Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models

使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化

基本信息

  • 批准号:
    1063559
  • 负责人:
  • 金额:
    $ 31.27万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2010
  • 资助国家:
    美国
  • 起止时间:
    2010-04-29 至 2012-07-31
  • 项目状态:
    已结题

项目摘要

Systematic progress monitoring through rigorous identification, processing, and visualization of progress discrepancies between planned and actual performances, is a necessity for successful project management. It provides an early warning to project managers and allows them to diagnose performance problems and to take corrective actions in a timely manner to reduce the impacts of progress discrepancies. However, systematic implementation of progress monitoring has significant challenges because: 1) Current practice is time-consuming since it needs extensive data extraction; 2) Quality of the manually collected data maybe low and subjective; 3) Existing methods are also non-systematic; 4) Reports can be visually complex and thus not effectively represent multivariable progress information (i.e., schedule, cost, and performance) in a holistic manner nor intuitively reflect information pertaining to spatial aspects of the construction progress and their associated complexities; 5) Furthermore, current reporting methods increase the time required to describe and explain progress situation in coordination meetings and in turn could delay decision making. Thus, with current mechanism, it may be not be easy to understand the progress situation clearly and quickly. The proposed research will therefore focus on addressing these challenges through an interactive visualization of construction progress monitoring using 4 Dimensional Augmented Reality (D4AR) models. In the research, progress deviations (e.g., schedule, cost and performance) would be visualized through superimposition of planned models onto site photographs using different visualization techniques such as traffic light and weather metaphors, fish eye, and x-ray. Within the proposed framework, a project manager would be able to: 1) use the planned model as a baseline for progress monitoring; 2) collect progress data from site photographs during construction; 3) automatically analyze images and quantify built components; 4) automatically measure discrepancies between planned and built progress; and 5) visually represent progress deviations through superimposition of planned models with on-site photographs combining interactive visual imageries. In such an environment, project manager would be able to walk through or browse through a rich visual dataset of augmented progress photographs , analyze progress, make control decisions and effectively communicate with project participants. To achieve these objectives, the proposed research methodology will consist of a formal cycle of data collection, formalization, testing, validation, and refinement. This will involve integrating research, education and practice at every stage of the project. Through this integration, students will gain valuable experiences by having industry partners involved in the process. In order to reach educators, practitioners, researchers, and students who were not involved in the proposed activity, broad dissemination of the project results will be actively sought. Ultimately, in order to make the research truly successful, involvement from a diverse group of students and practitioners, in terms of economic, social, cultural, racial, and gender backgrounds, will be a priority. This diversity will provide the research project insights from different point of views, providing new perspectives for all involved.
通过严格识别、处理和可视化计划和实际绩效之间的进度差异,进行系统的进度监控,是成功项目管理的必要条件。它向项目管理人员提供预警,使他们能够诊断业绩问题,并及时采取纠正行动,以减少进度差异的影响。然而,进度监测的系统实现具有重大挑战,因为:1)当前实践是耗时的,因为它需要大量的数据提取; 2)手动收集的数据的质量可能较低且主观; 3)现有方法也是非系统的; 4)报告在视觉上可能是复杂的,因此不能有效地表示多变量进度信息(即,5)此外,目前的报告方法增加了在协调会议上描述和解释进展情况所需的时间,从而可能延误决策。因此,以目前的机制,可能不容易清楚和迅速地了解进展情况。因此,拟议的研究将集中在通过使用四维增强现实(D4 AR)模型的施工进度监测的交互式可视化来应对这些挑战。在研究中,进展偏差(例如,时间表、成本和性能)将通过使用不同的可视化技术(如交通灯和天气比喻、鱼眼和x光)将计划模型叠加到现场照片上来可视化。在拟议的框架内,项目经理将能够:1)使用计划模型作为进度监测的基线; 2)在施工期间从现场照片中收集进度数据; 3)自动分析图像并量化已建成的组件; 4)自动测量计划进度和已建成进度之间的差异;以及5)通过将计划模型与结合交互式视觉图像的现场照片叠加来视觉地表示进度偏差。在这样的环境中,项目经理将能够浏览或浏览由增强的进度照片组成的丰富的视觉数据集,分析进度,做出控制决策,并与项目参与者进行有效的沟通。为了实现这些目标,拟议的研究方法将包括一个正式的周期的数据收集,正规化,测试,验证和完善。这将涉及在项目的每个阶段整合研究,教育和实践。通过这种整合,学生将通过让行业合作伙伴参与这一过程来获得宝贵的经验。为了接触到没有参与拟议活动的教育工作者、从业人员、研究人员和学生,将积极寻求广泛传播项目成果。最终,为了使研究真正成功,从不同群体的学生和从业者的参与,在经济,社会,文化,种族和性别背景方面,将是一个优先事项。这种多样性将从不同的角度为研究项目提供见解,为所有参与者提供新的视角。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Feniosky Pena-Mora其他文献

