A Study on the Framework of Advanced Demand Side Management Using Information Technology

利用信息技术的先进需求侧管理框架研究

基本信息

  • 批准号:
    14350144
  • 负责人:
  • 金额:
    $ 5.12万
  • 依托单位:
  • 依托单位国家:
    日本
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
  • 财政年份:
    2002
  • 资助国家:
    日本
  • 起止时间:
    2002 至 2004
  • 项目状态:
    已结题

项目摘要

In order to utilize natural resources, and to mitigate environmental effect, demand side management is drawing attention. With Demand Side Management, it is expected that the energy conservation in electrical energy supply system can be achieved. It is also expected that equipment investment can be reduced.In this research project, what a future demand side management system should be is discussed. The information technologies should be utilized to fulfill each customer's request. The system must be compatible with the deregulated (or liberalized) electrical energy supply system.First, "modeling of consumer behavior" and "menu for consumer to realize effective demand side management" are studied. Since the energy storage system is very expensive so far, it might be probable that improving supply reliability with energy storage system has negative effect on social welfare. Selective load curtailment is considered as a kind of multiple quality power supply.Second, the real time demand side management, a combination of direct equipment control and indirect control with pricing, is studied. The effectiveness of the demand side management with bonus, which is considered as a kind of indirect control, is examined. Since a large number of consumers can participate in the demand side management with bonus, big effect can be expected. The effects of the proposed real time demand side management are as follows :-Consumer utility is little reduced.-Equipment investment in electric energy supply system is reduced.-Social welfare is increased.-CO2 emission can be reduced.
为了利用自然资源,减轻环境影响,需求侧管理正引起人们的关注。电力需求侧管理是实现电力系统节能的有效手段。在本研究计画中,探讨未来需求侧管理系统应该是什么样的。应利用信息技术来满足每个客户的要求。该系统必须与放松管制(或自由化)的电力供应系统相兼容。首先,研究了“用户行为建模”和“用户实现有效需求侧管理的菜单”。由于储能系统目前非常昂贵,因此利用储能系统提高供电可靠性可能会对社会福利产生负面影响。将选择性弃负荷看作是一种多品质供电。其次,研究了直接设备控制与间接控制与电价相结合的真实的实时需求侧管理。将带奖金的需求侧管理视为一种间接控制,对这种管理的有效性进行了检验。由于大量的消费者可以参与需求侧管理,并获得奖金,因此可以预期会产生很大的效果。所提出的真实的时间需求侧管理的效果如下:-消费者效用几乎没有降低。减少了供电系统的设备投资。社会福利有所增加。可以减少CO2排放。

项目成果

期刊论文数量(12)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
需要家端における選択的負荷遮断契約が需要家側・供給側に与える影響
选择性减载合同对消费者和供应方的影响
リアルタイム料金設定が環境と社会余剰に及ぼす影響
实时定价对环境和社会盈余的影响
A Study on Supply Side and Demand Side Economical Effect of Interruptible Load Contract
间歇性负荷合同供需侧经济效益研究
Effect of Real-Time-Rate on Environment and Social Surplus
实时汇率对环境和社会盈余的影响
  • DOI:
  • 发表时间:
    2004
  • 期刊:
  • 影响因子:
    0
  • 作者:
    セーコック ウォーラウット;横山明彦;仁田旦三;Y.Kondo
  • 通讯作者:
    Y.Kondo
A Study on Effect of Selective Interruptible Load Contract for Demand Side and Supply Side
选择性可中断负荷合同对供需双方的影响研究
  • DOI:
  • 发表时间:
    2002
  • 期刊:
  • 影响因子:
    0
  • 作者:
    山口雄平;古荘純次;菊池武士;木村真也;M.Nakamura
  • 通讯作者:
    M.Nakamura
{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

OYAMA Tsutomu其他文献

OYAMA Tsutomu的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('OYAMA Tsutomu', 18)}}的其他基金

