing. Werner Lorenz', 18)}}的其他基金

Realitätsnahe statisch-konstruktive Bewertung historischer Brückenlager
历史桥梁支座的真实静力建设性评估
  • 批准号:
    112803589
  • 财政年份:
    2009
  • 资助金额:
    --
  • 项目类别:
    Research Grants
Franz Dischinger, ein deutscher Bauingenieur - Untersuchung ausgewählter Aspekte von Wirken und Werk im zeitgeschichtlichen Kontext
德国土木工程师弗朗兹·迪辛格(Franz Dischinger)——对当代历史背景下工作和工作的选定方面进行调查
  • 批准号:
    115589827
  • 财政年份:
    2009
  • 资助金额:
    --
  • 项目类别:
    Research Grants
Leitfaden zur Bewertung der Tragfähigkeit von Steineisendecken - verfeinerte Bemessungsalgorithmen, Planungs- und Arbeitswerkzeuge für die Praxis
石铁天花板承重能力评估指南-细化设计算法、规划和实践工作工具
  • 批准号:
    5398178
  • 财政年份:
    2003
  • 资助金额:
    --
  • 项目类别:
    Research Grants
Steel railway bridges as a legacy of high modernity - Foundations for a holistic decision making between repair and renewal
钢制铁路桥梁作为高度现代化的遗产 - 修复和更新之间整体决策的基础
  • 批准号:
    442249654
  • 财政年份:
  • 资助金额:
    --
  • 项目类别:
    Priority Programmes

相似海外基金

Coordination Funds
协调基金
  • 批准号:
    436278370
  • 财政年份:
    2020
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    422443988
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    423033110
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    424702474
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    427459213
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Priority Programmes
Coordination Funds
协调基金
  • 批准号:
    427358138
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    428795801
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    426581255
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Clinical Research Units
Coordination Funds
协调基金
  • 批准号:
    428918039
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
Coordination Funds
协调基金
  • 批准号:
    416092893
  • 财政年份:
    2019
  • 资助金额:
    --
  • 项目类别:
    Research Units
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了