课题基金 / 基金详情

Use of population data bases with double sampling for choice-based sample surveys and time-to-event data

Use of population data bases with double sampling for choice-based sample surveys and time-to-event data
使用人口数据库和双重抽样进行基于选择的抽样调查和事件时间数据
批准号:
162449825
负责人:
Professorin Dr. Iris Pigeot
金额:
$0.0万
依托单位国家:
德国
项目类别:
Priority Programmes
财政年份:
2010
资助国家:
德国
项目状态:
已结题
起止时间:
2009-12-31 至 2011-12-31

项目摘要

项目成果

Professorin Dr. Iris Pigeot的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
In many research applications based on administrative data bases, certain covariates and proxy measurements are available for all persons in a sampling frame. After sample selection, usually only the precise covariate information collected in the sample is used for data analysis. Ignoring the information in the sampling frame results in an efficiency loss in parameter estimation and has been acknowledged in epidemiology, where two-phase or double sampling methods have been developed to make better use of the combined data. As a consequence, the cost of covariate measurements in surveys can be reduced by double sampling. This project will apply the ideas of double sampling developed in epidemiology for the design and analysis of sample surveys where the sampling frame is based on a population data base. Likelihood oriented approaches and methods based on weighting schemes have been developed to combine the data sources and enhance efficiency. The actual performance of the diverse two-phase methods will be compared in choice-based samples and time-to-event analyses of authentic sociological and epidemiological data. New methods for stratification that build on available phase-one information will be investigated. The goal of the project is the development of empirically based recommendations how phase-one information from large administrative data bases can be efficiently used in the design of two-phase studies for choice-based samples and time-to-event data.
期刊论文(1)
专著(0)
科研奖励(0)
会议论文
Does additional confounder information alter the estimated risk of bleeding associated with phenprocoumon use—results of a two‐phase study
额外的混杂信息是否会改变与苯丙香豆素使用相关的估计出血风险——两阶段研究的结果
DOI: 10.1002/pds.3193
发表时间: 2012
期刊: Pharmacoepidemiology and Drug Safety
影响因子: 2.6
作者: [Schill, Pigeot]
通讯作者: Pigeot
Development and evaluation of three-stage procedures for modelling exposure patterns in epidemiological studies
Evaluation of an indirect record linkage method in an exemplary study on the risk of cancer and cancer mortality in type 2 diabetes patients treated with different antidiabetics
Zwei-Phasen Methodik zur gemeinsamen Auswertung von Sekundärdatenquellen
Entwicklung und Untersuchung der statistischen Eigenschaften eines Walkability-Index zur Erfassung der Bewegungsmöglichkeiten in der Lebensumwelt von Kindern
国内基金
海外基金
眼表菌群影响糖尿病患者干眼发生的人群流行病学研究
  • 批准号:
    82371110
  • 项目类别:
    面上项目
  • 资助金额:
    49.00万元
  • 批准年份:
    2023
  • 负责人:
    邹海东
  • 依托单位:
发展/减排路径(SSPs/RCPs)下中国未来人口迁移与集聚时空演变及其影响
  • 批准号:
    19ZR1415200
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2019
  • 负责人:
    夏海斌
  • 依托单位:
人大肠癌SP细胞干性表型和基因型分析
  • 批准号:
    81101870
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    20.0万元
  • 批准年份:
    2011
  • 负责人:
    胡均
  • 依托单位:
不同栽培环境条件下不同基因型牡丹根部细菌种群多样性特征
  • 批准号:
    31070617
  • 项目类别:
    面上项目
  • 资助金额:
    30.0万元
  • 批准年份:
    2010
  • 负责人:
    韩继刚
  • 依托单位: