SCI: TeraGrid Resource Partners

SCI:TeraGrid 资源合作伙伴

基本信息

  • 批准号:
    0503944
  • 负责人:
  • 金额:
    $ 1491.92万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Cooperative Agreement
  • 财政年份:
    2005
  • 资助国家:
    美国
  • 起止时间:
    2005-08-01 至 2015-06-30
  • 项目状态:
    已结题

项目摘要

The Extensible Terascale Facility (ETF) is the next stage in the evolution of NSF large-scale cyberinfrastructure for enabling high-end computational research. The ETF enables researchers to address the most challenging computational problems by utilizing the integrated resources, data collections, instruments and visualization capabilities of nine resource partners. On October 1, 2004, the ETF concluded a three-year construction effort to create this distributed environment called the TeraGrid (TG) and we are now entering the production operations phase.The TeraGrid resource partners include: the University of Chicago/Argonne National Laboratory, the San Diego Supercomputer Center at UCSD, the Texas Advanced Computing Center at UT-Austin, the National Center for Supercomputing Applications at UIUC, Indiana University, Purdue University, Oak Ridge National Laboratory, and the Pittsburgh Supercomputing Center.A separate proposal was submitted to NSF on October 19, 2004 for the TeraGrid Grid Infrastructure Group (GIG). Under the direction of Charlie Catlett at UC/ANL, in general, the GIG will be responsible for coordination of development activities for the TeraGrid with subcontracts to the partner sites. The resource partners (RP) will each have independent cooperative agreements with NSF, but will work closely with the GIG to implement the vision of the TeraGrid.This proposal outlines the plan at SDSC to participate as a resource partner in the TeraGrid team to provide the expanding user community with ongoing access to this computational science facility. This proposal covers the period November 1, 2004 through October 31, 2009.SDSC will bring a powerful set of compute and storage resources to the TeraGrid and will focus on the data-intensive computing needs of TeraGrid scientists. SDSC's current TeraGrid resources are summarized with those of other RP sites and include a 3.1 Tflop IA- 64 system, a 1.1 Tflop Power4 system (part of the larger DataStar system), and an experimental 1.3 Tflop IA-64 system. Every SDSC compute node can access data at 200 MBps or more and can use its DB2 client to address structured databases via leading edge servers. The central Storage Area Network (SAN) has over 0.5 PB of disk and a 6 PB archival tape capacity available to all nodes and servers, and SDSC plans to export its capabilities across the TeraGrid Wide Area Network (WAN) [16, 17] using a true global file system. SDSC's 540 TB SAN of online disk will make possible new modes of handling data across the TeraGrid. Generating data locally, competing with others for disk space and saving results to archival storage through an often slow interface all serve as restrictions to scientists. The ability to write directly to a very large file system, where post-processing can occur and where results are automatically archived, is a significant improvement in capability for scientists. For example, the Southern California Earthquake Center (SCEC) [6] has performed an earthquake simulation analyzing the resulting damage from a potential earthquake in the Southern California region.
可扩展太尺度设施(ETF)是NSF大规模网络基础设施发展的下一个阶段,用于实现高端计算研究。ETF使研究人员能够利用九个资源合作伙伴的综合资源、数据收集、仪器和可视化能力来解决最具挑战性的计算问题。2004年10月1日,ETF结束了为期三年的构建工作,以创建称为TeraGrid(TG)的分布式环境,我们现在进入生产运营阶段。TeraGrid资源合作伙伴包括:芝加哥大学/阿贡国家实验室、加州大学圣地亚哥分校超级计算机中心、德州大学奥斯汀分校的德克萨斯州高级计算中心、UIUC的国家超级计算应用中心、印第安纳州大学、普渡大学、橡树岭国家实验室和匹兹堡超级计算中心。2004年10月19日,TeraGrid网格基础设施组(GIG)向NSF提交了一份单独的提案。在UC/ANL的Charlie Catlett的指导下,一般来说,GIG将负责协调TeraGrid的开发活动,并将合同分包给合作伙伴网站。资源合作伙伴(RP)将分别与NSF签订独立的合作协议,但将与GIG密切合作,以实现TeraGrid的愿景。该提案概述了SDSC作为TeraGrid团队的资源合作伙伴参与的计划,以向不断扩大的用户社区提供对该计算科学设施的持续访问。SDSC将为TeraGrid带来一套强大的计算和存储资源,并将专注于TeraGrid科学家的数据密集型计算需求。SDSC目前的TeraGrid资源与其他RP站点的资源进行了总结,包括一个3.1 Tflop IA- 64系统,一个1.1 Tflop Power 4系统(较大DataStar系统的一部分)和一个实验性的1.3 Tflop IA-64系统。每个SDSC计算节点都可以以200 MBps或更高的速度访问数据,并可以使用其DB2客户机通过前沿服务器访问结构化数据库。中央存储区域网络(SAN)拥有超过0.5 PB的磁盘和6 PB的归档磁带容量,可用于所有节点和服务器,SDSC计划使用真正的全局文件系统将其功能导出到TeraGrid广域网(WAN)[16,17]。SDSC的540 TB SAN在线磁盘将使处理TeraGrid数据的新模式成为可能。在本地生成数据,与其他人竞争磁盘空间,并通过通常缓慢的界面将结果保存到档案存储中,这些都是对科学家的限制。直接写入到非常大的文件系统的能力,其中可以进行后处理并自动存档结果,这对科学家来说是一个重大的能力改进。例如,南加州地震中心(SCEC)[6]进行了地震模拟,分析了南加州地区潜在地震造成的损失。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Richard Moore其他文献

Restaurants, chefs and local foods: insights drawn from application of a diffusion of innovation framework
餐厅、厨师和当地食品:从创新框架传播应用中得出的见解
  • DOI:
    10.1007/s10460-008-9165-6
  • 发表时间:
    2009
  • 期刊:
  • 影响因子:
    4.5
  • 作者:
    Shoshanah M. Inwood;J. Sharp;Richard Moore;D. Stinner
  • 通讯作者:
    D. Stinner
Supernova 2009dc in UGC 10064
UGC 10064 中的超新星 2009dc
  • DOI:
  • 发表时间:
    2009
  • 期刊:
  • 影响因子:
    0
  • 作者:
    T. Puckett;Richard Moore;J. Newton;T. Orff
  • 通讯作者:
    T. Orff
THE GRICEAN INTENTIONAL STRUCTURE OF APE GESTURAL COMMUNICATION
猿手势交流的 GRICE 意向结构
Learning to do things with words
学会用言语做事
  • DOI:
    10.4324/9780203762547-22
  • 发表时间:
    2009
  • 期刊:
  • 影响因子:
    2.2
  • 作者:
    Richard Moore
  • 通讯作者:
    Richard Moore
THE ONTOGENY AND PHYLLOTACTIC TRANSITIONS OF DIPHASIASTRUM
双相虫的个体发育和叶序转变
  • DOI:
  • 发表时间:
    2012
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Xiaofeng Yin;Xiaofeng Yin;Richard Moore
  • 通讯作者:
    Richard Moore

Richard Moore的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Richard Moore', 18)}}的其他基金

