Risk Assessment and Mitigation of Blast Damage to Structural Systems
Risk Assessment and Mitigation of Blast Damage to Structural Systems
批准号:
DP0556913
负责人:
Prof Mark Stewart
金额:
$14.42万
依托单位国家:
澳大利亚
项目类别:
Discovery Projects
财政年份:
2005
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2005-01-01 至 2008-12-30
中文摘要
为可能存在的数百或数千座现有建筑提供防爆保护措施的成本是巨大的,超出了政府和社会的资源。这里提出的决策框架提供了一种手段,将资金分配给那些被证明在发生炸弹爆炸时有高损坏风险的建筑物。这将使现有风险能够以合理和一致的方式进行量化和比较,从而确保在有限资源的支出下最大限度地减少风险。公共安全将由建筑物保护措施的范围和有效性来管理。生命将得到拯救,受伤的可能性和程度将降低,社会和经济破坏将降至最低。
英文摘要
The cost of providing blast-resistant protective measures to potentially hundreds or thousands of existing buildings is immense and beyond the resources of government and society. The decision-making framework proposed herein provides a means to allocate funds to those buildings shown to have high risk of damage in the event of bomb blast. This will enable existing risks to be quantified and compared in a rational and consistent manner, thus ensuring that risk mitigation is maximised given expenditure of limited resources. Public safety will be governed by the extent and effectiveness of building protective measures. Lives will be saved, likelihood and extent of injury reduced and social and economic disruption minimised.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Stochastic Assessment of Terrorist Blast and Fragmentation Casualty Risks
-
批准号:DP210101487
-
项目类别:Discovery Projects
-
资助金额:$50.46万
-
财政年份:2021
-
负责人:Prof Mark Stewart
-
依托单位:
Discovery Projects - Grant ID: DP210101487
-
批准号:ARC : DP210101487
-
项目类别:Discovery Projects
-
资助金额:$70.36万
-
财政年份:2021
-
负责人:Prof Mark Stewart
-
依托单位:
Stochastic hazard assessment of unreinforced masonry wall systems
-
批准号:DP180102334
-
项目类别:Discovery Projects
-
资助金额:$33.19万
-
财政年份:2018
-
负责人:Prof Mark Stewart
-
依托单位:
Risk-Based Decision-Making for Terrorism and Infrastructure Security
-
批准号:DP160100855
-
项目类别:Discovery Projects
-
资助金额:$55.06万
-
财政年份:2016
-
负责人:Prof Mark Stewart
-
依托单位:
Probabilistic terrorism risk assessment and risk acceptability for infrastructure protection
-
批准号:DP110101397
-
项目类别:Discovery Projects
-
资助金额:$61.8万
-
财政年份:2011
-
负责人:Prof Mark Stewart
-
依托单位:
Stochastic Modelling of Structural Facade Damage and Occupant Safety Risks Due to Explosive Blast Loading
-
批准号:DP0878347
-
项目类别:Discovery Projects
-
资助金额:$22.18万
-
财政年份:2008
-
负责人:Prof Mark Stewart
-
依托单位:
Stochastic Modelling of Strength and Reliability of Masonry Walls Loaded in Flexure and Compression
-
批准号:LP0669538
-
项目类别:Linkage Projects
-
资助金额:$5.6万
-
财政年份:2006
-
负责人:Prof Mark Stewart
-
依托单位:
国内基金
海外基金
基于重要农地保护LESA(Land Evaluation and Site Assessment)体系思想的高标准基本农田建设研究
-
批准号:41340011
-
项目类别:专项基金项目
-
资助金额:20.0万元
-
批准年份:2013
-
负责人:钱凤魁
-
依托单位: