Water resource management of the Snowy Mountains Hydro-electric Scheme catchment and the Murray-Darling River system - a new perspective on system reliability from drought history reconstruction.
Water resource management of the Snowy Mountains Hydro-electric Scheme catchment and the Murray-Darling River system - a new perspective on system reliability from drought history reconstruction.
批准号:
LP0669104
负责人:
Prof Hamish McGowan
金额:
$18.11万
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2006
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2006-07-01 至 2010-11-01
中文摘要
雪山水电计划通过为大分水岭以西地区提供可靠的水源,每年为墨累-达令盆地提供价值30亿美元的农产品,而该计划的水力发电每年价值数亿美元,为东部大陆电网提供70%的可再生能源,从而每年避免500万吨的二氧化碳排放。这项研究将确保对该计划的水资源进行可持续和有效的管理,以应对预测的气候变化,最重要的是,应对严重的干旱。
英文摘要
The Snowy Mountains Hydro-electric Scheme assists in underwriting the production of $3 billion of agricultural products in the Murray-Darling Basin each year by providing a reliable source of water west of the Great Dividing Range, while Hydro-electric generation from the Scheme is worth annually several hundred million dollars and provides 70% of the renewable energy supplied to the eastern mainland grid, thereby avoiding 5Mt of carbon dioxide emissions each year. This study will ensure the ongoing sustainable and efficient management of the Schemes water resources in response to predicted climate variability and most importantly, severe drought.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Unlocking the environmental archives of the Kimberley’s past
-
批准号:LP170100242
-
项目类别:Linkage Projects
-
资助金额:$32.53万
-
财政年份:2019
-
负责人:Prof Hamish McGowan
-
依托单位:
国内基金
海外基金
协同中继系统跨层资源分配与优化调度的理论及方法
-
批准号:60972070
-
项目类别:面上项目
-
资助金额:33.0万元
-
批准年份:2009
-
负责人:陈前斌
-
依托单位:
横断山区淡水三肠目涡虫资源及分类学研究
-
批准号:30670247
-
项目类别:面上项目
-
资助金额:27.0万元
-
批准年份:2006
-
负责人:陈广文
-
依托单位: