PROSPECTIVE EVALUATION OF IMPLANT SUPPORTED BRIDGES
种植体支撑桥的前瞻性评估
基本信息
- 批准号:2130203
- 负责人:
- 金额:$ 10.21万
- 依托单位:
- 依托单位国家:美国
- 项目类别:
- 财政年份:1991
- 资助国家:美国
- 起止时间:1991-06-01 至 1996-05-31
- 项目状态:已结题
- 来源:
- 关键词:biomaterial evaluation data collection dental bonding material dental disorder diagnosis dental plaque dental prosthesis dental radiography endosseous dental implant gingiva human subject human therapy evaluation mandible /maxilla medical records oral pharyngeal surgery osteoporosis statistics /biometry
项目摘要
The aim of this study is to compare and contrast the response of natural
abutment teeth connected rigidly or non-rigidly to osseointegrated dental
implants. Clinically significant criteria including bone loss and mobility
of the teeth and implants will be used to evaluate these two treatment
options, in order to subsequently aid the dentist in selecting methods of
implant attachment to natural dentition.
An experienced team of three Oral and Maxillofacial Surgeons, six
Prosthodontists and one Periodontist will be assigned patients such that
all evaluations of the teeth and implants are blinded, and not evaluated
by the surgeon and prosthodontist who placed and restored the implants.
In addition, the periodontist is now added to the team in order to evaluate
all of the patients. A statistician has been involved with the design of
this study and will participate as a co-investigator.
Fifty patients will be selected based on their need for bilateral
mandibular distal extension bridges articulating against a complete
maxillary denture. One 10 mm. long Integral implant will be placed in the
right and left mandibular first molar regions. Twelve weeks later, the
implants will be restored with three unit bridges, with natural abutment
teeth rigidly or non-rigidly attached to the implant evaluation.
Prior to and following bridge insertion, radiographs, soft tissue pockets,
bleeding and plaque indexes, tooth and implant mobility, and general
clinical quality will be assessed every six months from the time of implant
placement for five years. All patients will be entered into the study by
the end of year three. A renewal application will be submitted to enable
long term follow-up.
Several NIDR consensus conference speakers requested NIH support for
prospective studies on different treatment modalities for partially
edentulous patients. We seek clinically significant information.
本研究的目的是比较和对比自然环境的反应
刚性或非刚性连接至骨整合牙的基牙
植入物。 具有临床意义的标准,包括骨质流失和活动能力
牙齿和种植体的数据将用于评估这两种治疗方法
选项,以便随后帮助牙医选择治疗方法
种植体附着在天然牙列上。
经验丰富的团队由三名口腔颌面外科医生、六名
将为患者分配修复科医生和一名牙周病医生,以便
所有牙齿和种植体的评估都是盲法,不进行评估
由放置和修复种植体的外科医生和口腔修复医生完成。
此外,牙周病医生现在也被添加到团队中,以便评估
所有的病人。 一位统计学家参与了设计
这项研究并将作为联合研究者参与。
将根据双侧的需要选择 50 名患者
下颌远端延伸桥与完整的关节相连
上颌义齿。 一个 10 毫米。长的整体种植体将被放置在
右下颌第一磨牙区和左下颌第一磨牙区。 十二周后,
种植体将通过三个单位桥修复,带有自然基台
牙齿刚性或非刚性地附着在种植体上的评估。
在桥插入之前和之后,X光片,软组织袋,
出血和牙菌斑指数、牙齿和种植体活动度以及一般情况
自植入之日起每六个月评估一次临床质量
安置五年。 所有患者将通过以下方式进入研究
第三年年底。 将提交续订申请以启用
长期随访。
NIDR 共识会议的几位发言人请求 NIH 支持
不同治疗方式的前瞻性研究
无牙颌患者。 我们寻求具有临床意义的信息。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
MICHAEL Steven BLOCK其他文献
MICHAEL Steven BLOCK的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('MICHAEL Steven BLOCK', 18)}}的其他基金
