课题基金 / 基金详情

Risk Assessment and Mitigation of Blast Damage to Structural Systems

Risk Assessment and Mitigation of Blast Damage to Structural Systems
结构系统爆炸损坏的风险评估和减轻
批准号:
DP0556913
负责人:
Prof Mark Stewart
金额:
$14.42万
依托单位:
依托单位国家:
澳大利亚
项目类别:
Discovery Projects
财政年份:
2005
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2005-01-01 至 2008-12-30

项目摘要

项目成果

Prof Mark Stewart的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The cost of providing blast-resistant protective measures to potentially hundreds or thousands of existing buildings is immense and beyond the resources of government and society. The decision-making framework proposed herein provides a means to allocate funds to those buildings shown to have high risk of damage in the event of bomb blast. This will enable existing risks to be quantified and compared in a rational and consistent manner, thus ensuring that risk mitigation is maximised given expenditure of limited resources. Public safety will be governed by the extent and effectiveness of building protective measures. Lives will be saved, likelihood and extent of injury reduced and social and economic disruption minimised.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Stochastic Assessment of Terrorist Blast and Fragmentation Casualty Risks
  • 批准号:
    DP210101487
  • 项目类别:
    Discovery Projects
  • 资助金额:
    $50.46万
  • 财政年份:
    2021
  • 负责人:
    Prof Mark Stewart
  • 依托单位:
Discovery Projects - Grant ID: DP210101487
  • 批准号:
    ARC : DP210101487
  • 项目类别:
    Discovery Projects
  • 资助金额:
    $70.36万
  • 财政年份:
    2021
  • 负责人:
    Prof Mark Stewart
  • 依托单位:
Stochastic hazard assessment of unreinforced masonry wall systems
  • 批准号:
    DP180102334
  • 项目类别:
    Discovery Projects
  • 资助金额:
    $33.19万
  • 财政年份:
    2018
  • 负责人:
    Prof Mark Stewart
  • 依托单位:
Risk-Based Decision-Making for Terrorism and Infrastructure Security
  • 批准号:
    DP160100855
  • 项目类别:
    Discovery Projects
  • 资助金额:
    $55.06万
  • 财政年份:
    2016
  • 负责人:
    Prof Mark Stewart
  • 依托单位:
国内基金
海外基金
基于重要农地保护LESA(Land Evaluation and Site Assessment)体系思想的高标准基本农田建设研究
  • 批准号:
    41340011
  • 项目类别:
    专项基金项目
  • 资助金额:
    20.0万元
  • 批准年份:
    2013
  • 负责人:
    钱凤魁
  • 依托单位: