课题基金 / 基金详情

Collaborative Research: Vertical Movement in the Southern Alps Constrained by GPS and Absolute Gravity

Collaborative Research: Vertical Movement in the Southern Alps Constrained by GPS and Absolute Gravity
合作研究:GPS和绝对重力约束下的南阿尔卑斯山垂直运动
批准号:
9902981
负责人:
Roger Bilham
金额:
$6.4万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1999
资助国家:
美国
项目状态:
已结题
起止时间:
1999-10-01 至 2001-03-31

项目摘要

项目成果

Roger Bilham的其他基金

相似基金

相关文献

中文摘要
翻译
9902981Bilham这是一个合作项目,使用GPS大地测量和绝对重力测量新西兰南阿尔卑斯山的垂直运动分量。调查人员将在南阿尔卑斯山的一个剖面上安装七个连续或半连续的GPS仪器,那里的距离特别大,垂直运动速度也应该很高。他们将在10个地点使用FG5重力仪测量g,以校准和补充GPS测量。五年的数据收集应该能够量化基准相对于海平面的抬升,并测试这种抬升是由地壳增厚补偿的,还是对侵蚀卸荷的反应。变形的垂直分量应有助于理解大陆构造中的两个基本过程:1)地表变形如何与深层变形联系在一起;2)气候如何通过侵蚀影响构造。结合使用绝对g和全球定位系统大地测量应能使PI区分均衡响应引起的隆起程度:1)地表载荷的去除和整个地壳的隆起,或2)地壳加厚,其增厚速率应是测量的隆起速率的6至7倍。这项工作涉及与新西兰和其他地方的国际同事进行广泛的合作和分担费用。
英文摘要
9902981Bilham This is a collaborative project to measure vertical components of motion across the Southern Alps of New Zealand using both GPS geodesy and absolute gravity. The investigators will install seven continuous or semi-continuous GPS instruments along a profile across the Southern Alps where the range is especially high, and rates of vertical movement should also be high. They will measure g, using the FG5 gravity instrument at 10 sites, both to calibrate and supplement GPS measurements. Five years of data collection should allow a quantification of uplift of benchmarks with respect to sea-level, and a test of whether such uplift is compensated by crustal thickening or a response to erosional unloading. Vertical components of deformation should contribute to understanding two basic processes in continental tectonics; 1) how surface deformation is connected to that at depth, and 2) how climate, through erosion, affects tectonics. The combined use of absolute g and GPS geodesy should allow the PIs to distinguish the extent to which uplift results from the isostatic response to 1) the removal of a surface load and the uplift of the entire crust, or 2) to crustal thickening, for which the rate of thickening should be six to seven times the measured rate of uplift. The work involves extensive collaboration and cost sharing with international colleagues in New Zealand and elsewhere.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
RAPID: The East Anatolian fault earthquake sequence of 6 February 2023: epicentral afterslip and anticipated future rupture propagation
  • 批准号:
    2318733
  • 项目类别:
    Standard Grant
  • 资助金额:
    $6.11万
  • 财政年份:
    2023
  • 负责人:
    Roger Bilham
  • 依托单位:
Collaborative Research: Geodetic imaging of the interplay between creep, locking, earthquakes and land subsidence along the Chaman plate boundary
  • 批准号:
    2028557
  • 项目类别:
    Standard Grant
  • 资助金额:
    $18.43万
  • 财政年份:
    2021
  • 负责人:
    Roger Bilham
  • 依托单位:
RAPID: Capture of ephemeral fault slip data from the North Anatolian slow slip event Dec2019 and triggered slip data from the East Anatolian Mw=6.8 earthquake
  • 批准号:
    2019910
  • 项目类别:
    Standard Grant
  • 资助金额:
    $1.25万
  • 财政年份:
    2020
  • 负责人:
    Roger Bilham
  • 依托单位:
RAPID - Afterslip and triggered slip associated with the Ridgecrest earthquake sequence
  • 批准号:
    1941558
  • 项目类别:
    Standard Grant
  • 资助金额:
    $3.71万
  • 财政年份:
    2019
  • 负责人:
    Roger Bilham
  • 依托单位:
国内基金
海外基金
Research on Quantum Field Theory without a Lagrangian Description
  • 批准号:
    24ZR1403900
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    SATOSHI NAWATA
  • 依托单位:
Cell Research
Cell Research
Cell Research (细胞研究)