Prospective evaluation of immediate temporized implants
即刻临时种植体的前瞻性评估
- 批准号:
6678521 - 财政年份:2003
- 资助金额:
$ 10.21万 - 项目类别:
Prospective evaluation of immediate temporized implants
即刻临时种植体的前瞻性评估
- 批准号:
7237361 - 财政年份:2003
- 资助金额:
$ 10.21万 - 项目类别:
Prospective evaluation of immediate temporized implants
即刻临时种植体的前瞻性评估
- 批准号:
6788149 - 财政年份:2003
- 资助金额:
$ 10.21万 - 项目类别:
Prospective evaluation of immediate temporized implants
即刻临时种植体的前瞻性评估
- 批准号:
7059329 - 财政年份:2003
- 资助金额:
$ 10.21万 - 项目类别:
Prospective evaluation of immediate temporized implants
即刻临时种植体的前瞻性评估
- 批准号:
6876183 - 财政年份:2003
- 资助金额:
$ 10.21万 - 项目类别:
SHORT-TERM TRAINING IN HEALTH PROFESSIONAL SCHOOLS
卫生专业学校的短期培训
- 批准号:
2129720 - 财政年份:1992
- 资助金额:
$ 10.21万 - 项目类别:
PROSPECTIVE EVALUATION OF IMPLANT SUPPORTED BRIDGES
种植体支撑桥的前瞻性评估
- 批准号:
6176793 - 财政年份:1991
- 资助金额:
$ 10.21万 - 项目类别:
PROSPECTIVE EVALUATION OF IMPLANT SUPPORTED BRIDGES
种植体支撑桥的前瞻性评估
- 批准号:
2430120 - 财政年份:1991
- 资助金额:
$ 10.21万 - 项目类别:
PROSPECTIVE EVALUATION OF IMPLANT SUPPORTED BRIDGES
种植体支撑桥的前瞻性评估
- 批准号:
2897006 - 财政年份:1991
- 资助金额:
$ 10.21万 - 项目类别:
PROSPECTIVE EVALUATION OF IMPLANT SUPPORTED BRIDGES
种植体支撑桥的前瞻性评估
- 批准号:
2713269 - 财政年份:1991
- 资助金额:
$ 10.21万 - 项目类别:
相似海外基金
EcoTraceAI: A Novel AI-based Platform for data collection and validation for measuring the environmental impacts of the supply chain in the fashion industry.
EcoTraceAI:一个基于人工智能的新型平台,用于数据收集和验证,用于衡量时尚行业供应链的环境影响。
- 批准号:
10114149 - 财政年份:2024
- 资助金额:
$ 10.21万 - 项目类别:
SME Support
End-to-End Solar Borehole Business Models and Data Collection to Extend Sustainable Access to Energy and Water in Rural Tanzania
端到端太阳能钻孔商业模式和数据收集,以扩大坦桑尼亚农村地区可持续获取能源和水的机会
- 批准号:
10074210 - 财政年份:2024
- 资助金额:
$ 10.21万 - 项目类别:
Collaborative R&D
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427233 - 财政年份:2024
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427232 - 财政年份:2024
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427231 - 财政年份:2024
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
D-ISN/RAPID: Data Collection for Human Trafficking Recruitment and Responses in Forced Migration
D-ISN/RAPID:强迫移民中人口贩运招募和应对的数据收集
- 批准号:
2330311 - 财政年份:2023
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
HCC: Small: Toward Computational Modeling of Autism Spectrum Disorder: Multimodal Data Collection, Fusion, and Phenotyping
HCC:小型:自闭症谱系障碍的计算模型:多模式数据收集、融合和表型分析
- 批准号:
2401748 - 财政年份:2023
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
Collaborative Research: Multi-Agent Adaptive Data Collection for Automated Post-Disaster Rapid Damage Assessment
协作研究:用于灾后自动化快速损害评估的多智能体自适应数据收集
- 批准号:
2316654 - 财政年份:2023
- 资助金额:
$ 10.21万 - 项目类别:
Standard Grant
It's All about the Data: Advancing Knowledge in Data Collection, Management and Accessibility among HIV Researchers in Canada
一切都与数据有关:提高加拿大艾滋病毒研究人员在数据收集、管理和可访问性方面的知识
- 批准号:
480712 - 财政年份:2023
- 资助金额:
$ 10.21万 - 项目类别:
Miscellaneous Programs
Survey Data Collection Methods Collaboration: Securing the Future of Social Surveys
调查数据收集方法协作:确保社会调查的未来
- 批准号:
ES/X014150/1 - 财政年份:2023
- 资助金额:
$ 10.21万 - 项目类别:
Research Grant














{{item.name}}会员




