Development of an approach for the combined control of disassembly and postprocessing processes in plant dismantling
开发工厂拆除中拆卸和后处理过程的联合控制方法
基本信息
- 批准号:244566591
- 负责人:
- 金额:--
- 依托单位:
- 依托单位国家:德国
- 项目类别:Research Grants
- 财政年份:2013
- 资助国家:德国
- 起止时间:2012-12-31 至 2016-12-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
Dismantling closed industrial plants of huge sizes and complexity (e. g. nuclear power plants or oil refineries) is a big challenge concerning the planning and scheduling of the logistical processes. If a plant is dismantled and the components are postprocessed on-site, e. g. due to safety regulations demanding special controlled areas in nuclear facilities, often logistical deficits are resulting. If disassembly and postprocessing are not coupled close enough often massive fluctuations of the working systems workload are resulting. A long duration of the whole dismantling process, high inventories of work in progress and alternating short- and over-capacities are the result. This can decrease the economic efficiency of a dismantling project. An approach for a combined control of disassembly and postprocessing considering the specialties of plant dismantling does not exist yet. The objective of this research proposal is to develop an approach for a combined control of disassembly and postprocessing processes in the field of plant dismantling. The approach shall start disassembly activities for specific parts of the plant considering sequence dependent restrictions in such a manner that a constant workload of the postprocessing working stations is achieved. It is also aspired to minimize the buffer stock of work in progress between disassembly and postprocessing. Also knowledge shall be generated concerning the limitations of the achieved approach. The question shall be answered, if a shifting of workloads by controlling the disassembly sequence can improve logistical goals compared to an isolated control of disassembly and postprocessing.
拆除规模巨大和复杂的关闭的工业工厂(e)。G.核电厂或炼油厂)是一个巨大的挑战,涉及规划和调度的后勤过程。如果工厂被拆除,部件在现场进行后处理,e. G.由于安全条例要求在核设施内设立特别控制区,因此经常造成后勤方面的不足。如果拆卸和后处理耦合不够紧密,经常会导致工作系统工作负载的巨大波动。结果是整个拆除过程持续时间长,在建工程库存高,产能不足和过剩交替出现。这会降低拆除项目的经济效益。目前还没有一种针对设备拆卸特点的拆卸与后处理联合控制方法。本研究建议的目的是开发一种方法,在工厂拆卸领域的拆卸和后处理过程的联合控制。该方法应考虑顺序相关限制,以实现后处理工作站的恒定工作量的方式,开始工厂特定部件的拆卸活动。它还希望最大限度地减少拆卸和后处理之间的缓冲库存。此外,还应了解所采用方法的局限性。与单独控制拆卸和后处理相比,通过控制拆卸顺序转移工作量是否可以改善物流目标,这个问题应该得到回答。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Dr.-Ing. Georg Ullmann其他文献
Dr.-Ing. Georg Ullmann的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Dr.-Ing. Georg Ullmann', 18)}}的其他基金
Development of a forecasting model for the prediction of product sales using search engine query data
开发使用搜索引擎查询数据预测产品销售的预测模型
- 批准号:
280139258 - 财政年份:2015
- 资助金额:
-- - 项目类别:
Research Grants
Development of a causal model for efficient disassembly network design for XXL-products
开发 XXL 产品高效拆卸网络设计的因果模型
- 批准号:
271230719 - 财政年份:2015
- 资助金额:
-- - 项目类别:
Research Grants
Planning of dynamic layouts for the field assembly of XXL-products under competing floor space demands
在竞争的占地面积需求下规划 XXL 产品现场组装的动态布局
- 批准号:
251648490 - 财政年份:2014
- 资助金额:
-- - 项目类别:
Research Grants
相似国自然基金
量化 domain 的拓扑性质
- 批准号:11771310
- 批准年份:2017
- 资助金额:48.0 万元
- 项目类别:面上项目
基于Riemann-Hilbert方法的相关问题研究
- 批准号:11026205
- 批准年份:2010
- 资助金额:3.0 万元
- 项目类别:数学天元基金项目
EnSite array指导下对Stepwise approach无效的慢性房颤机制及消融径线设计的实验研究
- 批准号:81070152
- 批准年份:2010
- 资助金额:10.0 万元
- 项目类别:面上项目
MBR中溶解性微生物产物膜污染界面微距作用机制定量解析
- 批准号:50908133
- 批准年份:2009
- 资助金额:20.0 万元
- 项目类别:青年科学基金项目
新型低碳马氏体高强钢在不同低温下解理断裂物理模型的研究
- 批准号:50671047
- 批准年份:2006
- 资助金额:30.0 万元
- 项目类别:面上项目
基于生态位理论与方法优化沙区人工植物群落的研究
- 批准号:30470298
- 批准年份:2004
- 资助金额:15.0 万元
- 项目类别:面上项目
相似海外基金
Role of meningeal lymphatic vasculature in neuroimmune communication development
脑膜淋巴管系统在神经免疫通讯发育中的作用
- 批准号:
10566682 - 财政年份:2023
- 资助金额:
-- - 项目类别:
The Amyloidosis Forum: Advancing Drug Development in ATTR Amyloidosis in an Evolving Treatment Landscape.
淀粉样变性论坛:在不断发展的治疗格局中推进 ATTR 淀粉样变性的药物开发。
- 批准号:
10683562 - 财政年份:2023
- 资助金额:
-- - 项目类别:
Development of Solid Electrolytes Using a Combined in-Operando XPS-Theroetical Approach
使用组合的操作中 XPS 理论方法开发固体电解质
- 批准号:
2879009 - 财政年份:2023
- 资助金额:
-- - 项目类别:
Studentship
Novel therapeutics development and mechanisms of therapeutic resistance in gastrointestinal stromal tumor (GIST)
胃肠道间质瘤(GIST)的新疗法开发和耐药机制
- 批准号:
10932621 - 财政年份:2023
- 资助金额:
-- - 项目类别:
Protein engineering for the development of novel antimicrobial agents
用于开发新型抗菌剂的蛋白质工程
- 批准号:
10351839 - 财政年份:2022
- 资助金额:
-- - 项目类别:
Protein engineering for the development of novel antimicrobial agents
用于开发新型抗菌剂的蛋白质工程
- 批准号:
10669560 - 财政年份:2022
- 资助金额:
-- - 项目类别:
Cyclin C-CDK8/19 kinases in development and in cancer
发育和癌症中的细胞周期蛋白 C-CDK8/19 激酶
- 批准号:
10579308 - 财政年份:2022
- 资助金额:
-- - 项目类别:
Development of new therapeutic approaches for endometrial cancer
子宫内膜癌新治疗方法的开发
- 批准号:
10522572 - 财政年份:2022
- 资助金额:
-- - 项目类别:
Development of new therapeutic approaches for endometrial cancer
子宫内膜癌新治疗方法的开发
- 批准号:
10688243 - 财政年份:2022
- 资助金额:
-- - 项目类别:
Development of a Rapid Antibiotic Susceptibility Test Capable of Detecting Heteroresistance
开发能够检测异抗性的快速抗生素敏感性测试
- 批准号:
10439871 - 财政年份:2020
- 资助金额:
-- - 项目类别:














{{item.name}}会员