An integrated mathematical approach to synchronise and optimise hospital operations
An integrated mathematical approach to synchronise and optimise hospital operations
批准号:
LP140100394
负责人:
Adj/Prof Erhan Kozan
金额:
$22.56万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2014
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2014-09-10 至 2018-12-31
中文摘要
点击翻译按钮获取中文摘要
英文摘要
This project aims to develop an integrated mathematical approach to synchronise and optimise patient scheduling systems of different departments to ensure that the hospital’s assets and related resources are used efficiently. The project’s aim is to investigate patient flow, process delay, and the interaction and inter-dependence of departments within the hospital to reduce access block (bottleneck) and subsequent overcrowding. This project aims to smooth the running of the hospital, improve the efficiency of patient throughput, reduce waiting times, and revolutionise hospital planning and scheduling.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Designing Robust Reactive Scheduling System for Emergency Medical Services
-
批准号:LP0669156
-
项目类别:Linkage Projects
-
资助金额:$20.29万
-
财政年份:2006
-
负责人:Adj/Prof Erhan Kozan
-
依托单位:
Hybrid Job Shop Techniques for Dynamic Train Scheduling
-
批准号:LP0668273
-
项目类别:Linkage Projects
-
资助金额:$7.55万
-
财政年份:2006
-
负责人:Adj/Prof Erhan Kozan
-
依托单位:
Optimisation of Rail Network Infrastructure Capacity under Dynamic Train Planning
-
批准号:LP0219595
-
项目类别:Linkage Projects
-
资助金额:$18.32万
-
财政年份:2002
-
负责人:Adj/Prof Erhan Kozan
-
依托单位:
海外基金