课题基金 / 基金详情

BIOREPOSITORY & TISSUE ANALYSIS

BIOREPOSITORY & TISSUE ANALYSIS
生物样本库
批准号:
9248298
负责人:
GUSTAVO WALTER LEONE
金额:
$9.31万
依托单位国家:
美国
项目类别:
财政年份:
2017
资助国家:
美国
项目状态:
已结题
起止时间:
2017-04-01 至 2019-03-31

项目摘要

项目成果

GUSTAVO WALTER LEONE的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The original Hollings Cancer Center (HCC) Building, home to outpatient cancer services and research, was completed in 1993. Just over a decade later due to the pressing need to expand the footprint for clinical and research activities, MUSC secured $98M to add a seven-story tower and significantly renovate the original HCC Building. These projects were completed in 2007. During the initial Cancer Center Support Grant (CCSG) project period (2009-present), the HCC leadership has continued to ensure that the available facilities match the HCC's strategic plans to grow its laboratory, clinical, and cancer control-based research programs. The leadership has worked closely with the MUSC administration and architectural and engineering teams to design additional state-of-the-art facilities and space. This has led to the construction of the Drug Discovery Building (DDB) and Bioengineering Building (BEB) in late 2011, a $120M investment. The HCC has assignment of approximately three and a half floors within these two new buildings. As shown in Table 1, the total HCC-controlled space has increased to 270,174 gross ft[2], a 33% increase since the initial CCSG submission.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Leaders of Scientific Research Programs
CELL EVALUATION & THERAPY
Administration
LIPIDOMICS SHARED RESOURCE GROUP
海外基金