The Flood in Bangladesh and Its Countermeasures

孟加拉国洪涝灾害及对策

基本信息

  • 批准号:
    14404005
  • 负责人:
  • 金额:
    $ 4.54万
  • 依托单位:
  • 依托单位国家:
    日本
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
  • 财政年份:
    2002
  • 资助国家:
    日本
  • 起止时间:
    2002 至 2003
  • 项目状态:
    已结题

项目摘要

Every year, many areas of Bangladesh are inundated by flood Its impact on society and economic activities are becoming overbearing for the people of Bangladesh. In order to mitigate the flood disaster, basic research on the mechanisms of floods is indispensableThe following four subjects were investigated intensively.1) Estimation of the rainfall runoff from upstream region of the Meghna River: The rainfall runoff characteristic of the Meghna River is still not fully understood. In order to prevent or mitigate flood disasters in northeast Bangladesh, the clarification of rainfall runoff mechanisms in the upstream region of the Meghna River is important and necessary. The clarification of rainfall runoff process was clarified by using the existing hydrological data effectively.2) Numerical Analysis of Flash Flood in the Monu River Basin: The rainfall runoff into the Monu River on June 5 and 6, 2001 was calculated and flooding upstream of the Monu Railway Bridge was simulated using the FDM model. It was clarified that the following three items are important in order to mitigate flash flooding in this area ; embankments should be strengthened and set back sufficiently from the river, all obstructions on the embankments should be removed to allow smooth passage of flood flow, and joint studies with Indian authorities should be considered.3) Numerical Simulation of Flood Lake Behavior m Northeastern Bangladesh: In order to clarify the hydrological and hydraulic behavior of flood lake (Haor), a numerical inundation model was developed. The behavior of Hakaluki Haor and the possibility of developing this area were discussed.4) Investigation of Lifestyle and Environmental Condition on the residents around Haor. The lifestyle and socio-economic conditions of the people of Bangladesh are governed mainly by flood The relation between human life and flood in Sylhet region was clarified by investigation of the questionnaire type.
每年,孟加拉国的许多地区都被洪水淹没,它对孟加拉国人民的社会和经济活动的影响越来越大。为了减轻洪水灾害,对洪水发生机理的基础研究是必不可少的。本文重点研究了以下四个方面的内容:1)Meghna河上游地区降雨径流量的估算:Meghna河的降雨径流特性至今尚未完全了解。为了预防和减轻孟加拉国东北部地区的洪水灾害,澄清梅克纳河上游地区的降雨径流机制是重要和必要的。2)Monu河流域山洪数值分析:计算了2001年6月5日和6日Monu河流域的降雨径流量,并采用FDM模型模拟了Monu铁路桥上游的洪水。为了减轻该地区的山洪暴发,以下三项是重要的:应加强堤坝并使其充分远离河流,应清除堤坝上的所有障碍物以使洪水顺利通过,并应考虑与印度当局进行联合研究。3)孟加拉国东北部洪水湖行为的数值模拟:为了研究浩尔湖的水文水力特性,建立了浩尔湖淹没数值模型。探讨了哈卡鲁基豪尔的行为特征及开发该地区的可能性。4)豪尔周边居民生活方式及环境状况调查。孟加拉国人民的生活方式和社会经济状况主要受洪水的影响。通过问卷调查,阐明了锡耶特地区人类生活与洪水之间的关系。

项目成果

期刊论文数量(40)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
Yoshinobu Kido: "Investigation of Lifestyle and Environmental Condition on the residents around Haors in the north-east of Bangladesh"Hydrological and Morphological Study of the Meghna River. Vol.1. 171-182
木户义信:《孟加拉国东北部豪尔斯周边居民生活方式和环境状况调查》梅格纳河水文形态研究。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
Taro Oka, SMU Ahmed, SK Bala: "Numerical Analysis of Flash Flood in the Monu River Basin Caused by Heavy Rainfall on June 6, 2001"Hydrological and Morphological Study of the Meghna River. Vol.1. 151-159
Taro Oka、SMU Ahmed、SK Bala:“2001 年 6 月 6 日大雨造成莫努河流域山洪的数值分析”梅格纳河水文和形态研究。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
Taro Oka, S.M.U.Ahmed, S.K.Bala, Makiko Iguchi: "Flash Flood and Inundation Process in the Monu River Basin Caused by Heavy Rainfall on June 6, 2001"Proc.of APHW. No.1. FL-13 (2003)
Taro Oka、S.M.U.Ahmed、S.K.Bala、Makiko Iguchi:“2001 年 6 月 6 日大雨造成莫努河流域的山洪和淹没过程”Proc.of APHW。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
Taro Oka, Hidetaka Suzuki: "Estimation of the Rainfall Runoff from Upstream Region of the Meghna River"Hydrological and Morphological Study of the Meghna River. Vol.1. No.1-No.7 (2004)
Taro Oka、Hidetaka Suzuki:“梅格纳河上游地区降雨径流的估算”梅格纳河水文和形态研究。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
Taro Oka, Hidetaka Suzuki: "Estimation of the Rainfall Runoff from Upstream Region of the Meghna River"Hydrological and Morphological Study of the Meghna River. Vol.1. 135-149 (2004)
Taro Oka、Hidetaka Suzuki:“梅格纳河上游地区降雨径流的估算”梅格纳河水文和形态研究。
  • DOI:
  • 发表时间:
  • 期刊:
  • 影响因子:
    0
  • 作者:
  • 通讯作者:
{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

