Practicable Scheduling Algorithm to Meet Due Times

Practicable Scheduling Algorithm to Meet Due Times
满足到期时间的实用调度算法
批准号:
08680467
负责人:
OHTA Hiroshi
金额:
$1.34万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
1996
资助国家:
日本
项目状态:
已结题
起止时间:
1996 至 1997

项目摘要

项目成果

OHTA Hiroshi的其他基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This research developed the practicable scheduling algorithms to meet due times. The basic assumption in the scheduling is that every job should be completed before or just on the due time when the customer requires it and leave the shop simultaneously on the due time. No jobs are permitted to be tardy, and if a job is completed earlier than its due time, then the shop holds the job and incurs the holding cost for earliness. The results obtained in this research are summarized as follows :1. The single machine scheduling subject to no tardy jobs and time zero feasibility was considered. A heuristic algorithm with reduction in processing time was developed to determine a feasible schedule approximately to minimize the sum of the holding cost and the reduction cost for crash production.2. The single machine scheduling with ready and due times constraints on jobs, shutdown constraints on the machine and sequence dependent setup times among jobs. The shutdown is a disruptive event such as holiday, breaks or machine maintenance, and has a prespecified period when the machine will be interrupted. An optimization algorithm based on the branch-and-bound method was developed to minimize the maximum tardiness. Furthermore, the post-processing algorithm was developed so as to ****ce the maximum tardiness, which manipulates the starting time of the shutdown period.3. The single machine scheduling with due times constrains, time zero feasibility and shutdown constraints was considered. A heuristic algorithm with reduction in shutdown times was developed approximately to minimize the sum of the holding cost and the reduction cost in shutdown times.4. The single machine scheduling with variable processing times and with ready and due times constraints was considered. A heuristic algorithm was developed to obtain a schedule to meet due times involving the processing time determination so as to minimize approximately the sum of the holding cost and the production cost for every job.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
浅野 誠,太田 宏: "納期厳守不能の場合の生産時間短縮を考慮した単一機械スケジューリング" 日本経営工学会論文誌. 47-5. 292-297 (1996)
Makoto Asano、Hiroshi Ota:“在无法准时交货的情况下考虑缩短生产时间的单机调度”,日本管理工程师学会汇刊 47-297 (1996)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
浅野 誠,太田 宏: "異なる到着時間と納期の下で稼働停止時間帯と段取り時間を考慮したスケジューリング" 日本経営工学会論文誌. 47-6. 335-343 (1997)
Makoto Asano、Hiroshi Ota:“考虑不同到达时间和交货日期下的停机时间和准备时间的调度”,日本管理工程师学会汇刊 47-6 (1997)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
"Scheduling with Ready Times, Due Times, Shutdowns and Setup Times (in Japanese)" Journal of Japan Industrial Management Association. Vol.47-6. 335-343 (1997)
“安排就绪时间、到期时间、停机和准备时间(日语)”日本工业管理协会杂志。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
Establishment of novel technique using primordial germ cells induced from embryonic stem cells
  • 批准号:
    24680045
  • 项目类别:
    Grant-in-Aid for Young Scientists (A)
  • 资助金额:
    $16.72万
  • 财政年份:
    2012
  • 负责人:
    OHTA Hiroshi
  • 依托单位:
Floer theory, mirror symmetry conjecture and applications to symplectic geometry
  • 批准号:
    23340015
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
  • 资助金额:
    $10.32万
  • 财政年份:
    2011
  • 负责人:
    OHTA Hiroshi
  • 依托单位:
Study on the pathogenesis of canine inflammatory bowel disease: investigation of the intestinal mucosal barrier function and intestinal mucosal cytokine expression.
  • 批准号:
    23780315
  • 项目类别:
    Grant-in-Aid for Young Scientists (B)
  • 资助金额:
    $1.58万
  • 财政年份:
    2011
  • 负责人:
    OHTA Hiroshi
  • 依托单位:
'Tragedy of the Commons'Revisited: a FreeRising Mechanism via Altruistic Utility and Capital Accumulation
  • 批准号:
    22530229
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
  • 资助金额:
    $1.25万
  • 财政年份:
    2010
  • 负责人:
    OHTA Hiroshi
  • 依托单位: