BINOCULAR COORDINATION OF EYE MOVEMENTS
BINOCULAR COORDINATION OF EYE MOVEMENTS
批准号:
7958123
负责人:
VALLABH E DAS
金额:
$5.48万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2009
资助国家:
美国
项目状态:
已结题
起止时间:
2009-05-01 至 2010-04-30
关键词:
Animal ModelAnimalsAreaBehavioralComputer Retrieval of Information on Scientific Projects DatabaseContact LensesDataDevelopmentEnsureEyeEye MovementsFundingGrantHumanIncidenceInfantInstitutionLifeMaintenanceMidbrain structureMonkeysMotorMotor NeuronsNeuronsPatternPlayPopulationPositioning AttributePrimatesReportingResearchResearch PersonnelResourcesRoleSensorySourceStrabismusTimeUnited States National Institutes of HealthVisualVisual Accommodationbaseexperiencegazehuman datamonocularneurophysiology
中文摘要
点击翻译按钮获取中文摘要
英文摘要
This subproject is one of many research subprojects utilizing the
resources provided by a Center grant funded by NIH/NCRR. The subproject and
investigator (PI) may have received primary funding from another NIH source,
and thus could be represented in other CRISP entries. The institution listed is
for the Center, which is not necessarily the institution for the investigator.
Binocular alignment must be maintained in the horizontal, vertical and torsional planes to ensure binocular sensory fusion. Unfortunately, abnormal visual experience during development usually leads to ocular misalignment (strabismus). In fact, various studies have reported the incidence of strabismus to be about 2-5% of the infant population.
We have developed an animal model for strabismus by rearing monkeys that only view the world through one eye at a time. This is accomplished by placing an opaque contact lens on one eye and alternating to the other eye on a daily basis (alternate monocular occlusion) for the first few months of life. Our data from strabismic monkeys are similar to human data showing that ocular misalignment is accompanied by a lack of binocular coordination. In addition to horizontal misalignment, we have found that the animals show vertical misalignment with the non-fixating eye being higher than the fixating eye. Both horizontal and vertical misalignment varies with gaze position. Thus our rearing paradigm of alternate monocular occlusion produces animals with alignment patterns that resemble human forms of strabismus such as A/V pattern strabismus and Dissociated Vertical Deviation (DVD).
These phenomena are incompletely understood and we are conducting neurophysiological and behavioral studies to study them. We previously showed that neuronal drive from motoneurons was responsible for determining the state of eye misalignment in animals with a sensory form of strabismus.
New data shows that pre-motor areas in the midbrain relating to control of vergence and ocular accommodation might play a role in the development and maintenance of strabismus. Completion of our studies will be of benefit to the understanding and treatment of certain types of strabismus.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Binocular Coordination of Eye Movements
-
批准号:10525232
-
项目类别:
-
资助金额:$39.3万
-
财政年份:2016
-
负责人:VALLABH E DAS
-
依托单位:
Binocular Coordination of Eye Movements
-
批准号:9896182
-
项目类别:
-
资助金额:$38.75万
-
财政年份:2016
-
负责人:VALLABH E DAS
-
依托单位:
Binocular Coordination of Eye Movements
-
批准号:10303058
-
项目类别:
-
资助金额:$37.59万
-
财政年份:2016
-
负责人:VALLABH E DAS
-
依托单位:
Neural Adaptation to Strabismus Surgery
-
批准号:8342546
-
项目类别:
-
资助金额:$33.74万
-
财政年份:2012
-
负责人:VALLABH E DAS
-
依托单位:
Neural Adaptation to Strabismus Surgery
-
批准号:8918626
-
项目类别:
-
资助金额:$33.19万
-
财政年份:2012
-
负责人:VALLABH E DAS
-
依托单位:
Neural Adaptation to Strabismus Surgery
-
批准号:8515429
-
项目类别:
-
资助金额:$32.16万
-
财政年份:2012
-
负责人:VALLABH E DAS
-
依托单位:
Neural Adaptation to Strabismus Surgery
-
批准号:8699781
-
项目类别:
-
资助金额:$33.19万
-
财政年份:2012
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:7715688
-
项目类别:
-
资助金额:$3.56万
-
财政年份:2008
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:7562531
-
项目类别:
-
资助金额:$3.95万
-
财政年份:2007
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:7349176
-
项目类别:
-
资助金额:$4.01万
-
财政年份:2006
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:7165908
-
项目类别:
-
资助金额:$4.0万
-
财政年份:2005
-
负责人:VALLABH E DAS
-
依托单位:
DEVELOPMENT OF THE OCULOMOTOR SYSTEM
-
批准号:7165956
-
项目类别:
-
资助金额:$3.08万
-
财政年份:2005
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION IN MONKEYS WITH STRABISMUS
-
批准号:6735593
-
项目类别:
-
资助金额:$36.99万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
Binocular Coordination of Eye Movements
-
批准号:7903882
-
项目类别:
-
资助金额:$37.13万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENT IN MONKEYS
-
批准号:6970985
-
项目类别:
-
资助金额:$4.47万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
Binocular Coordination of Eye Movements
-
批准号:8113433
-
项目类别:
-
资助金额:$35.64万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
FUNCTIONAL & STRUCTURAL REPAIR IN MACAQUE STRABISMUS
-
批准号:6971047
-
项目类别:
-
资助金额:$3.44万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
Binocular Coordination of Eye Movements
-
批准号:7676663
-
项目类别:
-
资助金额:$36.25万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:7013998
-
项目类别:
-
资助金额:$37.13万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
BINOCULAR COORDINATION OF EYE MOVEMENTS
-
批准号:6843152
-
项目类别:
-
资助金额:$36.02万
-
财政年份:2004
-
负责人:VALLABH E DAS
-
依托单位:
海外基金