EAGER: Uncertainty Quantification of Structural Systems: Generalized Information Theory
EAGER: Uncertainty Quantification of Structural Systems: Generalized Information Theory
批准号:
1552855
负责人:
Ross Corotis
金额:
$15.52万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
2015
资助国家:
美国
项目状态:
已结题
起止时间:
2015-09-01 至 2018-08-31
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Uncertainty is inherent in the assessment and prediction of the performance of structures and community infrastructure when evaluating risk, hazard mitigation and vulnerability/resiliency. Structural engineering needs to reflect multi-disciplinary societal issues, including social, political and economic, which introduce partial knowledge and disparate characteristics of uncertainty. While traditional probabilistic methods to treat the uncertainty can address partial and dissimilar information, they are not the most appropriate for comprehensive incorporation of broader contexts reflecting sources such as expert judgement and imprecision. This EArly-concept Grant for Exploratory Research (EAGER) project undertakes exploratory research on the broader aspects of uncertainty approaches to structural engineering safety, incorporating multi-attribute aspects of judgement and unpredictability in human decision-making. The research introduces varied sources of uncertainty into structural design, melding this with community issues that assess the value of the structure to economic, environmental and social/political sustainability. Quantitative and linguistic uncertainties are incorporated under a comprehensive design philosophy capable of handling vagueness, and ambiguity. These broadened approaches to structural engineering and community performance will lead to great benefits to society through enhancements of the built environment. The primary objective of this project is the development of methods under the umbrella of Generalized Information Theory that expand traditional probabilistic approaches to structural and community safety, enhancing the treatment of uncertainty by incorporating notions of ignorance, interactivity, and linguistic information. The scope of the project includes generalization of probability theory with uncertainty measures based on monotone theory and incorporating linguistic vagueness, ambiguity, evidence concepts (belief and plausibility), conflicting expert judgement, imprecision, partial knowledge, confidence, and subjective possibility. An initial application in this exploratory project will be for earthquake damage estimation and vulnerability assessment. With actual community data, fuzzy pattern recognition will be used to investigate the existence of building damage patterns and potential seismic vulnerability prediction.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Structural Reliability and Sustainable Resilience
-
批准号:1063790
-
项目类别:Standard Grant
-
资助金额:$30.0万
-
财政年份:2011
-
负责人:Ross Corotis
-
依托单位:
Prediction of Design Wind Speeds by Extreme Value EstimationProcedures
-
批准号:9596055
-
项目类别:Continuing Grant
-
资助金额:$17.61万
-
财政年份:1995
-
负责人:Ross Corotis
-
依托单位:
Prediction of Design Wind Speeds by Extreme Value EstimationProcedures
-
批准号:9411642
-
项目类别:Continuing Grant
-
资助金额:$0.0万
-
财政年份:1994
-
负责人:Ross Corotis
-
依托单位:
Structural System Reliability and Optimization--Incorporat- ing Nonlinear Mechanics in Mathematical Programming Approaches
-
批准号:9016018
-
项目类别:Continuing Grant
-
资助金额:$10.96万
-
财政年份:1991
-
负责人:Ross Corotis
-
依托单位:
Estimation of Extreme Probability Distribution Tails: Application to Extreme Wind Speeds
-
批准号:9013116
-
项目类别:Continuing Grant
-
资助金额:$10.91万
-
财政年份:1991
-
负责人:Ross Corotis
-
依托单位:
Performance-Optimized Reliability Analysis of Structural Systems
-
批准号:8814695
-
项目类别:Standard Grant
-
资助金额:$16.51万
-
财政年份:1988
-
负责人:Ross Corotis
-
依托单位:
Application of Mathematical Programming Concepts to Structural System Reliability
-
批准号:8613208
-
项目类别:Continuing Grant
-
资助金额:$16.5万
-
财政年份:1987
-
负责人:Ross Corotis
-
依托单位:
Reliability-Based Limit State Design of Structural Systems With Stochastic Loads
-
批准号:8305651
-
项目类别:Continuing Grant
-
资助金额:$19.4万
-
财政年份:1984
-
负责人:Ross Corotis
-
依托单位:
Travel to Attend: Fourth International Conference on Applications of Statistics & Probability in Soil & Structural Engineering; Florence, Italy; June 13-17,
-
批准号:8309721
-
项目类别:Standard Grant
-
资助金额:$0.1万
-
财政年份:1983
-
负责人:Ross Corotis
-
依托单位:
Statistical Duration - Intensity Model of Structural Floor Loads
-
批准号:8205384
-
项目类别:Standard Grant
-
资助金额:$13.13万
-
财政年份:1982
-
负责人:Ross Corotis
-
依托单位:
Statistical Duration - Intensity Model of Structural Floor Loads
-
批准号:8115357
-
项目类别:Continuing Grant
-
资助金额:$6.19万
-
财政年份:1981
-
负责人:Ross Corotis
-
依托单位:
Lifetime Reliability Analysis in Structural Systems With Nonlinearities
-
批准号:7812379
-
项目类别:Standard Grant
-
资助金额:$8.82万
-
财政年份:1979
-
负责人:Ross Corotis
-
依托单位:
Stochastic Analysis 0f Live Floor Loadings in Buildings
-
批准号:7406943
-
项目类别:Standard Grant
-
资助金额:$5.52万
-
财政年份:1974
-
负责人:Ross Corotis
-
依托单位:
海外基金