Planning-Priority Stage
规划-优先阶段
基本信息
- 批准号:7692322
- 负责人:
- 金额:$ 4.05万
- 依托单位:
- 依托单位国家:美国
- 项目类别:
- 财政年份:
- 资助国家:美国
- 起止时间:至
- 项目状态:未结题
- 来源:
- 关键词:AdvocateAreaConsultationsEvaluationExerciseFacultyGoalsGrantHawaiiHealthInstitutionJointsLeadLeadershipLogisticsMapsMediationMentorsMethodologyParticipantRecommendationResearchResearch InfrastructureResearch PersonnelResearch TrainingResourcesSolutionsStagingStrategic PlanningStructureSystemTravelVisionWorkloadconcept
项目摘要
PRIORITY-SETTING STAGE
The IAC will use the following criteria to identify resource needs: 1) Do investigators have access to sufficient
materials to conduct their research and are they being obtained in a timely manner? IAC deliberations will
clarify whether mechanistic solutions (e.g. advocating a streamlined (or purchasing card) ordering system) is
indicated. Infrastructure needs will be determined by considering questions such as the following: 1) Is there
adequeate administrative support to adapt workload to demand? 2) Is there adequate access to mentors by
mentees? 3) Are meetings occurring between partnership participants within their own institution? 4) Are
distance-conferencing capabilities adequate in quality and in ease of use? 5) Are adequate travel resources
available for face-to-face training and research interactions? Remedies for imbalanced infrastructure needs
will involve prioritization and shifting of resources to bridge gaps in the partnership support structure. In some
cases partnership needs will entail negotiation with institutional leadership for additional resources, access to
support staff, or departmental co-sponsorship of activities. IAC consideration of long-term partnership needs
may lead to recommendations for joint institutional recruitment of faculty in specific areas.
In year Two of the partnership, the Annual Retreat will also involve "Concept Mapping" exercises to identify
common and disparate priorities and strategies among partnership stakeholders. The goal of these exercises
will be to elaborate commonalities and differences between stakeholders regarding partnership priorities,
infrastructure and logistic requirements for successfully meeting priorities, and long-term visions for the
partnership. Concept mapping is a formal methodology for obtaining and analyzing group input in developing
action plans, strategic planning, implementation and evaluation of initiatives (4). A recent example of the utility
of this approach was in the planning of a statewide health initiative in Hawaii (5). The Administrative Core will
arrange concept mapping exercises through consultation as part of partnership retreats conducted early in the
first year and in the third year of the grant period.
优先级设定阶段
IAC将使用以下标准来确定资源需求:1)调查人员是否能够获得足够的
是否及时获得了进行研究所需的材料?临时行政委员会的审议将
澄清机械解决方案(例如,提倡简化(或购买卡)订购系统)是否
指出了基础设施需求将通过考虑以下问题来确定:1)是否有
是否有足够的行政支助,使工作量适应需求?2)是否有足够的机会获得导师,
学员?3)伙伴关系参与者之间是否在各自机构内举行会议?4)是
远距离会议能力的质量和易用性是否足够?5)是否有充足的差旅资源
可用于面对面的培训和研究互动?基础设施需求失衡的补救措施
将涉及确定优先次序和转移资源,以弥补伙伴关系支助结构中的差距。在一些
个案伙伴关系需要将需要与机构领导人谈判,以获得更多资源、
支持人员或部门共同赞助活动。临时行政理事会对长期伙伴关系需要的审议
可能会导致在特定领域的教师联合机构招聘的建议。
在伙伴关系的第二年,年度务虚会还将涉及“概念图”活动,
伙伴关系利益攸关方之间有共同和不同的优先事项和战略。这些演习的目的是
将阐述利益攸关方之间在伙伴关系优先事项方面的共同点和差异,
基础设施和后勤要求,以成功地满足优先事项,以及长期愿景,
伙伴关系概念图是一种在开发过程中获取和分析群体输入的形式化方法
行动计划、战略规划、举措的执行和评价(4)。最近的一个例子,
这一方法的一个重要成果是在夏威夷规划一项全州范围的健康倡议(5)。行政核心将
通过协商安排概念规划工作,作为2010年初举行的伙伴关系务虚会的一部分,
第一年和第三年的补助期。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
