Bargaining and Power in Ongoing Relationships

持续关系中的讨价还价和权力

基本信息

  • 批准号:
    9911075
  • 负责人:
  • 金额:
    $ 6.81万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2000
  • 资助国家:
    美国
  • 起止时间:
    2000-07-01 至 2002-06-30
  • 项目状态:
    已结题

项目摘要

Within the field of international relations, the subfields of security studies and international political economy remain largely isolated from each other. This project develops a more coherent and general way of looking at political bargaining in anarchy - be it over issues typically associated with security studies or international political economy (or domestic politics). To achieve this end, the investigator produces a series of papers that study the effects of relaxing key assumptions that currently define the state-of-the-art in the modeling of security studies.The limitations of the much recent formal work in international relations theory is that it generally models the exercise of power as a once-and-for-all decision. Formally, the games used in these analyses usually end as soon as any player attempts to exercise power by going to war or, more broadly, by imposing a settlement.A related, but heretofore unemphasized limitation is that many bargaining games in both economics and international relation's theory also end as soon as one of the players accepts an offer. Thus no bargainer can renege on an offer or an agreement even if it would like to, because the game tree does not allow for it. In a sense then, these games violate the assumption of anarchy in that they implicitly allow a bargainer to commit itself to honoring its offers.This research studies the effects of relaxing these limitations in two ways. First, the bargainers are able to renege on their offers. As it happens, this new assumption, which grows out of international relations theory, provides a natural answer to a central puzzle in modern bargaining theory. In the late 1980s, bargaining theorists expected that the presence of incomplete information would explain why there is delay in bargaining, i.e., why bargainers often take a long time to reach an agreement. But, these expectations proved incorrect in the standard models. Even with incomplete information, there was no delay. Surprisingly, delay does seem to be a direct consequence of incomplete information once the players can also renege.Second, this project relaxes the assumption that the use of power is a game-ending strategy. One facet of this problem models the exercise of power as a more explicit series of interacting decisions. The focus here is on how the expected outcomes of this process shapes the bargaining that occurs before the exercise of power begins.A second facet focuses on the fact that the exercise of power rarely eliminates actors. Strategic interaction often continues after the explicit exercise of power has ended. And, once the use of power is viewed in this way, a common strategic problem appears t underlie many problems in security affairs, international political economy, and domestic politics. This research characterizes this problem and analyzes the relation between bargaining and power in it.
在国际关系领域内,安全研究和国际政治经济学这两个子领域在很大程度上仍然相互孤立。 该项目开发了一种更连贯和更普遍的方式来看待无政府状态下的政治谈判-无论是通常与安全研究或国际政治经济(或国内政治)相关的问题。 为了实现这一目标,研究人员制作了一系列论文,研究放松关键假设的影响,这些假设目前定义了安全研究建模的最新技术水平。国际关系理论中最近正式工作的局限性在于,它通常将权力的行使建模为一劳永逸的决定。 从形式上讲,这些分析中使用的博弈通常在任何参与者试图通过战争或更广泛地说,通过强加和解来行使权力时结束。一个相关但迄今未被强调的局限性是,经济学和国际关系理论中的许多讨价还价博弈也在其中一个参与者接受提议时结束。 因此,即使讨价还价者愿意,也不能违背一项提议或协议,因为博弈树不允许这样做。从某种意义上说,这些博弈违反了无政府状态的假设,因为它们隐含地允许讨价还价者承诺履行其提议。本研究从两个方面研究了放松这些限制的影响。 首先,讨价还价者能够违背他们的提议。 碰巧的是,这一从国际关系理论中产生的新假设为现代讨价还价理论中的一个核心难题提供了一个自然的答案。 20世纪80年代末,讨价还价理论家预计,不完整信息的存在可以解释为什么讨价还价会出现延迟,即,为什么讨价还价者往往需要很长时间才能达成协议。 但是,这些期望在标准模型中被证明是不正确的。 即使信息不全,也没有耽搁。 令人惊讶的是,延迟似乎是一个不完整的信息一旦球员也可以食言的直接后果。第二,这个项目放宽了使用权力是一个游戏结束策略的假设。 这个问题的一个方面将权力的行使建模为一系列更明确的相互作用的决定。 这里的重点是这一过程的预期结果如何塑造在权力行使开始之前发生的讨价还价。第二个方面关注的事实是,权力的行使很少会消除行动者。 战略互动往往在权力的明确行使结束后继续进行。 而且,一旦以这种方式看待权力的使用,一个共同的战略问题就出现在安全事务、国际政治经济和国内政治的许多问题之下。 本研究对这一问题进行了描述,并分析了讨价还价与权力之间的关系。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Robert Powell其他文献

Tail risk network analysis of Asian banks
  • DOI:
    10.1016/j.gfj.2024.101017
  • 发表时间:
    2024-09-01
  • 期刊:
  • 影响因子:
  • 作者:
    Thach N. Pham;Robert Powell;Deepa Bannigidadmath
  • 通讯作者:
    Deepa Bannigidadmath
Examining the nervous system
  • DOI:
    10.1016/j.mpfou.2008.05.010
  • 发表时间:
    2008-08-01
  • 期刊:
  • 影响因子:
  • 作者:
    Robert Powell;Phil Smith
  • 通讯作者:
    Phil Smith
Nuclear Deterrence Theory: The Search for Credibility
核威慑理论:寻找可信度
  • DOI:
  • 发表时间:
    1990
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Robert Powell
  • 通讯作者:
    Robert Powell
Complexity classifications for the valued constraint satisfaction problem
有价值的约束满足问题的复杂性分类
  • DOI:
  • 发表时间:
    2016
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Robert Powell
  • 通讯作者:
    Robert Powell
Investigation of Thermo-Acoustic Excitations in a Rijke Tube Geometry
Rijke 管几何形状中热声激励的研究

Robert Powell的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Robert Powell', 18)}}的其他基金

What leads to better outcomes in informal STEM-based environmental education programs for youth?
是什么导致基于 STEM 的非正式青年环境教育计划取得更好的成果?
  • 批准号:
    1906610
  • 财政年份:
    2019
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Continuing Grant
Methods development for systematic investigation of factors driving outcomes in informal STEM environmental education programs
系统调查非正式 STEM 环境教育项目成果驱动因素的方法开发
  • 批准号:
    1612416
  • 财政年份:
    2016
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
Choosing Sides: The Dynamics of Coalitions
选择立场:联盟的动力
  • 批准号:
    1456516
  • 财政年份:
    2015
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
NSCC/SA: Fighting and Bargaining over Political Power in Weak States
NSCC/SA:弱国政治权力的斗争和讨价还价
  • 批准号:
    0904333
  • 财政年份:
    2009
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
REU Site: Natural History of a West Indian Herpetofauna
REU 网站:西印度爬行动物的自然历史
  • 批准号:
    0851610
  • 财政年份:
    2009
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
REU Site: Natural History of a West Indian Herpetofauna
REU 网站:西印度爬行动物的自然历史
  • 批准号:
    0242589
  • 财政年份:
    2004
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Continuing Grant
The Inefficient Use of Power: Costly Conflict with Complete Information
权力的低效使用:与完整信息的代价高昂的冲突
  • 批准号:
    0315037
  • 财政年份:
    2003
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
Research Experiences for Undergraduates: Natural History of a West Indian Herpetofauna
本科生研究经历:西印度两栖爬行动物的自然史
  • 批准号:
    9732257
  • 财政年份:
    1999
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
States and Strategies in Anarchy
无政府状态下的国家和策略
  • 批准号:
    9709316
  • 财政年份:
    1997
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
Bargaining in the Shadow of Power
权力阴影下的讨价还价
  • 批准号:
    9422278
  • 财政年份:
    1995
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant

相似国自然基金

基于切平面受限Power图的快速重新网格化方法
  • 批准号:
    62372152
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
多约束Power图快速计算算法研究
  • 批准号:
    61972128
  • 批准年份:
    2019
  • 资助金额:
    58.0 万元
  • 项目类别:
    面上项目
网格曲面上质心Power图的快速计算及应用
  • 批准号:
    61772016
  • 批准年份:
    2017
  • 资助金额:
    46.0 万元
  • 项目类别:
    面上项目
离散最优传输问题,闵可夫斯基问题和蒙奇-安培方程中的变分原理和Power图
  • 批准号:
    11371220
  • 批准年份:
    2013
  • 资助金额:
    50.0 万元
  • 项目类别:
    面上项目
云计算环境下数据中心的power capping关键问题研究
  • 批准号:
    61272460
  • 批准年份:
    2012
  • 资助金额:
    81.0 万元
  • 项目类别:
    面上项目
基于信道Time/Power度量指标的TOA测距误差模型及其应用研究
  • 批准号:
    61172049
  • 批准年份:
    2011
  • 资助金额:
    60.0 万元
  • 项目类别:
    面上项目
Power MEMS 微转子-轴承系统的非线性动力学研究
  • 批准号:
    10872031
  • 批准年份:
    2008
  • 资助金额:
    36.0 万元
  • 项目类别:
    面上项目
准气体动力循环超高能量密度Power MEMS的研究
  • 批准号:
    50575231
  • 批准年份:
    2005
  • 资助金额:
    28.0 万元
  • 项目类别:
    面上项目
冷热源Power MEMS应用基础研究
  • 批准号:
    50275135
  • 批准年份:
    2002
  • 资助金额:
    31.0 万元
  • 项目类别:
    面上项目

相似海外基金

Likelihood and impact of severe space weather events on the resilience of nuclear power and safeguards monitoring.
严重空间天气事件对核电和保障监督的恢复力的可能性和影响。
  • 批准号:
    2908918
  • 财政年份:
    2027
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Studentship
Scalable indoor power harvesters using halide perovskites
使用卤化物钙钛矿的可扩展室内能量收集器
  • 批准号:
    MR/Y011686/1
  • 财政年份:
    2025
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Fellowship
CAREER: Frequency-Constrained Energy Scheduling for Renewable-Dominated Low-Inertia Power Systems
职业:可再生能源为主的低惯量电力系统的频率约束能量调度
  • 批准号:
    2337598
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Continuing Grant
Planning: Artificial Intelligence Assisted High-Performance Parallel Computing for Power System Optimization
规划:人工智能辅助高性能并行计算电力系统优化
  • 批准号:
    2414141
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
Conference: Global Bioinformatics Education Summit 2024 — Energizing Communities to Power the Bioeconomy Workforce
会议:2024 年全球生物信息学教育峰会 — 激励社区为生物经济劳动力提供动力
  • 批准号:
    2421267
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
Collaborative Research: CyberTraining: Pilot: PowerCyber: Computational Training for Power Engineering Researchers
协作研究:Cyber​​Training:试点:PowerCyber​​:电力工程研究人员的计算培训
  • 批准号:
    2319895
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
SBIR Phase II: Thermally-optimized power amplifiers for next-generation telecommunication and radar
SBIR 第二阶段:用于下一代电信和雷达的热优化功率放大器
  • 批准号:
    2335504
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Cooperative Agreement
SBIR Phase II: Innovative Two-Phase Cooling with Micro Closed Loop Pulsating Heat Pipes for High Power Density Electronics
SBIR 第二阶段:用于高功率密度电子产品的创新两相冷却微闭环脉动热管
  • 批准号:
    2321862
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Cooperative Agreement
Robust Transient State Estimation for Three-Phase Power Systems
三相电力系统的鲁棒瞬态估计
  • 批准号:
    2330377
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Standard Grant
CAREER: Statistical Power Analysis and Optimal Sample Size Planning for Longitudinal Studies in STEM Education
职业:STEM 教育纵向研究的统计功效分析和最佳样本量规划
  • 批准号:
    2339353
  • 财政年份:
    2024
  • 资助金额:
    $ 6.81万
  • 项目类别:
    Continuing Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了