Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models

使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化

基本信息

  • 批准号:
    1063559
  • 负责人:
  • 金额:
    $ 31.27万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2010
  • 资助国家:
    美国
  • 起止时间:
    2010-04-29 至 2012-07-31
  • 项目状态:
    已结题

项目摘要

Systematic progress monitoring through rigorous identification, processing, and visualization of progress discrepancies between planned and actual performances, is a necessity for successful project management. It provides an early warning to project managers and allows them to diagnose performance problems and to take corrective actions in a timely manner to reduce the impacts of progress discrepancies. However, systematic implementation of progress monitoring has significant challenges because: 1) Current practice is time-consuming since it needs extensive data extraction; 2) Quality of the manually collected data maybe low and subjective; 3) Existing methods are also non-systematic; 4) Reports can be visually complex and thus not effectively represent multivariable progress information (i.e., schedule, cost, and performance) in a holistic manner nor intuitively reflect information pertaining to spatial aspects of the construction progress and their associated complexities; 5) Furthermore, current reporting methods increase the time required to describe and explain progress situation in coordination meetings and in turn could delay decision making. Thus, with current mechanism, it may be not be easy to understand the progress situation clearly and quickly. The proposed research will therefore focus on addressing these challenges through an interactive visualization of construction progress monitoring using 4 Dimensional Augmented Reality (D4AR) models. In the research, progress deviations (e.g., schedule, cost and performance) would be visualized through superimposition of planned models onto site photographs using different visualization techniques such as traffic light and weather metaphors, fish eye, and x-ray. Within the proposed framework, a project manager would be able to: 1) use the planned model as a baseline for progress monitoring; 2) collect progress data from site photographs during construction; 3) automatically analyze images and quantify built components; 4) automatically measure discrepancies between planned and built progress; and 5) visually represent progress deviations through superimposition of planned models with on-site photographs combining interactive visual imageries. In such an environment, project manager would be able to walk through or browse through a rich visual dataset of augmented progress photographs , analyze progress, make control decisions and effectively communicate with project participants. To achieve these objectives, the proposed research methodology will consist of a formal cycle of data collection, formalization, testing, validation, and refinement. This will involve integrating research, education and practice at every stage of the project. Through this integration, students will gain valuable experiences by having industry partners involved in the process. In order to reach educators, practitioners, researchers, and students who were not involved in the proposed activity, broad dissemination of the project results will be actively sought. Ultimately, in order to make the research truly successful, involvement from a diverse group of students and practitioners, in terms of economic, social, cultural, racial, and gender backgrounds, will be a priority. This diversity will provide the research project insights from different point of views, providing new perspectives for all involved.
通过严格识别、处理和可视化计划与实际绩效之间的进度差异来进行系统的进度监控,是成功的项目管理的必要条件。它向项目经理提供早期警告,使他们能够诊断业绩问题并及时采取纠正行动,以减少进度差异的影响。然而,进度监测的系统化实施具有重大的挑战,因为:1)当前的做法是耗时的,因为它需要广泛的数据提取;2)人工收集的数据的质量可能低且主观;3)现有的方法也是非系统化的;4)报告可能在视觉上很复杂,因此不能以整体的方式有效地表示多变量进度信息(即进度、成本和性能),也不能直观地反映与施工进度及其相关复杂性相关的空间方面的信息;5)此外,当前的报告方法增加了在协调会议上描述和解释进度情况所需的时间,进而可能延误决策。因此,在目前的机制下,可能不容易清楚和迅速地了解进展情况。因此,拟议的研究将侧重于通过使用4维增强现实(D4AR)模型对施工进度监测进行交互式可视化来应对这些挑战。在研究中,进度偏差(例如,进度、成本和性能)将通过使用不同的可视化技术(如红绿灯和天气隐喻、鱼眼和X光)将计划的模型叠加到现场照片上来可视化。在拟议的框架内,项目经理将能够:1)将规划的模型用作进度监测的基线;2)在施工期间从现场照片收集进度数据;3)自动分析图像并量化建造的部件;4)自动测量计划和建造的进度之间的差异;5)通过将规划的模型与现场照片叠加并结合交互式视觉图像,直观地表示进度偏差。在这样的环境中,项目经理将能够浏览或浏览增强的进度照片的丰富可视数据集,分析进度,做出控制决策,并与项目参与者进行有效的沟通。为了实现这些目标,拟议的研究方法将包括数据收集、正规化、测试、验证和改进的正式周期。这将涉及在项目的每个阶段整合研究、教育和实践。通过这种整合,通过让行业合作伙伴参与这一过程,学生将获得宝贵的经验。为了接触到教育工作者、实践者、研究人员和没有参与拟议活动的学生,将积极寻求广泛传播项目成果。最终,为了使研究真正成功,在经济、社会、文化、种族和性别背景方面,来自不同学生和从业者群体的参与将是优先事项。这种多样性将从不同的角度为研究项目提供见解,为参与的各方提供新的视角。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Feniosky Pena-Mora其他文献

