R&D in preparation for an upgrade of CMS for the Super-LHC
R&D in preparation for an upgrade of CMS for the Super-LHC
批准号:
ST/G009473/1
负责人:
Geoffrey Hall
金额:
$155.48万
依托单位:
依托单位国家:
英国
项目类别:
Research Grant
财政年份:
2009
资助国家:
英国
项目状态:
已结题
起止时间:
2009 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
The LHC machine will be upgraded to increase the luminosity by an order of magnitude to 10^35 cm-2.s-1. The date for the upgrade is not yet defined but is expected to be about 10 years after LHC starts operating. The machine parameters are not yet frozen but the clock speed is expected to be 20MHz instead of the current 40MHz. The motivation is to extend the physics reach of the LHC and to study with greater precision the discoveries expected to be made at LHC since, after several years at maximum luminosity, the statistical gains gradually decline with time, or integrated luminosity. The major part of the CMS upgrade will be to construct a new tracking detector to operate with similar performance in conditions of greatly increased secondary particle fluences, by a factor of about 20 in each bunch crossing. There are major technical challenges to copy with increased radiation damage and deliver power to the detector. If the overall performance of the present tracker is to be equalled or exceeded, lower power operation and a reduced material budget are important objectives to achieve. There is an additional new challenge to maintain the first level trigger rate at below 100kHz. The main innovation to make this possible will be to include data from the tracker in the first level hardware trigger decision, which is very novel and extremely challenging. Simulation studies form an important element of designing a new tracker and achieving the triggering objective. UK CMS plans to build on its existing expertise to contribute to the simulations, readout and triggering activities. It expects to maintain a prominent position in a future CMS where we hold well established important scientific management roles, in detector construction, computing, and physics analysis.
期刊论文(1)
专著(0)
科研奖励(0)
会议论文
Studies of the CBC3.1 readout ASIC for CMS 2S-modules
用于 CMS 2S 模块的 CBC3.1 读出 ASIC 的研究
DOI:
10.1016/j.nima.2022.167939
发表时间:
2023
期刊:
Accelerators, Spectrometers, Detectors and Associated Equipment
影响因子:
--
作者:
[Uchida K]
通讯作者:
Uchida K
Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC - additional support
-
批准号:ST/N005368/1
-
项目类别:Research Grant
-
资助金额:$17.95万
-
财政年份:2016
-
负责人:Geoffrey Hall
-
依托单位:
The study of elementary particle physics and their interactions - additonal capital equipment CMS
-
批准号:ST/L002965/1
-
项目类别:Research Grant
-
资助金额:$13.89万
-
财政年份:2014
-
负责人:Geoffrey Hall
-
依托单位:
Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC
-
批准号:ST/K003240/1
-
项目类别:Research Grant
-
资助金额:$564.0万
-
财政年份:2013
-
负责人:Geoffrey Hall
-
依托单位:
CMS Upgrades PROJECT COORDINATION
-
批准号:CMS Upgrades
-
项目类别:Intramural
-
资助金额:$0.0万
-
财政年份:2010
-
负责人:Geoffrey Hall
-
依托单位:
Perceptual Learning: Effects and Mechanisms
-
批准号:BB/F006322/1
-
项目类别:Research Grant
-
资助金额:$28.77万
-
财政年份:2008
-
负责人:Geoffrey Hall
-
依托单位:
Reward value effects on reward timing
-
批准号:BB/E008224/1
-
项目类别:Research Grant
-
资助金额:$31.68万
-
财政年份:2007
-
负责人:Geoffrey Hall
-
依托单位:
Stimulus preexposure effects and associative learning
-
批准号:BB/D009855/1
-
项目类别:Research Grant
-
资助金额:$26.62万
-
财政年份:2006
-
负责人:Geoffrey Hall
-
依托单位:
海外基金