CECILE ANDRAOS-SELIM其他文献
CECILE ANDRAOS-SELIM的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('CECILE ANDRAOS-SELIM', 18)}}的其他基金
Hampton University Biomedical Research Training Initiative (HUBIRTI)
汉普顿大学生物医学研究培训计划 (HUBIRTI)
- 批准号:
8848397 - 财政年份:2014
- 资助金额:
$ 4.05万 - 项目类别:
Hampton University Biomedical Research Training Initiative (HUBIRTI)
汉普顿大学生物医学研究培训计划 (HUBIRTI)
- 批准号:
8688534 - 财政年份:2014
- 资助金额:
$ 4.05万 - 项目类别:
Hampton University-UPCI Education/Training Program
汉普顿大学-UPCI 教育/培训计划
- 批准号:
7425673 - 财政年份:2007
- 资助金额:
$ 4.05万 - 项目类别:
HU-UCPI Cancer Education/Career Development Partnership
HU-UCPI 癌症教育/职业发展合作伙伴关系
- 批准号:
6794698 - 财政年份:2003
- 资助金额:
$ 4.05万 - 项目类别:
HU-UCPI Cancer Education/Career Development Partnership
HU-UCPI 癌症教育/职业发展合作伙伴关系
- 批准号:
6942708 - 财政年份:2003
- 资助金额:
$ 4.05万 - 项目类别:
HU-UCPI Cancer Education /Career Development Partnership
HU-UCPI 癌症教育/职业发展合作伙伴关系
- 批准号:
6649575 - 财政年份:2003
- 资助金额:
$ 4.05万 - 项目类别:
HU-UCPI Cancer Education/Career Development Partnership
HU-UCPI 癌症教育/职业发展合作伙伴关系
- 批准号:
7283852 - 财政年份:2003
- 资助金额:
$ 4.05万 - 项目类别:
Hampton University-UPCI Education/Training Program
汉普顿大学-UPCI 教育/培训计划
- 批准号:
7692321 - 财政年份:
- 资助金额:
$ 4.05万 - 项目类别:
Hampton University-UPCI Education/Training Program
汉普顿大学-UPCI 教育/培训项目
- 批准号:
7938076 - 财政年份:
- 资助金额:
$ 4.05万 - 项目类别:
相似国自然基金
层出镰刀菌氮代谢调控因子AreA 介导伏马菌素 FB1 生物合成的作用机理
- 批准号:2021JJ40433
- 批准年份:2021
- 资助金额:0.0 万元
- 项目类别:省市级项目
寄主诱导梢腐病菌AreA和CYP51基因沉默增强甘蔗抗病性机制解析
- 批准号:32001603
- 批准年份:2020
- 资助金额:24.0 万元
- 项目类别:青年科学基金项目
AREA国际经济模型的移植.改进和应用
- 批准号:18870435
- 批准年份:1988
- 资助金额:2.0 万元
- 项目类别:面上项目
相似海外基金
Onboarding Rural Area Mathematics and Physical Science Scholars
农村地区数学和物理科学学者的入职
- 批准号:
2322614 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant
Point-scanning confocal with area detector
点扫描共焦与区域检测器
- 批准号:
534092360 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Major Research Instrumentation
TRACK-UK: Synthesized Census and Small Area Statistics for Transport and Energy
TRACK-UK:交通和能源综合人口普查和小区域统计
- 批准号:
ES/Z50290X/1 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Research Grant
Wide-area low-cost sustainable ocean temperature and velocity structure extraction using distributed fibre optic sensing within legacy seafloor cables
使用传统海底电缆中的分布式光纤传感进行广域低成本可持续海洋温度和速度结构提取
- 批准号:
NE/Y003365/1 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Research Grant
Collaborative Research: Scalable Manufacturing of Large-Area Thin Films of Metal-Organic Frameworks for Separations Applications
合作研究:用于分离应用的大面积金属有机框架薄膜的可扩展制造
- 批准号:
2326714 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant
Collaborative Research: Scalable Manufacturing of Large-Area Thin Films of Metal-Organic Frameworks for Separations Applications
合作研究:用于分离应用的大面积金属有机框架薄膜的可扩展制造
- 批准号:
2326713 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant
Unlicensed Low-Power Wide Area Networks for Location-based Services
用于基于位置的服务的免许可低功耗广域网
- 批准号:
24K20765 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Grant-in-Aid for Early-Career Scientists
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427233 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant
Postdoctoral Fellowship: OPP-PRF: Tracking Long-Term Changes in Lake Area across the Arctic
博士后奖学金:OPP-PRF:追踪北极地区湖泊面积的长期变化
- 批准号:
2317873 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427232 - 财政年份:2024
- 资助金额:
$ 4.05万 - 项目类别:
Standard Grant