Stabilization Control of Power Systems with Dynamic Voltage Support by Renewable Energy Sources
可再生能源动态电压支持的电力系统稳定控制
  • 批准号:
    16H04314
  • 财政年份:
    2016
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
Development of New Algorithm for Power System Unit Commitment Considering Fuel Consumption Constraint
考虑油耗约束的电力系统机组承诺新算法开发
  • 批准号:
    07455118
  • 财政年份:
    1995
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
Integrated System for Power Systems Operations and Planning
电力系统运行和规划集成系统
  • 批准号:
    06044252
  • 财政年份:
    1994
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for Overseas Scientific Survey.
The Institutionalisation of School and National Integraton in Modern French
现代法语中的学校制度化与民族融合
  • 批准号:
    04802005
  • 财政年份:
    1992
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for General Scientific Research (C)
Epidural Treatment and Endocrine Response to Pain in Cancer Patients
癌症患者的硬膜外治疗和疼痛的内分泌反应
  • 批准号:
    62480324
  • 财政年份:
    1987
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for General Scientific Research (B)
The Currents of Anti-Statist Thought in 19th century France
19世纪法国反国家主义思潮
  • 批准号:
    60520037
  • 财政年份:
    1985
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Grant-in-Aid for General Scientific Research (C)

相似海外基金

Collaborative Research: SAI-P: Institutional Design Innovation for Power System Reliability as the Grid Decarbonizes
合作研究:SAI-P:电网脱碳时电力系统可靠性的制度设计创新
  • 批准号:
    2228697
  • 财政年份:
    2022
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Standard Grant
Collaborative Research: SAI-P: Institutional Design Innovation for Power System Reliability as the Grid Decarbonizes
合作研究:SAI-P:电网脱碳时电力系统可靠性的制度设计创新
  • 批准号:
    2228699
  • 财政年份:
    2022
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Standard Grant
Collaborative Research: SAI-P: Institutional Design Innovation for Power System Reliability as the Grid Decarbonizes
合作研究:SAI-P:电网脱碳时电力系统可靠性的制度设计创新
  • 批准号:
    2228698
  • 财政年份:
    2022
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Standard Grant
Designing the next generation of wind turbine converter controllers for wind power applications: Enhancing the power system reliability, stability and
设计用于风力发电应用的下一代风力涡轮机变流器控制器:增强电力系统的可靠性、稳定性和
  • 批准号:
    2300479
  • 财政年份:
    2019
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Studentship
Power System Reliability Evaluation Incorporating Renewable Energy and Smart Grid Initiatives
结合可再生能源和智能电网计划的电力系统可靠性评估
  • 批准号:
    RGPIN-2015-06327
  • 财政年份:
    2019
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Discovery Grants Program - Individual
Power System Reliability Evaluation Incorporating Renewable Energy and Smart Grid Initiatives
结合可再生能源和智能电网计划的电力系统可靠性评估
  • 批准号:
    RGPIN-2015-06327
  • 财政年份:
    2018
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Discovery Grants Program - Individual
Power System Reliability Evaluation Incorporating Renewable Energy and Smart Grid Initiatives
结合可再生能源和智能电网计划的电力系统可靠性评估
  • 批准号:
    RGPIN-2015-06327
  • 财政年份:
    2017
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Discovery Grants Program - Individual
Power System Reliability Evaluation Incorporating Renewable Energy and Smart Grid Initiatives
结合可再生能源和智能电网计划的电力系统可靠性评估
  • 批准号:
    RGPIN-2015-06327
  • 财政年份:
    2016
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Discovery Grants Program - Individual
Power system reliability methodology to incorporate emerging measures for variable supply-demand characteristics
电力系统可靠性方法,纳入针对可变供需特征的新兴措施
  • 批准号:
    500522-2016
  • 财政年份:
    2016
  • 资助金额:
    $ 5.12万
  • 项目类别:
    Engage Grants Program
Time series analysis with applications in power system reliability, climate, and space physics
时间序列分析在电力系统可靠性、气候和空间物理中的应用
  • 批准号:
    481202-2015
  • 财政年份:
    2015
  • 资助金额:
    $ 5.12万
  • 项目类别:
    University Undergraduate Student Research Awards
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了