Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)

协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)

基本信息

项目摘要

Architecture, Engineering and Construction (AEC) Industry are continuously challenged to design and build unique, large and technically complex projects within the boundaries of budget, schedule, and social and environmental law constraints. These complexities lead to conflicts, claims and disputes during their life cycle. It is estimated that the industry spends $13-26 billion per year on conflicts and claims with total costs reaching as high as $50 billion when the additional expenses of legal disputes are added. These figures emphasize the need for an encompassing framework to manage conflicts, claims and disputes. In this context, the proposed research will focus on achieving the following six objectives: (1) understand causes behind conflict, claim and dispute occurrence in Projects based on the hypothesis that these conflicts occurs due to an interaction of key project characteristics; (2) determine a Project Conflict Profile and estimate the Expected Costs of these claims to represent the expected number and cost of conflict, claim and dispute during the project life cycle; (3) understand characteristics of the Dispute Avoidance and Resolution Techniques required to prevent/resolve conflicts based on the hypothesis that some types of conflicts occurring on a project may require different resolution approaches both in terms of effectiveness and economic feasibility; (4) determine effectiveness of chosen Dispute Avoidance and Resolution Techniques to resolve conflicts and minimize its impact, and Estimate the expected Value of Settlement for each type of conflicts in order to provide a predetermined plan to include specific techniques in the project resolution ladder; (5) evaluate cost/benefit tradeoffs of Dispute Avoidance and Resolution Techniques implementations for a given project, and determine a Dispute Avoidance and Resolution Techniques investment profile to justify the additional capital expenditures required for each of the chosen Dispute Avoidance and Resolution Techniques; and, (6) integrate results in a Conflict Management Plan to proactively monitor and control conflict occurrence and resolution in a project. To achieve these objectives, the proposed research methodology will consist of a formal cycle of data collection, formalization, testing, validation, and refinement. The project will focus on integrating research, industry and education at every stage. Through this integration, students will gain valuable experiences by having construction and industry partners involved in the process. Concurrently, practitioners will benefit by their involvement in the development and testing of the proposed framework. In order to reach educators, practitioners, researchers, and students who were not involved in the proposed activity, broad dissemination of the project results will be actively sought. Ultimately, in order to make the research truly successful, involvement from a diverse group of students and practitioners, in terms of economic, social, cultural, racial, and gender backgrounds, will be a priority.
建筑、工程和建筑(AEC)行业不断面临挑战,在预算、进度以及社会和环境法律限制的范围内设计和建造独特的、大型的和技术复杂的项目。这些复杂性导致在其生命周期中发生冲突、索赔和争端。据估计,该行业每年在冲突和索赔上的支出为130亿至260亿美元,如果加上法律纠纷的额外费用,总成本高达500亿美元。这些数字强调需要一个包罗万象的框架来管理冲突、索赔和争端。在此背景下,拟议的研究将集中于实现以下六个目标:(1)基于这些冲突是由于关键项目特征的相互作用而发生的假设,了解这些冲突、索赔和争议发生的原因;(2)确定项目冲突概况并估计这些索赔的预期成本,以代表项目生命周期中冲突、索赔和争议的预期数量和成本;(3)基于以下假设,了解预防/解决冲突所需的争议避免和解决技术的特点:基于这样的假设,在一个项目发生的某些类型的冲突可能需要不同的解决方法在有效性和经济可行性方面都是如此;(4)确定所选争议避免和解决技术对解决冲突并将其影响降至最低的有效性,并估计每种类型冲突的预期解决价值,以便提供将特定技术纳入项目解决阶梯的预定计划;(5)评估针对特定项目实施争议避免和解决技术的成本/收益权衡,并确定争议避免和解决技术投资概况,以证明每种所选争议避免和解决技术所需的额外资本支出的合理性;以及(6)将结果整合到冲突管理计划中,以主动监测和控制项目中冲突的发生和解决。为了实现这些目标,拟议的研究方法将包括数据收集、正规化、测试、验证和改进的正式周期。该项目将专注于在每个阶段整合研究、产业和教育。通过这种整合,学生将获得宝贵的经验,让建筑和行业合作伙伴参与到这个过程中来。与此同时,从业人员将受益于他们参与拟议框架的开发和测试。为了接触到教育工作者、实践者、研究人员和没有参与拟议活动的学生,将积极寻求广泛传播项目成果。最终,为了使研究真正成功,在经济、社会、文化、种族和性别背景方面,来自不同学生和从业者群体的参与将是优先事项。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Feniosky Pena-Mora其他文献

Optimal sizing and operations of shared energy storage systems in distribution networks: A bi-level programming approach
配电网中共享储能系统的最佳规模和运行:双层规划方法
  • DOI:
    10.1016/j.apenergy.2021.118170
  • 发表时间:
    2021-11
  • 期刊:
  • 影响因子:
    11.2
  • 作者:
    Mingtao Ma;Huijun Huang;Xiaoling Song;Feniosky Pena-Mora;Zhe Zhang;Jie Chen
  • 通讯作者:
    Jie Chen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
  • DOI:
    https://doi.org/10.1155/2021/6674980
  • 发表时间:
    2021
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Exploring the Impact of Information and Communication Technology on Team Social Capital and Construction Project Performance
探索信息和通信技术对团队社会资本和建设项目绩效的影响
  • DOI:
    10.1061/(asce)me.1943-5479.0000804
  • 发表时间:
    2020-09
  • 期刊:
  • 影响因子:
    7.4
  • 作者:
    Yao Huang;Qian Shi;Feniosky Pena-Mora;Yujie Lu;Charles Shen
  • 通讯作者:
    Charles Shen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
大数据背景下数据驱动的建设项目管理研究现状与挑战
  • DOI:
    10.1155/2021/6674980
  • 发表时间:
    2021-04
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Dynamic estimation of the fire service spatial accessibility for EV charging stations: Towards preventing severe fires and explosions
电动汽车充电站消防服务空间可达性的动态评估:预防严重火灾和爆炸
  • DOI:
    10.1016/j.psep.2024.12.115
  • 发表时间:
    2025-03-01
  • 期刊:
  • 影响因子:
    7.800
  • 作者:
    Yao Huang;Dingli Liu;Jiafu Tang;Shuai Niu;Fredric M. Bell;Feniosky Pena-Mora
  • 通讯作者:
    Feniosky Pena-Mora

