STUDY ON A SAFETY METHOD OF DAM WHEN A CRACK ARISES IN THE CORE PART THE FRONT CORE TYPE DAM
前心式坝核心部分出现裂缝时大坝安全方法的研究
基本信息
- 批准号:11660236
- 负责人:
- 金额:$ 2.24万
- 依托单位:
- 依托单位国家:日本
- 项目类别:Grant-in-Aid for Scientific Research (C)
- 财政年份:1999
- 资助国家:日本
- 起止时间:1999 至 2001
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
This research was analyzed in the following procedures about the measure when a crack arises to the core of a front core type dam, and acquired knowledge.Two-dimensional FEM examined the depth direction to a crack.Consequently, it turns out that a dam becomes danger, so that the crack was close to the reservoir surface of dam.The measure method of construction to the crack of a core was proposed.Validity of this measure method of construction was clarified in FEM and the experiment of sand model.It turns out that a measure method of construction suppresses a rise of the seepage line by the crack of a core, and a seepage line is drawn safely.It analyzed about the influence by the partial crack by 3-dimensional FEM.As for a rise of the seepage line projected also in the crack part, the crack near the reservoir surface of dam is not seen at about 10 %.If 70 % of the cross direction is exceeded, the effect of core of whole dam is lost and the seepage line of a homogeneous type dam is resembled.
本研究通过对前心墙坝心墙裂缝发生时的测量进行分析,获得了相关知识。二维有限元对裂缝的深度方向进行了检验。结果表明,大坝变得危险,裂缝靠近坝的库面。提出了心墙裂缝的施工测量方法。通过有限元和砂模型试验,阐明了这种施工测量方法的有效性。结果表明,施工测量方法抑制了心墙裂缝引起的浸润线的上升,用三维有限元方法分析了局部裂缝对坝体的影响,对于裂缝部位也投射出的浸润线,坝体库面附近未见10%左右的裂缝,超过70%的横向,整个坝体的心墙效应丧失,与均质坝的渗流线相似。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
KADONO Miyoshi其他文献
KADONO Miyoshi的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('KADONO Miyoshi', 18)}}的其他基金
ANALYSIS OF THREE DIMENSIONAL SEEPAGE FOR FILL TYPE DAM AND VALLEY SYSTEM
填方坝谷系统三维渗流分析
- 批准号:
07660308 - 财政年份:1995
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
相似海外基金
Study of seismic behavior of the fill dam with a concrete core wall
混凝土心墙填方坝抗震性能研究
- 批准号:
20K06296 - 财政年份:2020
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Development of evaluation method for fill-dam safety due to Level 2 earthquake
2级地震填土坝安全评价方法开发
- 批准号:
26292125 - 财政年份:2014
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for Scientific Research (B)
Development of evaluation technique of seismic resistance for earth fill dam using elastic wave velocity monitoring
弹性波速监测土坝抗震评价技术开发
- 批准号:
25871097 - 财政年份:2013
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for Young Scientists (B)
Three Dimensional Analysis of Seepage Through Fill Dam for Irrigation Using the Isoparametric Finite Elements
灌溉填土坝渗流的等参有限元三维分析
- 批准号:
07660327 - 财政年份:1995
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Study on Evaluation of Workable Days for Scheduling Fill Dam Works
填方坝工程调度可行天数评价研究
- 批准号:
01560247 - 财政年份:1989
- 资助金额:
$ 2.24万 - 项目类别:
Grant-in-Aid for General Scientific Research (C)














{{item.name}}会员