Sequence Scheduling with Batching and Smoothing Considerations
Sequence Scheduling with Batching and Smoothing Considerations
批准号:
11680454
负责人:
MORITO Susumu
金额:
$2.11万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
1999
资助国家:
日本
项目状态:
已结题
起止时间:
1999 至 2001
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Two critical, yet contradictory, concepts of modern production planning are grouping and smoothing. Batching of the same type of products to form batches or lots are essential for efficient shop operation when setup losses due to product changes are non-trivial. Smoothing has become viewed as an another key concept especially in the so-called JIT environment. These concepts have been studied individually but not together.This study focused on a production line a part of which calls for batching (such as painting), whereas the other calls for smoothing (such as assenbly). The system considered is a two-stage hybrid flowshop in which the first stage consists of two parallel machines and calls for batching of products having the same attribute, say, color. Production smoothing, on the other hand, is a major concern of the second stage. A production sequence which "compromises" both batching and smoothing considerations are sought.The study, after describing the problem scenario, presented a general idea to achieve smoothing and identified, under the assumpticn of "no-inventory synchronized production", properties of the production sequences to meet a smoothing "constraint". A mathematical program is fourmulated to obtain a final sequence to minimize the number of the first-stage setups due to changes of the product attribute (say, color). The study also discussed a method to make appropriate "color/product-type assignment" so that the number of color changes can be reduced. The problem is also formulated as an integer program. The proposed approach was evaluated computationally with real data.The study also presented 1) a Lagrangian-based heuristic for the standard job shop scheduling problem where operation precedence constraints are relaxed to yield subproblems for each machine, and 2) a colum-gen aration heuristic for a lot scheduling problem of single-stage parallel identical machines.
期刊论文(19)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
今泉淳, 新井智弘, 森戸晋: "ジョブショップスケジューリングに対する機械分解によるラグランジュ緩和"日本経営工学会論文誌. 54(2)(印刷中). (2003)
Jun Imaizumi、Tomohiro Arai、Susumu Morito:“通过机械分解进行车间调度的拉格朗日松弛”,日本管理工程师学会汇刊 54(2)(出版中)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
森戸晋,相沢りえ子,貝原: "Visual SLAMによるシステムシミュレーション(改訂版)"共立出版. 353 (2001)
Susumu Morito、Rieko Aizawa、Kaihara:“使用 Visual SLAM 的系统模拟(修订版)”Kyoritsu Shuppan 353 (2001)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
黒田充, 村松健児編(今泉淳, 森戸晋): "生産スケジューリング(バッチサイズの決定とジョブの順序づけを同時に行うスケジューリング"朝倉書店. 272(16) (2002)
Mitsuru Kuroda、Kenji Muramatsu(主编)(Jun Imaizumi、Susumu Morito):“生产调度(同时确定批量大小和订单作业的调度”)朝仓书店 272(16) (2002)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
Ralf Sejifert and Susumu Morito: "Cooperative Dis-Patching---Exploiting the flexibility of an FMS by means of Incremental Optimization"European Journal of Operational Research. 129(1). 116-133 (2001)
Ralf Sejifert 和 Susumu Morito:“协作调度——通过增量优化来利用 FMS 的灵活性”欧洲运筹学杂志。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
今泉淳,森戸晋: "分岐型ジョブのスケジューリング問題に対するラグランジュ分解・調整法"オペレーションズ・リサーチ. 45・6. 276-281 (2000)
Jun Imaizumi,Susumu Morito:“分支作业调度问题的拉格朗日分解和调整方法”运筹学45・6(2000)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
共 19 条
Logistics and Risk Pooling for Reuse Products
-
批准号:14580492
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$2.24万
-
财政年份:2002
-
负责人:MORITO Susumu
-
依托单位:
Development and Evaluation of Dispatching Schemes Suitable for Automated Manufaciuning
-
批准号:08680469
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$1.54万
-
财政年份:1996
-
负责人:MORITO Susumu
-
依托单位:
A Study of Flexibility on Manufacturing System-An Operations Research Approach
-
批准号:05680344
-
项目类别:Grant-in-Aid for General Scientific Research (C)
-
资助金额:$1.28万
-
财政年份:1993
-
负责人:MORITO Susumu
-
依托单位:
海外基金