Feniosky Pena-Mora的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Feniosky Pena-Mora', 18)}}的其他基金

Collaborative Research: Automatic Behavior Monitoring for In-depth Analysis of Construction Fatalities and Injuries
合作研究:自动行为监测,深入分析施工伤亡情况
  • 批准号:
    1200120
  • 财政年份:
    2012
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)
协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)
  • 批准号:
    1047534
  • 财政年份:
    2010
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    1037598
  • 财政年份:
    2010
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: SES 98-1320: Innovation Personnel and their Ecosystem: Career Choices and Trajectories of Scientists - Industry or Academia and Basic or Applied?
合作研究:SES 98-1320:创新人员及其生态系统:科学家的职业选择和轨迹 - 工业界还是学术界以及基础还是应用?
  • 批准号:
    1025226
  • 财政年份:
    2010
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models
使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化
  • 批准号:
    1063559
  • 财政年份:
    2010
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models
使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化
  • 批准号:
    0800500
  • 财政年份:
    2008
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    0709249
  • 财政年份:
    2007
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Workshop on Key Research and Education Issues in Construction Engineering and Management for the 2010 Decade
2010年十年建设工程与管理重点研究与教育问题研讨会
  • 批准号:
    0751406
  • 财政年份:
    2007
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
NSF CAREER Workshop at the 2005 Construction Research Congress (CRC); April 5-6, 2005; San Diego, CA
2005 年建筑研究大会 (CRC) 上的 NSF 职业研讨会;
  • 批准号:
    0521941
  • 财政年份:
    2005
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
PECASE: Collaborative Negotiation Methodology for Large-Scale Infrastructure Projects
PECASE:大型基础设施项目的协作谈判方法
  • 批准号:
    0513489
  • 财政年份:
    2005
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant

相似国自然基金

Research on Quantum Field Theory without a Lagrangian Description
  • 批准号:
    24ZR1403900
  • 批准年份:
    2024
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
Cell Research
  • 批准号:
    31224802
  • 批准年份:
    2012
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research
  • 批准号:
    31024804
  • 批准年份:
    2010
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research (细胞研究)
  • 批准号:
    30824808
  • 批准年份:
    2008
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Research on the Rapid Growth Mechanism of KDP Crystal
  • 批准号:
    10774081
  • 批准年份:
    2007
  • 资助金额:
    45.0 万元
  • 项目类别:
    面上项目

相似海外基金

Collaborative Research: Extreme Mechanics of the Human Brain via Integrated In Vivo and Ex Vivo Mechanical Experiments
合作研究:通过体内和离体综合力学实验研究人脑的极限力学
  • 批准号:
    2331294
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: An Integrated Framework for Learning-Enabled and Communication-Aware Hierarchical Distributed Optimization
协作研究:支持学习和通信感知的分层分布式优化的集成框架
  • 批准号:
    2331710
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: An Integrated Framework for Learning-Enabled and Communication-Aware Hierarchical Distributed Optimization
协作研究:支持学习和通信感知的分层分布式优化的集成框架
  • 批准号:
    2331711
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: EAGER: IMPRESS-U: Groundwater Resilience Assessment through iNtegrated Data Exploration for Ukraine (GRANDE-U)
合作研究:EAGER:IMPRESS-U:通过乌克兰综合数据探索进行地下水恢复力评估 (GRANDE-U)
  • 批准号:
    2409395
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: SWIFT-SAT: INtegrated Testbed Ensuring Resilient Active/Passive CoexisTence (INTERACT): End-to-End Learning-Based Interference Mitigation for Radiometers
合作研究:SWIFT-SAT:确保弹性主动/被动共存的集成测试台 (INTERACT):基于端到端学习的辐射计干扰缓解
  • 批准号:
    2332661
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: NSF-AoF: CIF: Small: AI-assisted Waveform and Beamforming Design for Integrated Sensing and Communication
合作研究:NSF-AoF:CIF:小型:用于集成传感和通信的人工智能辅助波形和波束成形设计
  • 批准号:
    2326622
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: Extreme Mechanics of the Human Brain via Integrated In Vivo and Ex Vivo Mechanical Experiments
合作研究:通过体内和离体综合力学实验研究人脑的极限力学
  • 批准号:
    2331295
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: Extreme Mechanics of the Human Brain via Integrated In Vivo and Ex Vivo Mechanical Experiments
合作研究:通过体内和离体综合力学实验研究人脑的极限力学
  • 批准号:
    2331296
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: SWIFT-SAT: INtegrated Testbed Ensuring Resilient Active/Passive CoexisTence (INTERACT): End-to-End Learning-Based Interference Mitigation for Radiometers
合作研究:SWIFT-SAT:确保弹性主动/被动共存的集成测试台 (INTERACT):基于端到端学习的辐射计干扰缓解
  • 批准号:
    2332662
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Materials-Manufacturing-Controls Framework for Efficient and Resilient Manufacturing Systems
协作研究:高效、弹性制造系统的集成材料制造控制框架
  • 批准号:
    2346650
  • 财政年份:
    2024
  • 资助金额:
    $ 13.4万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了