OKA Taro其他文献

OKA Taro的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('OKA Taro', 18)}}的其他基金

Hydrological Study on Flood Lake Behavior in Bangladesh
孟加拉国洪水湖泊行为的水文研究
  • 批准号:
    11691151
  • 财政年份:
    1999
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (A)
The Research on Design, Construction and Operations Management of the Underground dam
地下坝设计、施工及运行管理研究
  • 批准号:
    10556051
  • 财政年份:
    1998
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (B).
Comprehensive Study on Floods and Storm Surges in Bangladesh and Their Hazard Mitigation
孟加拉国洪水和风暴潮及其减灾综合研究
  • 批准号:
    04041064
  • 财政年份:
    1992
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for international Scientific Research
Basic Research on the Prime Runoff Process of Rainfall in a Hillside Slope
山坡降雨主径流过程的基础研究
  • 批准号:
    59420043
  • 财政年份:
    1984
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for General Scientific Research (A)
Development of Rain Gage and Water-stage Gage of Memory Type
记忆式雨量计、水位计的研制
  • 批准号:
    59850089
  • 财政年份:
    1984
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Developmental Scientific Research

相似海外基金

Development of a Flood Disaster-Prevention Training Program in a Primary School based on Debris Flow Disasters in an Area
基于某地区泥石流灾害的小学洪水防灾培训项目的开发
  • 批准号:
    23K02445
  • 财政年份:
    2023
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Research on short-term risk finance evaluation model considering the storm and flood disaster-related characteristics and financial conditions
考虑风暴洪涝灾害相关特征和财务状况的短期风险财务评价模型研究
  • 批准号:
    21K04591
  • 财政年份:
    2021
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Development of rainfall-runoff and flood inundation integrated analysis model and parameter optimization method for basinwide comprehensive flood disaster prevention
全流域综合防洪雨径洪涝综合分析模型及参数优化方法开发
  • 批准号:
    21K04277
  • 财政年份:
    2021
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Multiple Evaluation of Urban Shrinking for Adapting Population Decreasing with Mitigation of Flood Disaster Risk
城市收缩适应人口减少、减轻洪涝灾害风险的多重评价
  • 批准号:
    21K20463
  • 财政年份:
    2021
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Research Activity Start-up
Development of a flood disaster prevention education program with additional learning for urban flooding from inland waters
制定洪水灾害预防教育计划,并额外学习内陆水域的城市洪水
  • 批准号:
    20K22225
  • 财政年份:
    2020
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Research Activity Start-up
BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience
巨石:山体滑坡洪水灾害评估和复原力中巨石的核算
  • 批准号:
    NE/S005951/2
  • 财政年份:
    2019
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Research Grant
Development of The Flood Disaster Education System utilizing Augmented Reality Based on Reliable Physical Law
基于可靠物理定律的增强现实洪涝灾害教育系统开发
  • 批准号:
    19K04971
  • 财政年份:
    2019
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Prediction of and evacuation from flood disaster in snowmelt season based on Soil Water Index and decision tree model -A case study of Tomsk city, Russia-
基于土壤水分指数和决策树模型的融雪季节洪涝灾害预测与疏散——以俄罗斯托木斯克市为例-
  • 批准号:
    18KK0028
  • 财政年份:
    2018
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Fund for the Promotion of Joint International Research (Fostering Joint International Research (B))
BOULDER: Accounting for BOUlders in Landslide-flood Disaster Evaluation and Resilience
巨石:山体滑坡洪水灾害评估和复原力中巨石的核算
  • 批准号:
    NE/S005951/1
  • 财政年份:
    2018
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Research Grant
The developing of a simulator for flood disaster to estimate the damage of structure
洪水灾害模拟器的研制以评估结构的损坏
  • 批准号:
    17K01334
  • 财政年份:
    2017
  • 资助金额:
    $ 4.54万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了