The Communicative Mind
沟通的心灵
  • 批准号:
    MR/Y011678/1
  • 财政年份:
    2024
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Fellowship
The Communicative Mind
沟通的心灵
  • 批准号:
    MR/S033858/1
  • 财政年份:
    2020
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Fellowship
Collaborative Research: Mathematical and computational methods for stochastic systems in nonlinear optics
合作研究:非线性光学中随机系统的数学和计算方法
  • 批准号:
    1109278
  • 财政年份:
    2011
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Standard Grant
Linking Watershed Research and GK-12 Education within an Ecosystem Context
在生态系统背景下将流域研究与 GK-12 教育联系起来
  • 批准号:
    0638669
  • 财政年份:
    2007
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Continuing Grant
Blue Ribbon Panel on Sustainable Digital Preservation and Access
可持续数字保存和访问蓝带小组
  • 批准号:
    0737721
  • 财政年份:
    2007
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Continuing Grant
Simulation of Rare Events in Lightwave Systems
光波系统中罕见事件的模拟
  • 批准号:
    0538499
  • 财政年份:
    2006
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Continuing Grant
Collaborative Research: Patterns, Stability, and Thermal Effects in Parametric Gain Devices
协作研究:参数增益器件中的模式、稳定性和热效应
  • 批准号:
    0511091
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Standard Grant
BE/CNH: Impact of Economics-Driven Land-Use Decisions on Watershed Health
BE/CNH:经济驱动的土地利用决策对流域健康的影响
  • 批准号:
    0308464
  • 财政年份:
    2003
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Standard Grant
Dynamics of a Disaster: Hurricane Impact, Recovery and Mitigation in the U.S. Virgin Islands; Workshop to be held Fall 1996, St. Thomas, Virgin Islands
灾难动态:美属维尔京群岛的飓风影响、恢复和缓解;
  • 批准号:
    9634354
  • 财政年份:
    1996
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Standard Grant
Biosynthesis of Secondary Metabolites from Blue-Green Algae
蓝绿藻次生代谢产物的生物合成
  • 批准号:
    9530794
  • 财政年份:
    1996
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Continuing Grant

相似海外基金

NATIONAL BIOMEDICAL COMPUTATION RESOURCE SCIENCE GATEWAY FOR THE TERAGRID
太格网国家生物医学计算资源科学网关
  • 批准号:
    8171799
  • 财政年份:
    2010
  • 资助金额:
    $ 1491.92万
  • 项目类别:
NATIONAL BIOMEDICAL COMPUTATION RESOURCE SCIENCE GATEWAY FOR THE TERAGRID
太格网国家生物医学计算资源科学网关
  • 批准号:
    7956144
  • 财政年份:
    2009
  • 资助金额:
    $ 1491.92万
  • 项目类别:
NATIONAL BIOMEDICAL COMPUTATION RESOURCE SCIENCE GATEWAY FOR THE TERAGRID
太格网国家生物医学计算资源科学网关
  • 批准号:
    7723234
  • 财政年份:
    2008
  • 资助金额:
    $ 1491.92万
  • 项目类别:
NATIONAL BIOMEDICAL COMPUTATION RESOURCE SCIENCE GATEWAY FOR THE TERAGRID
太格网国家生物医学计算资源科学网关
  • 批准号:
    7601497
  • 财政年份:
    2007
  • 资助金额:
    $ 1491.92万
  • 项目类别:
SCI: TeraGrid Resource Partner
SCI:TeraGrid 资源合作伙伴
  • 批准号:
    0504064
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Cooperative Agreement
SCI: TeraGrid Resource Partners
SCI:TeraGrid 资源合作伙伴
  • 批准号:
    0504074
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Interagency Agreement
SCI: TeraGrid Resource Partners
SCI:TeraGrid 资源合作伙伴
  • 批准号:
    0504077
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Cooperative Agreement
SCI: TeraGrid Resource Partners
SCI:TeraGrid 资源合作伙伴
  • 批准号:
    0503992
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Cooperative Agreement
SCI: Teragrid Resource Partners
SCI:Teragrid 资源合作伙伴
  • 批准号:
    0504078
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Cooperative Agreement
SCI: TeraGrid Resource Partners
SCI:TeraGrid 资源合作伙伴
  • 批准号:
    0504086
  • 财政年份:
    2005
  • 资助金额:
    $ 1491.92万
  • 项目类别:
    Cooperative Agreement
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了