Application of Mathematical Programming Concepts to Structural System Reliability

数学规划概念在结构系统可靠性中的应用

基本信息

  • 批准号:
    8613208
  • 负责人:
  • 金额:
    $ 16.5万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Continuing Grant
  • 财政年份:
    1987
  • 资助国家:
    美国
  • 起止时间:
    1987-02-15 至 1989-07-31
  • 项目状态:
    已结题

项目摘要

The research is to explore, adapt, and demonstrate the use of mathematical programming techniques for structural system reliability assessment - involving kinematic model search techniques, generalized multiparameter loading, extensions of basic approach, and characterization of polyhedral hypersurfaces. This project utilizes the analogy between structural analysis and mathematical programming in computing structural system reliability. Primary consideration is given to ductile frames with plastic collapse mechanisms, allowing extensive use of linear programming techniques. The kinematic approach to structural limit analysis has been shown previously to be expressible in a linear programming format, a feature that has been ueed for identifying the critical mode of failure. This research extends these concepts through the application of powerful mathematical programming techniques to the system reliabilities, and the combined system safety. The primal/dual linear programming analogy is applied to analyze structural systems by the static, or kinematic duality approach. Multiobjective programming is also investigated for generalized multiparameter loading. This research opens a new direction in the reliability analysis of seletively large structural systems. It can provide a practical tool for the probabilistic analysis of complex structures and the development of probability-based design criteria. Results of the work will be of importance in all branches of structural design includig buildings, bridges, offshore platforms, reactors and ships.
该研究旨在探索、调整和展示 结构系统数学规划技术 可靠性评估-涉及运动学模型搜索技术, 广义多参数加载,基本方法的扩展, 多面体超曲面的特征。 该项目利用结构分析和 计算结构系统可靠度的数学规划。 主要考虑塑性破坏的延性框架 机制,允许广泛使用线性规划技术。 结构极限分析的运动学方法已被证明 以前是在线性编程格式表示,一个功能 用于识别临界失效模式。 这 研究通过应用强大的 数学规划技术对系统可靠性的影响, 综合系统安全。 原始/对偶线性规划的类比是 应用于分析结构系统的静态,或运动 对偶方法 多目标规划也研究了 广义多参数加载 该研究为结构可靠性分析开辟了一个新的方向 选择性大的结构系统。 它可以提供一个实用的工具 复杂结构的概率分析, 基于概率的设计标准。 工作的结果将是重要的所有分支机构的结构 设计包括建筑物、桥梁、海上平台、反应堆和 船舶

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Ross Corotis其他文献

Ross Corotis的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Ross Corotis', 18)}}的其他基金

EAGER: Uncertainty Quantification of Structural Systems: Generalized Information Theory
EAGER:结构系统的不确定性量化:广义信息论
  • 批准号:
    1552855
  • 财政年份:
    2015
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Structural Reliability and Sustainable Resilience
结构可靠性和可持续弹性
  • 批准号:
    1063790
  • 财政年份:
    2011
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Prediction of Design Wind Speeds by Extreme Value EstimationProcedures
通过极值估计程序预测设计风速
  • 批准号:
    9596055
  • 财政年份:
    1995
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Continuing Grant
Prediction of Design Wind Speeds by Extreme Value EstimationProcedures
通过极值估计程序预测设计风速
  • 批准号:
    9411642
  • 财政年份:
    1994
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Continuing Grant
Structural System Reliability and Optimization--Incorporat- ing Nonlinear Mechanics in Mathematical Programming Approaches
结构系统可靠性和优化——将非线性力学纳入数学规划方法
  • 批准号:
    9016018
  • 财政年份:
    1991
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Continuing Grant
Estimation of Extreme Probability Distribution Tails: Application to Extreme Wind Speeds
极端概率分布尾部的估计:在极端风速中的应用
  • 批准号:
    9013116
  • 财政年份:
    1991
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Continuing Grant
Performance-Optimized Reliability Analysis of Structural Systems
结构系统性能优化的可靠性分析
  • 批准号:
    8814695
  • 财政年份:
    1988
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Reliability-Based Limit State Design of Structural Systems With Stochastic Loads
随机载荷结构系统基于可靠性的极限状态设计
  • 批准号:
    8305651
  • 财政年份:
    1984
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Continuing Grant
Travel to Attend: Fourth International Conference on Applications of Statistics & Probability in Soil & Structural Engineering; Florence, Italy; June 13-17,
前往参加:第四届统计应用国际会议
  • 批准号:
    8309721
  • 财政年份:
    1983
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Statistical Duration - Intensity Model of Structural Floor Loads
统计持续时间 - 结构楼面荷载强度模型
  • 批准号:
    8205384
  • 财政年份:
    1982
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant

相似海外基金

Study on Renewable Energy Integration with Mathematical Programming Model considering Electricity and Non-Electricity Sectors
考虑电力与非电力部门的可再生能源并网数学规划模型研究
  • 批准号:
    20H02679
  • 财政年份:
    2020
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
Study on combination of mathematical programming and evolutionary multi-point methods
数学规划与进化多点方法结合的研究
  • 批准号:
    20K11970
  • 财政年份:
    2020
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Collaborative Research: Collaborative Partnership to Teach Mathematical Reasoning Through Computer Programming (CPR2)
合作研究:通过计算机编程教授数学推理的合作伙伴关系(CPR2)
  • 批准号:
    1933677
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Improved Mathematical Programming Techniques for Approximation Algorithms
改进近似算法的数学编程技术
  • 批准号:
    RGPIN-2015-06496
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Discovery Grants Program - Individual
Collaborative Research: : Collaborative Partnership to Teach Mathematical Reasoning Through Computer Programming (CPR2)
合作研究::通过计算机编程教授数学推理的合作伙伴关系(CPR2)
  • 批准号:
    1933678
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Research on resource allocation method for service chaining based on approach of applied mathematical programming
基于应用数学规划方法的服务链资源分配方法研究
  • 批准号:
    19K14980
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Grant-in-Aid for Early-Career Scientists
AI Planning and Mathematical Programming
人工智能规划与数学规划
  • 批准号:
    RGPIN-2015-05072
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Discovery Grants Program - Individual
AF: Small: Faster and Better Algorithms for, and via, Mathematical Programming Relaxations
AF:小:更快更好的算法,并通过数学编程松弛
  • 批准号:
    1910149
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Standard Grant
Behavioural-based mathematical programming: algorithmics and applications
基于行为的数学规划:算法和应用
  • 批准号:
    RGPIN-2017-05073
  • 财政年份:
    2019
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Discovery Grants Program - Individual
AI Planning and Mathematical Programming
人工智能规划与数学规划
  • 批准号:
    RGPIN-2015-05072
  • 财政年份:
    2018
  • 资助金额:
    $ 16.5万
  • 项目类别:
    Discovery Grants Program - Individual
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了