Optimal sizing and operations of shared energy storage systems in distribution networks: A bi-level programming approach
配电网中共享储能系统的最佳规模和运行:双层规划方法
  • DOI:
    10.1016/j.apenergy.2021.118170
  • 发表时间:
    2021-11
  • 期刊:
  • 影响因子:
    11.2
  • 作者:
    Mingtao Ma;Huijun Huang;Xiaoling Song;Feniosky Pena-Mora;Zhe Zhang;Jie Chen
  • 通讯作者:
    Jie Chen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
  • DOI:
    https://doi.org/10.1155/2021/6674980
  • 发表时间:
    2021
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Exploring the Impact of Information and Communication Technology on Team Social Capital and Construction Project Performance
探索信息和通信技术对团队社会资本和建设项目绩效的影响
  • DOI:
    10.1061/(asce)me.1943-5479.0000804
  • 发表时间:
    2020-09
  • 期刊:
  • 影响因子:
    7.4
  • 作者:
    Yao Huang;Qian Shi;Feniosky Pena-Mora;Yujie Lu;Charles Shen
  • 通讯作者:
    Charles Shen
Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context
大数据背景下数据驱动的建设项目管理研究现状与挑战
  • DOI:
    10.1155/2021/6674980
  • 发表时间:
    2021-04
  • 期刊:
  • 影响因子:
    1.8
  • 作者:
    Yao Huang;Qian Shi;Jian Zuo;Feniosky Pena-Mora;Jindao Chen
  • 通讯作者:
    Jindao Chen
Dynamic estimation of the fire service spatial accessibility for EV charging stations: Towards preventing severe fires and explosions
电动汽车充电站消防服务空间可达性的动态评估:预防严重火灾和爆炸
  • DOI:
    10.1016/j.psep.2024.12.115
  • 发表时间:
    2025-03-01
  • 期刊:
  • 影响因子:
    7.800
  • 作者:
    Yao Huang;Dingli Liu;Jiafu Tang;Shuai Niu;Fredric M. Bell;Feniosky Pena-Mora
  • 通讯作者:
    Feniosky Pena-Mora

Feniosky Pena-Mora的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Feniosky Pena-Mora', 18)}}的其他基金

Collaborative Research: Automatic Behavior Monitoring for In-depth Analysis of Construction Fatalities and Injuries
合作研究:自动行为监测,深入分析施工伤亡情况
  • 批准号:
    1200120
  • 财政年份:
    2012
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)
协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)
  • 批准号:
    1047534
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    1037598
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: SES 98-1320: Innovation Personnel and their Ecosystem: Career Choices and Trajectories of Scientists - Industry or Academia and Basic or Applied?
合作研究:SES 98-1320:创新人员及其生态系统:科学家的职业选择和轨迹 - 工业界还是学术界以及基础还是应用?
  • 批准号:
    1025226
  • 财政年份:
    2010
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Interactive Ubiquitous Visualization of Construction Progress Monitoring with D4AR (4 Dimensional Augmented Reality) Models
使用 D4AR(4 维增强现实)模型实现施工进度监控的交互式无处不在的可视化
  • 批准号:
    0800500
  • 财政年份:
    2008
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CRI: IAD - A Pressing Need for Observation, Facilitation and Computer Support of Group Interactions for Advancing United States National Priorities--Homeland Security and Economic
CRI:IAD - 迫切需要对群体互动进行观察、便利和计算机支持,以推进美国国家优先事项——国土安全和经济
  • 批准号:
    0709249
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Conflict, Claim, and Dispute Avoidance, Mitigation and Resolution Methodology for Large-Scale Design and Construction Projects (C2D)
协作研究:大型设计和施工项目的综合冲突、索赔和争议避免、缓解和解决方法(C2D)
  • 批准号:
    0700415
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
Workshop on Key Research and Education Issues in Construction Engineering and Management for the 2010 Decade
2010年十年建设工程与管理重点研究与教育问题研讨会
  • 批准号:
    0751406
  • 财政年份:
    2007
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
NSF CAREER Workshop at the 2005 Construction Research Congress (CRC); April 5-6, 2005; San Diego, CA
2005 年建筑研究大会 (CRC) 上的 NSF 职业研讨会;
  • 批准号:
    0521941
  • 财政年份:
    2005
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
PECASE: Collaborative Negotiation Methodology for Large-Scale Infrastructure Projects
PECASE:大型基础设施项目的协作谈判方法
  • 批准号:
    0513489
  • 财政年份:
    2005
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant

相似海外基金

Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y003020/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y001168/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Catalytic Microwave Process for Upgrading of Pyrolysis Liquids from Ubiquitous Plastic Wastes
催化微波工艺对无处不在的塑料废物中的热解液进行升级
  • 批准号:
    EP/Y001710/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Collaborative Research: Integrating Optimal Function and Compliant Mechanisms for Ubiquitous Lower-Limb Powered Prostheses
合作研究:将优化功能和合规机制整合到无处不在的下肢动力假肢中
  • 批准号:
    2344765
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
SBIR Phase I: Development of a SERS-based diagnostic platform for multiplexing ubiquitous inflammatory markers in cancer.
SBIR 第一阶段:开发基于 SERS 的诊断平台,用于多重癌症中普遍存在的炎症标记物。
  • 批准号:
    2348543
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
NSF-SNSF: ULTRA: Ubiquitous Large InTelligent ArRAys
NSF-SNSF:ULTRA:无处不在的大型智能阵列
  • 批准号:
    2403511
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
CAREER: Ubiquitous Earable Sensing Using Low-Cost Earphones
职业:使用低成本耳机的无处不在的耳戴式传感
  • 批准号:
    2337537
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Continuing Grant
Collaborative Research: Integrating Optimal Function and Compliant Mechanisms for Ubiquitous Lower-Limb Powered Prostheses
合作研究:将优化功能和合规机制整合到无处不在的下肢动力假肢中
  • 批准号:
    2344766
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Standard Grant
GLYCOprotein N-glycosylation from non-life to eukaryotes: a Doctoral Network to expand the knowledge on a ubiquitous posttranslational modification
从非生命到真核生物的糖蛋白 N-糖基化:扩展普遍存在的翻译后修饰知识的博士网络
  • 批准号:
    EP/Y032527/1
  • 财政年份:
    2024
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
Ubiquitous Optical Healthcare Technologies (ubOHT) Programme Grant
无处不在的光学医疗保健技术 (ubOHT) 计划拨款
  • 批准号:
    EP/X037770/1
  • 财政年份:
    2023
  • 资助金额:
    $ 31.27万
  • 项目类别:
    Research Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了