Set-Based Design for Lean Delivery of Reinforced Concrete Structures
钢筋混凝土结构精益交付的基于集的设计
基本信息
- 批准号:0511044
- 负责人:
- 金额:$ 32.55万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Continuing Grant
- 财政年份:2005
- 资助国家:美国
- 起止时间:2005-09-01 至 2009-08-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
Abstract for CMS 0511044Research will be conducted to integrate and enhance the processes for design, fabrication, and installation of steel rebar in order to achieve systemic improvements. Today's rebar industry is highly fragmented. The current delivery process for rebar is predominantly sequential, employs a time-consuming and ineffective submittal process, under-rewards participants, discourages innovation and promotes local sub-optimization. To reveal the opportunities for process improvement, constructability is viewed holistically. A design is better if it can be constructed more safely, with less risk of defects, in less time and at less cost; at a higher lever, however- and the way it is viewed in this research - the constructability of a design is a function of the optimum work structuring strategy for the project. A promising and new approach to design rebar, following lean construction principles, will be investigated. The research includes (1) definition and development of a new methodology and meta-language to represent data about design and component attributes, do that this data can be carried forward through all phases of rebar delivery; (2) formulation of design rules to reflect the knowledge, skills, and ability of a specialists to work together to assure superior quality of reinforced concrete structures while taking into account the specific circumstances of the project they are jointly working on; (3) articulation and testing of modeling tools including set-based and visualization to enable teams to explore design alternatives with target characteristics in a systematic and efficient way and choose solutions that meet many if not all of their constraints and preferences, and (4) development of process- and organizational understanding of how to engage multi-disciplinary teams of specialists in concurrent engineering in order to generate a design that is of greater value than today's point-based design are. Adoption of this new approach may steer the industry towards restructuring so as to boost its global competitiveness.Numerous specialists are involved in the delivery of capital projects made of reinforced concrete. Specialization has evolved to reflect the advanced technological understanding and capabilities that we exploit today to build structures to meet increasingly stringent owner and societal requirements. The need to specialize, however, has gone hand-in-hand with fragmentation of the industry resulting in a far-from-optimal delivery process. This research focuses on the steel that is used as reinforcing bar in concrete (rebar) and studies the relationships between those who design it and those who make it. The goal is to develop new theory and illustrate its application practice, in order to increase the capabilities, performance, and competitiveness of this sector of the steel industry. A promising and new approach to design rebar, following lean construction principles, will be investigated. These principles build on teamwork, exploration of sets of alternatives and postponement of commitments until sufficient data is available for the team to make an informed decision. Adoption of this new approach may steer the industry towards restructuring so as to boost its global competitiveness.
摘要CMS 0511044将对钢筋的设计、制造和安装过程进行整合和改进,以实现系统改进。如今的螺纹钢行业高度分散。目前螺纹钢的交付过程主要是顺序的,采用了一个耗时且无效的提交过程,对参与者的奖励不足,阻碍了创新,并促进了局部的次优化。为了揭示过程改进的机会,要从整体上看待可构造性。如果设计能够更安全、更少的缺陷风险、更短的时间和更低的成本,那么它就是更好的设计;然而,在更高的层面上——以及在本研究中看待它的方式——设计的可构造性是项目最佳工作结构策略的功能。一个有前途的和新的方法来设计钢筋,遵循精益施工原则,将进行研究。研究包括(1)定义和开发一种新的方法和元语言来表示有关设计和部件属性的数据,使这些数据可以在螺纹钢交付的各个阶段进行;(2)制定设计规则,以反映专家的知识、技能和能力,在考虑到他们共同从事的工程的具体情况下,共同努力,确保钢筋混凝土结构的优质;(3)建模工具的表达和测试,包括基于集合和可视化,使团队能够以系统和有效的方式探索具有目标特征的设计备选方案,并选择满足许多(如果不是全部的话)约束和偏好的解决方案;(4)发展过程和组织的理解,了解如何在并行工程中吸引多学科的专家团队,以产生比当今基于点的设计更有价值的设计。采用这种新方法可能会引导该行业进行重组,从而提高其全球竞争力。许多专家都参与了钢筋混凝土基建项目的交付。专业化已经演变为反映先进的技术理解和能力,我们今天开发的结构,以满足日益严格的业主和社会的要求。然而,专业化的需求与行业的碎片化相伴而来,导致交付过程远非最佳。本研究的重点是在混凝土(钢筋)中用作钢筋的钢材,并研究设计人员和制造人员之间的关系。目标是发展新的理论并说明其应用实践,以提高钢铁行业这一部门的能力、绩效和竞争力。一个有前途的和新的方法来设计钢筋,遵循精益施工原则,将进行研究。这些原则建立在团队合作、探索一系列替代方案和推迟承诺的基础上,直到有足够的数据供团队做出明智的决定。采用这种新方法可能会引导该行业进行重组,从而提高其全球竞争力。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Iris Tommelein其他文献
A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-order Manufacturers
- DOI:
10.1016/j.procir.2014.01.137 - 发表时间:
2014-01-01 - 期刊:
- 影响因子:
- 作者:
Daryl Powell;Jan Ola Strandhagen;Iris Tommelein;Glenn Ballard;Monica Rossi - 通讯作者:
Monica Rossi
Iris Tommelein的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Iris Tommelein', 18)}}的其他基金
Theory and Application of Takt-time Planning in Project-based Production
项目化生产中节拍计划的理论与应用
- 批准号:
1563511 - 财政年份:2016
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
Engineering of Project-based Production Systems for the Delivery of Engineered-to-order Products
用于交付按订单设计的产品的基于项目的生产系统工程
- 批准号:
0223576 - 财政年份:2002
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
Improving Design Fitness by Applying Tolerance Analysis, Methods Knowledge and Set-Based Design
通过应用公差分析、方法知识和基于集合的设计来提高设计适应性
- 批准号:
0116877 - 财政年份:2001
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
Coordinating Specialists: A Challenge to the Quality Transformation of Construction Project Organizations
协调专家:建设项目组织质量转型的挑战
- 批准号:
9811052 - 财政年份:1998
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
New Technologies to Re-Engineer Materials Handling on Construction Sites
重新设计建筑工地物料搬运的新技术
- 批准号:
9622308 - 财政年份:1996
- 资助金额:
$ 32.55万 - 项目类别:
Continuing Grant
Scheduling Construction Projects by Using Product Models and Learning from Cases
利用产品模型和案例学习调度施工项目
- 批准号:
9215935 - 财政年份:1992
- 资助金额:
$ 32.55万 - 项目类别:
Continuing Grant
Research Initiation Award: Modeling Time and Space for the Integration of Construction Planning, Scheduling, and Site Layout Design
研究启动奖:建设规划、调度和场地布局设计一体化的时空建模
- 批准号:
9010394 - 财政年份:1990
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
相似国自然基金
Data-driven Recommendation System Construction of an Online Medical Platform Based on the Fusion of Information
- 批准号:
- 批准年份:2024
- 资助金额:万元
- 项目类别:外国青年学者研究基金项目
Exploring the Intrinsic Mechanisms of CEO Turnover and Market Reaction: An Explanation Based on Information Asymmetry
- 批准号:W2433169
- 批准年份:2024
- 资助金额:万元
- 项目类别:外国学者研究基金项目
Incentive and governance schenism study of corporate green washing behavior in China: Based on an integiated view of econfiguration of environmental authority and decoupling logic
- 批准号:
- 批准年份:2024
- 资助金额:万元
- 项目类别:外国学者研究基金项目
A study on prototype flexible multifunctional graphene foam-based sensing grid (柔性多功能石墨烯泡沫传感网格原型研究)
- 批准号:
- 批准年份:2020
- 资助金额:20 万元
- 项目类别:
基于tag-based单细胞转录组测序解析造血干细胞发育的可变剪接
- 批准号:81900115
- 批准年份:2019
- 资助金额:21.0 万元
- 项目类别:青年科学基金项目
应用Agent-Based-Model研究围术期单剂量地塞米松对手术切口愈合的影响及机制
- 批准号:81771933
- 批准年份:2017
- 资助金额:50.0 万元
- 项目类别:面上项目
Reality-based Interaction用户界面模型和评估方法研究
- 批准号:61170182
- 批准年份:2011
- 资助金额:57.0 万元
- 项目类别:面上项目
Multistage,haplotype and functional tests-based FCAR 基因和IgA肾病相关关系研究
- 批准号:30771013
- 批准年份:2007
- 资助金额:30.0 万元
- 项目类别:面上项目
差异蛋白质组技术结合Array-based CGH 寻找骨肉瘤分子标志物
- 批准号:30470665
- 批准年份:2004
- 资助金额:8.0 万元
- 项目类别:面上项目
GaN-based稀磁半导体材料与自旋电子共振隧穿器件的研究
- 批准号:60376005
- 批准年份:2003
- 资助金额:20.0 万元
- 项目类别:面上项目
相似海外基金
Optimal utility-based design of oncology clinical development programmes
基于效用的肿瘤学临床开发项目的优化设计
- 批准号:
2734768 - 财政年份:2026
- 资助金额:
$ 32.55万 - 项目类别:
Studentship
RII Track-4:NSF: Design of zeolite-encapsulated metal phthalocyanines catalysts enabled by insights from synchrotron-based X-ray techniques
RII Track-4:NSF:通过基于同步加速器的 X 射线技术的见解实现沸石封装金属酞菁催化剂的设计
- 批准号:
2327267 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
DESIGN: Driving Culture Change in a Federation of Biological Societies via Cohort-Based Early-Career Leaders
设计:通过基于队列的早期职业领袖推动生物协会联盟的文化变革
- 批准号:
2334679 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
Rural Co-Design and Collaboration: Maximising Rural Community Assets to Reduce Place-Based Health Inequalities
农村共同设计与协作:最大化农村社区资产以减少基于地点的健康不平等
- 批准号:
AH/Z505559/1 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Research Grant
SHF: Small: Hardware-Software Co-design for Privacy Protection on Deep Learning-based Recommendation Systems
SHF:小型:基于深度学习的推荐系统的隐私保护软硬件协同设计
- 批准号:
2334628 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
Improving the Evidence-Based Design of Nature-based Solutions by Understanding the Trade-Offs and Synergies of Ecosystem Services in a Tropical Develo
通过了解热带开发中生态系统服务的权衡和协同作用,改进基于自然的解决方案的循证设计
- 批准号:
2908202 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Studentship
CAREER: Design Strategies for High-Performance Bismuth- and Lanthanide-Based Single-Molecule Magnets
职业:高性能铋基和镧系单分子磁体的设计策略
- 批准号:
2339595 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Continuing Grant
Two-way shape-memory polymer design based on periodic dynamic crosslinks inducing supramolecular nanostructures
基于周期性动态交联诱导超分子纳米结构的双向形状记忆聚合物设计
- 批准号:
2342272 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Standard Grant
CAREER: Integrating Graph Theory based Networks with Machine Learning for Enhanced Process Synthesis and Design
职业:将基于图论的网络与机器学习相集成以增强流程综合和设计
- 批准号:
2339588 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Continuing Grant
Next-generation system resilience-based design of infrastructure facilities
基于下一代系统弹性的基础设施设计
- 批准号:
DE240100207 - 财政年份:2024
- 资助金额:
$ 32.55万 - 项目类别:
Discovery Early Career Researcher Award