课题基金 / 基金详情

Assessment of Lifeline Response and Recovery Performance Using Data from the 1987 Whittier Narrows Earthquake

Assessment of Lifeline Response and Recovery Performance Using Data from the 1987 Whittier Narrows Earthquake
使用 1987 年惠提尔海峡地震数据评估生命线响应和恢复性能
批准号:
8804292
负责人:
Ronald Eguchi
金额:
$2.97万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1988
资助国家:
美国
项目状态:
已结题
起止时间:
1988-02-15 至 1990-03-31

项目摘要

项目成果

Ronald Eguchi的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The Whittier Narrows earthquake offers an opportunity to assess the impact that research conducted as a result of the 1971 San Fernando earthquake has had on the earthquake design and performance of lifelines. The San Fernando earthquake was a major turning point in the seismic design of these systems, and Los Angeles has had the opportunity to benefit from research conducted in this area. Therefore, collecting response and recovery data from the Whittier Narrows earthquake would not only allow the preservation of important but perishable data, but also an assessment of research application and effectiveness. The objectives of this proposed study are to (1) collect, review, and document lifeline system performance (i.e., response and recovery) data from the October 1, 1987 Whittier Narrows earthquake; (2) develop preliminary response and recovery models for different lifeline systems using data from the Whittier Narrows earthquake and the 1971 San Fernando earthquake; and (3) assess the impact that research in the lifelines area conducted after the 1971 San Fernando earthquake has had on the improvement of seismic design and emergency response and preparedness procedures for lifelines. Specific tasks that will be performed include (1) data collection and review; (2) interviews with lifeline personnel; (3) development of preliminary response and recovery models; (4) comparison of lifeline response and recovery performance during 1971 San Fernando earthquake and 1987 Whittier Narrows earthquake; and (5) assessment of impact of research conducted after 1971 San Fernando earthquake on seismic design and performance of lifelines.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
EAGER: Exploring Resilience in SmartCity Water Infrastructure
  • 批准号:
    1535680
  • 项目类别:
    Standard Grant
  • 资助金额:
    $5.0万
  • 财政年份:
    2015
  • 负责人:
    Ronald Eguchi
  • 依托单位:
RAPID: The Role of Urban Development Patterns in Mitigating the Effects of Tsunami Run-up
  • 批准号:
    1138640
  • 项目类别:
    Standard Grant
  • 资助金额:
    $4.0万
  • 财政年份:
    2011
  • 负责人:
    Ronald Eguchi
  • 依托单位:
RAPID: Assessing Community-Scale Disruption and Restoration of Basic Needs in Post-Earthquake Haiti
  • 批准号:
    1034876
  • 项目类别:
    Standard Grant
  • 资助金额:
    $4.07万
  • 财政年份:
    2010
  • 负责人:
    Ronald Eguchi
  • 依托单位:
New Methods for Measuring, Monitoring and Evaluating Post-Disaster Recovery
  • 批准号:
    0926142
  • 项目类别:
    Standard Grant
  • 资助金额:
    $28.81万
  • 财政年份:
    2008
  • 负责人:
    Ronald Eguchi
  • 依托单位:
海外基金