Integrated Production and Manpower Scheduling - Second Phase

Integrated Production and Manpower Scheduling - Second Phase
生产与人力综合调度-第二阶段
批准号:
508407-2017
负责人:
Defersha, Fantahun
金额:
$0.91万
依托单位:
依托单位国家:
加拿大
项目类别:
Engage Plus Grants Program
财政年份:
2017
资助国家:
加拿大
项目状态:
已结题
起止时间:
2017-01-01 至 2018-12-31

项目摘要

项目成果

Defersha, Fantahun的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Most published articles in scheduling research are focused in developing models and algorithms to theoreticalproblems having limited applications. The scheduling problem identified in the collaborating company happensto be very different from those know in literature. It involves the scheduling of a large variety of orders withgreater operational complexity. Many of the operations on the products are to be processed unit by unit.However, most products also need to passes through a batch processing facility with apparent complexity toincorporate in a scheduling model. Moreover, products need both machining and assembly operations wherecomponents and sub-assemblies need to pass through many processing stations. Some of the products haveoperations that are outsourced and their semi-finished inventory needs to be sent to other facilities and bereturned for further in-house processing. Machine operators are limited resources. Many of these operators arecross trained and can be assigned to different types of machines. Operators may also tend more than onemachine at a time. Hence their task need to be scheduled in details along the operations. Critical segments ofthe manufacturing facility are operated multiple shift or overtime while the rest are operated only a single shift.These unique combination of problem features makes scheduling very difficult. Hence, the company faces achallenge in running its operations smoothly with minimal work-in-process inventory while at the same timemeeting product delivery dates. A preliminary study was conducted to develop an efficient schedulingtechnique based on Event Scheduling/Time Advance (ESTA) algorithm. The approach proves to be capable ofhandling many of the operational logic of the manufacturing facility and generate schedules for the machinesand the operators, and optimize several performance criteria. This research is a continuation of thisachievement and is aimed at enhancing the developed algorithm to incorporate several details of themanufacturing system. Moreover, a limited study will be conducted for integrating production scheduling withother operational issues such as inventory management and maintenance planning.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
A Comprehensive Framework and Solution Procedure for Dynamic Scheduling in Manufacturing Systems
  • 批准号:
    RGPIN-2017-03871
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.53万
  • 财政年份:
    2022
  • 负责人:
    Defersha, Fantahun
  • 依托单位:
A Comprehensive Framework and Solution Procedure for Dynamic Scheduling in Manufacturing Systems
  • 批准号:
    RGPIN-2017-03871
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.53万
  • 财政年份:
    2021
  • 负责人:
    Defersha, Fantahun
  • 依托单位:
A Comprehensive Framework and Solution Procedure for Dynamic Scheduling in Manufacturing Systems
  • 批准号:
    RGPIN-2017-03871
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.53万
  • 财政年份:
    2020
  • 负责人:
    Defersha, Fantahun
  • 依托单位:
A Comprehensive Framework and Solution Procedure for Dynamic Scheduling in Manufacturing Systems
  • 批准号:
    RGPIN-2017-03871
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.53万
  • 财政年份:
    2019
  • 负责人:
    Defersha, Fantahun
  • 依托单位:
海外基金