PFP- Pilot & Feasibility Program

PFP-飞行员

基本信息

  • 批准号:
    10480962
  • 负责人:
  • 金额:
    $ 18.96万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
  • 财政年份:
    2011
  • 资助国家:
    美国
  • 起止时间:
    2011-09-20 至 2026-06-30
  • 项目状态:
    未结题

项目摘要

PROJECT SUMMARY/ABSTRACT – Pilot and Feasibility Program The purpose of the Pilot and Feasibility Program (PFP) of the Washington University Center for Diabetes Translation Research (WU-CDTR) is to promote innovative and transformative research designed to eliminate disparities in diabetes by investigators new to the field. The PFP focuses on T2-T4 translational research defined as ‘translating interventions and approaches that have demonstrated efficacy into real-world healthcare settings, communities, and diverse populations with an emphasis on reach, sustainability, and potential for widespread implementation’. The PFP provides initial research support over limited time periods to eligible investigators exploring the feasibility of ideas or concepts related to the WU-CDTR mission to be the nexus for transdisciplinary team science in advancing the conduct of next generation diabetes translation research. A priority of the PFP is to attract and retain early-stage investigators conducting diabetes translation research, and to successfully support the development of all investigators who are members of the WU-CDTR. Members of the WU-CDTR are affiliated through Washington University in St. Louis; the University of Missouri in Columbia, MO; and the Council on Black Health at Drexel University. The PFP allows investigators to develop preliminary data sufficient to provide the basis for subsequent applications for independent research support from outside granting mechanisms. The successes of this program can be demonstrated in significant new external funding, career advancement, and publications of PFP grant recipients. The specific aims of the PFP are to continue to provide support for: (1) new investigators in T2 to T4 diabetes translation research without current or past independent NIH research support; (2) established investigators with previous work in diabetes translation research who want to explore innovative new directions in research; and (3) established investigators from other scientific or disciplinary areas without previous work in diabetes who are entering into new T2 to T4 diabetes translation research that represents a clear departure from their ongoing research interests. Future directions for the PFP, based on our Center mission and careful evaluation of this progress, will build on principles of mentorship and collaboration to assure continued success of the program.
项目摘要/摘要-试点和可行性计划

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Neil H. White其他文献

Does diabetes prevention translate into reduced long-term vascular complications of diabetes?
  • DOI:
    10.1007/s00125-019-4928-8
  • 发表时间:
    2019-07-04
  • 期刊:
  • 影响因子:
    10.200
  • 作者:
    David M. Nathan;Peter H. Bennett;Jill P. Crandall;Sharon L. Edelstein;Ronald B. Goldberg;Steven E. Kahn;William C. Knowler;Kieren J. Mather;Sunder Mudaliar;Trevor J. Orchard;Marinella Temprosa;Neil H. White
  • 通讯作者:
    Neil H. White

Neil H. White的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Neil H. White', 18)}}的其他基金

PFP- Pilot & Feasibility Program
PFP-飞行员
  • 批准号:
    10289789
  • 财政年份:
    2011
  • 资助金额:
    $ 18.96万
  • 项目类别:
PFP- Pilot & Feasibility Program
PFP-飞行员
  • 批准号:
    10661799
  • 财政年份:
    2011
  • 资助金额:
    $ 18.96万
  • 项目类别:
THE EPIDEMIOLOGY OF DIABETES INTERVENTION AND COMPLICATIONS (EDIC)
糖尿病干预和并发症的流行病学 (EDIC)
  • 批准号:
    7603383
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
Diabetes Research in Children Network (DirecNet)
儿童糖尿病研究网络 (DirecNet)
  • 批准号:
    7323957
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
Diabetes Research in Children Network (DirecNet)
儿童糖尿病研究网络 (DirecNet)
  • 批准号:
    7501881
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
TRIALNET HISTORY STUDY OF THE DEVELOPMENT OF TYPE I DIABETES
I 型糖尿病发展的 Trialnet 历史研究
  • 批准号:
    7603401
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
Diabetes Research in Children Network (DirecNet)
儿童糖尿病研究网络 (DirecNet)
  • 批准号:
    7932053
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
Diabetes Research in Children Network (DirecNet)
儿童糖尿病研究网络 (DirecNet)
  • 批准号:
    8120962
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
DIABETES PREVENTION PROGRAM - OUTCOMES STUDY (DPP-OS)
糖尿病预防计划 - 结果研究 (DPP-OS)
  • 批准号:
    7603316
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:
NUTRITIONAL PRIMARY PREVENTION OF TYPE I DIABETES IN CHILDREN
儿童 I 型糖尿病的营养一级预防
  • 批准号:
    7603388
  • 财政年份:
    2007
  • 资助金额:
    $ 18.96万
  • 项目类别:

相似国自然基金

层出镰刀菌氮代谢调控因子AreA 介导伏马菌素 FB1 生物合成的作用机理
  • 批准号:
    2021JJ40433
  • 批准年份:
    2021
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
寄主诱导梢腐病菌AreA和CYP51基因沉默增强甘蔗抗病性机制解析
  • 批准号:
    32001603
  • 批准年份:
    2020
  • 资助金额:
    24.0 万元
  • 项目类别:
    青年科学基金项目
AREA国际经济模型的移植.改进和应用
  • 批准号:
    18870435
  • 批准年份:
    1988
  • 资助金额:
    2.0 万元
  • 项目类别:
    面上项目

相似海外基金

Onboarding Rural Area Mathematics and Physical Science Scholars
农村地区数学和物理科学学者的入职
  • 批准号:
    2322614
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
TRACK-UK: Synthesized Census and Small Area Statistics for Transport and Energy
TRACK-UK:交通和能源综合人口普查和小区域统计
  • 批准号:
    ES/Z50290X/1
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Research Grant
Wide-area low-cost sustainable ocean temperature and velocity structure extraction using distributed fibre optic sensing within legacy seafloor cables
使用传统海底电缆中的分布式光纤传感进行广域低成本可持续海洋温度和速度结构提取
  • 批准号:
    NE/Y003365/1
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Research Grant
Point-scanning confocal with area detector
点扫描共焦与区域检测器
  • 批准号:
    534092360
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Major Research Instrumentation
Collaborative Research: Scalable Manufacturing of Large-Area Thin Films of Metal-Organic Frameworks for Separations Applications
合作研究:用于分离应用的大面积金属有机框架薄膜的可扩展制造
  • 批准号:
    2326714
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
Collaborative Research: Scalable Manufacturing of Large-Area Thin Films of Metal-Organic Frameworks for Separations Applications
合作研究:用于分离应用的大面积金属有机框架薄膜的可扩展制造
  • 批准号:
    2326713
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
Unlicensed Low-Power Wide Area Networks for Location-based Services
用于基于位置的服务的免许可低功耗广域网
  • 批准号:
    24K20765
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Grant-in-Aid for Early-Career Scientists
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427233
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427232
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427231
  • 财政年份:
    2024
  • 资助金额:
    $ 18.96万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了