Optimal sizing and operations of shared energy storage systems in distribution networks: A bi-level programming approach
配电网中共享储能系统的最佳规模和运行:双层规划方法
  • DOI:
    10.1016/j.apenergy.2021.118170
  • 发表时间:
    2021-11
  • 期刊:
  • 影响因子:
    11.2
  • 作者:
    Mingtao Ma;Huijun Huang;Xiaoling Song;Feniosky Pena-Mora;Zhe Zhang;Jie Chen
  • 通讯作者:
    Jie Chen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
  • DOI:
    https://doi.org/10.1155/2021/6674980
  • 发表时间:
    2021
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Exploring the Impact of Information and Communication Technology on Team Social Capital and Construction Project Performance
探索信息和通信技术对团队社会资本和建设项目绩效的影响
  • DOI:
    10.1061/(asce)me.1943-5479.0000804
  • 发表时间:
    2020-09
  • 期刊:
  • 影响因子:
    7.4
  • 作者:
    Yao Huang;Qian Shi;Feniosky Pena-Mora;Yujie Lu;Charles Shen
  • 通讯作者:
    Charles Shen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
大数据背景下数据驱动的建设项目管理研究现状与挑战
  • DOI:
    10.1155/2021/6674980
  • 发表时间:
    2021-04
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Dynamic estimation of the fire service spatial accessibility for EV charging stations: Towards preventing severe fires and explosions
电动汽车充电站消防服务空间可达性的动态评估:预防严重火灾和爆炸
  • DOI:
    10.1016/j.psep.2024.12.115
  • 发表时间:
    2025-03-01
  • 期刊:
  • 影响因子:
    7.800
  • 作者:
    Yao Huang;Dingli Liu;Jiafu Tang;Shuai Niu;Fredric M. Bell;Feniosky Pena-Mora
  • 通讯作者:
    Feniosky Pena-Mora

Feniosky Pena-Mora的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Feniosky Pena-Mora', 18)}}的其他基金

Collaborative Research: Automatic Behavior Monitoring for In-depth Analysis of Construction Fatalities and Injuries
合作研究:自动行为监测,深入分析施工伤亡情况
  • 批准号:
    1200120
  • 财政年份:
    2012
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)
协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)
  • 批准号:
    1047534
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    1037598
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: SES 98-1320: Innovation Personnel and their Ecosystem: Career Choices and Trajectories of Scientists - Industry or Academia and Basic or Applied?
合作研究:SES 98-1320:创新人员及其生态系统:科学家的职业选择和轨迹 - 工业界还是学术界以及基础还是应用?
  • 批准号:
    1025226
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models
使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化
  • 批准号:
    0800500
  • 财政年份:
    2008
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    0709249
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)
协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)
  • 批准号:
    0700415
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Workshop on Key Research and Education Issues in Construction Engineering and Management for the 2010 Decade
2010年十年建设工程与管理重点研究与教育问题研讨会
  • 批准号:
    0751406
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
NSF CAREER Workshop at the 2005 Construction Research Congress (CRC); April 5-6, 2005; San Diego, CA
2005 年建筑研究大会 (CRC) 上的 NSF 职业研讨会;
  • 批准号:
    0521941
  • 财政年份:
    2005
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
PECASE: Collaborative Negotiation Methodology for Large-Scale Infrastructure Projects
PECASE:大型基础设施项目的协作谈判方法
  • 批准号:
    0513489
  • 财政年份:
    2005
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant

相似海外基金

Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y003020/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y001168/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y001710/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Collaborative Research: Integrating Optimal Function and Compliant Mechanisms for Ubiquitous Lower-Limb Powered Prostheses
合作研究:将优化功能和合规机制整合到无处不在的下肢动力假肢中
  • 批准号:
    2344765
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
SBIR Phase I: Development of a SERS-based diagnostic platform for multiplexing ubiquitous inflammatory markers in cancer.
SBIR 第一阶段:开发基于 SERS 的诊断平台,用于多重癌症中普遍存在的炎症标记物。
  • 批准号:
    2348543
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
NSF-SNSF: ULTRA: Ubiquitous Large InTelligent ArRAys
NSF-SNSF:ULTRA:无处不在的大型智能阵列
  • 批准号:
    2403511
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CAREER: Ubiquitous Earable Sensing Using Low-Cost Earphones
职业:使用低成本耳机的无处不在的耳戴式传感
  • 批准号:
    2337537
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Continuing Grant
Collaborative Research: Integrating Optimal Function and Compliant Mechanisms for Ubiquitous Lower-Limb Powered Prostheses
合作研究:将优化功能和合规机制整合到无处不在的下肢动力假肢中
  • 批准号:
    2344766
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
GLYCOprotein N-glycosylation from non-life to eukaryotes: a Doctoral Network to expand the knowledge on a ubiquitous posttranslational modification
从非生命到真核生物的糖蛋白 N-糖基化:扩展普遍存在的翻译后修饰知识的博士网络
  • 批准号:
    EP/Y032527/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Ubiquitous Optical Healthcare Technologies (ubOHT) Programme Grant
无处不在的光学医疗保健技术 (ubOHT) 计划拨款
  • 批准号:
    EP/X037770/1
  • 财政年份:
    2023
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了