课题基金 / 基金详情

DATA NETWORK IMPROVEMENT PROJECT - P51 RR000165-49-S3

DATA NETWORK IMPROVEMENT PROJECT - P51 RR000165-49-S3
数据网络改进项目 - P51 RR000165-49-S3
批准号:
8357531
负责人:
Stuart Zola
金额:
$4.12万
依托单位:
依托单位国家:
美国
项目类别:
财政年份:
2011
资助国家:
美国
项目状态:
已结题
起止时间:
2011-08-01 至 2012-04-30

项目摘要

项目成果

Stuart Zola的其他基金

相似基金

相关文献

中文摘要
翻译
该子项目是利用资源的众多研究子项目之一 由 NIH/NCRR 资助的中心拨款提供。子项目的主要支持 并且子项目的主要研究者可能是由其他来源提供的, 包括其他 NIH 来源。 子项目可能列出的总成本 代表子项目使用的中心基础设施的估计数量, NCRR 赠款不直接向子项目或子项目工作人员提供资金。 The YNPRC has improved the reliability, bandwidth and security of our network with funds from this administrative supplement. This timeline provides details as to how rapidly we have begun to fulfill the objective of a quality data network. February - Coordination for boring and installation of a fiber path for the Main Station is completed. Boring begins to install the conduit for fiber cables. March - Switching equipment is ordered. Boring and conduit installation continues and fiber cable installation begins at the Main Station. April - Boring, conduit and fiber cable installs at the Main Station is completed. 五月/六月 - 收到开关设备并进行安装配置。 July - Switching equipment is upgraded in the Main building. August - Switching equipment upgrade begins in the Neuroscience building. Coordination for boring and installation of a fiber path for the Field Station is completed.钻孔开始安装光缆导管。 September - Switching equipment upgrade is completed in the Neuroscience building.总站外楼交换设备升级完成。 October - Boring, conduit and fiber cable installs at the Field Station is completed.计划开始将神经科学大楼中的主机迁移到新网络。 November - Installation begins for NEMA enclosures and fiber cable terminations at the Field Station. Neuroscience building host migrations begin. Plans begin for the migration of hosts in the Main building to the new network
英文摘要
This subproject is one of many research subprojects utilizing the resources provided by a Center grant funded by NIH/NCRR. Primary support for the subproject and the subproject's principal investigator may have been provided by other sources, including other NIH sources. The Total Cost listed for the subproject likely represents the estimated amount of Center infrastructure utilized by the subproject, not direct funding provided by the NCRR grant to the subproject or subproject staff. The YNPRC has improved the reliability, bandwidth and security of our network with funds from this administrative supplement. This timeline provides details as to how rapidly we have begun to fulfill the objective of a quality data network. + February - Coordination for boring and installation of a fiber path for the Main Station is completed. Boring begins to install the conduit for fiber cables. + March - Switching equipment is ordered. Boring and conduit installation continues and fiber cable installation begins at the Main Station. + April - Boring, conduit and fiber cable installs at the Main Station is completed. + May/June - Switching equipment is received and configured for installation. + July - Switching equipment is upgraded in the Main building. + August - Switching equipment upgrade begins in the Neuroscience building. Coordination for boring and installation of a fiber path for the Field Station is completed. Boring begins to install conduit for the fiber cables. + September - Switching equipment upgrade is completed in the Neuroscience building. Switching equipment upgrades are completed in the Main Station outer buildings. + October - Boring, conduit and fiber cable installs at the Field Station is completed. Plans begin for the migration of hosts in the Neuroscience building to the new network. + November - Installation begins for NEMA enclosures and fiber cable terminations at the Field Station. Neuroscience building host migrations begin. Plans begin for the migration of hosts in the Main building to the new network
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
STROKE AND BRAIN IMAGING FACULTY RECRUITMENT - P51 RR000165-49-S2
  • 批准号:
    8357530
  • 项目类别:
  • 资助金额:
    $4.12万
  • 财政年份:
    2011
  • 负责人:
    Stuart Zola
  • 依托单位:
CONTE CENTER
  • 批准号:
    8357428
  • 项目类别:
  • 资助金额:
    $3.29万
  • 财政年份:
    2011
  • 负责人:
    Stuart Zola
  • 依托单位:
SENSITIVE MEMORY TESTS FOR DIFFERENTIATING MCI SUBGROUPS
  • 批准号:
    8357430
  • 项目类别:
  • 资助金额:
    $3.29万
  • 财政年份:
    2011
  • 负责人:
    Stuart Zola
  • 依托单位:
THE DEVELOPMENT OF A CENTER FOR THE SCIENTIFIC STUDY OF CHIMPANZEES
  • 批准号:
    8357392
  • 项目类别:
  • 资助金额:
    $4.12万
  • 财政年份:
    2011
  • 负责人:
    Stuart Zola
  • 依托单位:
国内基金
海外基金
Scalable Learning and Optimization: High-dimensional Models and Online Decision-Making Strategies for Big Data Analysis
Data-driven Recommendation System Construction of an Online Medical Platform Based on the Fusion of Information
Development of a Linear Stochastic Model for Wind Field Reconstruction from Limited Measurement Data
  • 批准号:
    --
  • 项目类别:
    --
  • 资助金额:
    40万元
  • 批准年份:
    2020
  • 负责人:
    Vikrant Gupta
  • 依托单位:
基于Linked Open Data的Web服务语义互操作关键技术
  • 批准号:
    61373035
  • 项目类别:
    面上项目
  • 资助金额:
    77.0万元
  • 批准年份:
    2013
  • 负责人:
    冯志勇
  • 依托单位: