The Consortium on Risk in the Environment: Diagnostics, Integration, Benchmarking, Learning and Elicitation (CREDIBLE)
The Consortium on Risk in the Environment: Diagnostics, Integration, Benchmarking, Learning and Elicitation (CREDIBLE)
批准号:
NE/J017450/1
负责人:
Thorsten Wagener
金额:
$139.93万
依托单位:
依托单位国家:
英国
项目类别:
Research Grant
财政年份:
2012
资助国家:
英国
项目状态:
已结题
起止时间:
2012 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Natural hazard events claim thousands of lives every year, and financial losses amount to billions of dollars. The risk of losing wealth through natural hazard events is now increasing at a rate that exceeds the rate of wealth creation. Therefore natural hazards risk managers have the potential, through well-informed actions, to significantly reduce social impacts and to conserve economic assets. By extension, environmental science, through informing the risk manager's actions, can leverage research investment in the low millions into recurring social and economic benefits measured in billions. However, to be truly effective in this role, environmental science must explicitly recognize the presence and implications of uncertainty in risk assessment.Uncertainty is ubiquitous in natural hazards, arising both from the inherent unpredictability of the hazard events themselves, and from the complex way in which these events interact with their environment, and with people. It is also very complicated, with structure in space and time (e.g. the clustering of storms), measurements that are sparse especially for large-magnitude events, and losses that are typically highly non-linear functions of hazard magnitude. The tendency among natural hazard scientists and risk managers (eg actuaries in insurance companies) is to assess the 'simple' uncertainty explicitly, and assign the rest to a large margin for error.The first objective of our project is to introduce statistical techniques that allow some of the uncertainty to be moved out of the margin for error and back into an explicit representation, which will substantially improve the transparency and defensibility of uncertainty and risk assessment. Obvious candidates for this are hazard models fitted on a catalogue of previous events (for which we can introduce uncertainty about model parameters, and about the model class), and limitations in the model of the 'footprint' of the hazard on the environment, and the losses that follow from a hazard event.The second objective is to develop methods that allow us to assess less quantifiable aspects of uncertainty, such as probabilities attached to future scenarios (eg greenhouse gas emissions scenarios, or population growth projections). The third objective is to improve the visualisation and communication of uncertainty and risk, in order to promote a shared ownership of choices between actions, and close the gap between the intention to act (eg, to build a levee, or relocate a group of people living in a high-risk zone) and the completion of the act. In natural hazards this gap can be large, because the cost of the act is high, many people may be affected, and the act may take several years to complete.Ultimately, everyone benefits from better risk management for natural hazards, although the nature of the benefits will depend on location. In the UK, for example, the primary hazard is flooding, and this is an area of particular uncertainty, as rainfall and coastal storm surges are likely to be affected by changes in the climate. A second hazard is drought, leading to heat stress and water shortages. Our project has explicit strands on inland flooding, wind-storms, and droughts. Other parts of the world are more affected by volcanoes or by earthquakes, and our project has strands on volcanic ash, debris flows as found in volcanic eruptions (ie lahars; avalanches are similar), and earthquakes. In the future, new hazards might emerge, such as the effect of space weather on communications. A key part of our project is to develop generic methods that work across hazards, both current and emerging.
期刊论文(9)
专著(0)
科研奖励(0)
会议论文
Volcano Statistics Casebook: Tentative evidence from two real-time analyses for an Earth tide influence on volcano-seismic events
火山统计案例手册:地球潮对火山地震事件影响的两次实时分析的初步证据
DOI:
10.5038/2163-338x.2.2
发表时间:
2016
期刊:
Statistics in Volcanology
影响因子:
--
作者:
[Aspinall W]
通讯作者:
Aspinall W
DOI:
10.1080/02626667.2015.1031761
发表时间:
2016-07-01
期刊:
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES
影响因子:
--
作者:
[Beven, Keith]
通讯作者:
Beven, Keith
Accounting for dependencies in regionalized signatures for predictions in ungauged catchments
考虑区域化签名中的依赖性以进行未计量流域的预测
DOI:
10.5194/hess-20-887-2016
发表时间:
2016
期刊:
Hydrology and Earth System Sciences
影响因子:
6.3
作者:
[Almeida S]
通讯作者:
Almeida S
Blueprint for a Flood and Drought Research Infrastructure
-
批准号:NE/V009060/1
-
项目类别:Research Grant
-
资助金额:$16.68万
-
财政年份:2020
-
负责人:Thorsten Wagener
-
依托单位:
TECHNOLOGY MARKET ASSESSMENT AND FOLLOW ON FUND APPLICATION SUPPORT FOR THE SAFE SOFTWARE TOOL
-
批准号:NE/N007700/1
-
项目类别:Research Grant
-
资助金额:$1.37万
-
财政年份:2015
-
负责人:Thorsten Wagener
-
依托单位:
Quantification of risks to bridges from erosion and blockage: An elicitation of expert views
-
批准号:NE/M008746/1
-
项目类别:Research Grant
-
资助金额:$5.04万
-
财政年份:2014
-
负责人:Thorsten Wagener
-
依托单位:
Modular Curriculum for Hydrological Advancement - Toward an Online Faculty Learning Community for Hydrology Education
-
批准号:0633556
-
项目类别:Standard Grant
-
资助金额:$0.0万
-
财政年份:2007
-
负责人:Thorsten Wagener
-
依托单位:
Collaborative Research: Understanding the Hydrologic Implications of Landscape Structure and Climate -- Towards a Unifying Framework of Watershed Similarity
-
批准号:0635998
-
项目类别:Continuing Grant
-
资助金额:$15.9万
-
财政年份:2007
-
负责人:Thorsten Wagener
-
依托单位:
国内基金
海外基金
登录
查看更多内容
The Heterogenous Impact of Monetary Policy on Firms' Risk and Fundamentals
-
批准号:--
-
项目类别:外国学者研究基金项目
-
资助金额:--
-
批准年份:2024
-
负责人:潘军
-
依托单位:
基于移动健康技术干预动脉粥样硬化性心血管疾病高危人群的随机对照现场试验:The ASCVD Risk Intervention Trial
-
批准号:81973152
-
项目类别:面上项目
-
资助金额:54.0万元
-
批准年份:2019
-
负责人:胡东生
-
依托单位:
基于时间序列间分位相依性(quantile dependence)的风险值(Value-at-Risk)预测模型研究
-
批准号:71903144
-
项目类别:青年科学基金项目
-
资助金额:17.0万元
-
批准年份:2019
-
负责人:张申
-
依托单位:
RISK通路在胃泌素介导的心脏缺血再灌注损伤保护中的作用研究
-
批准号:81800239
-
项目类别:青年科学基金项目
-
资助金额:21.0万元
-
批准年份:2018
-
负责人:符金娟
-
依托单位:
异氟烷基于TLR4/RISK/NF-κB调控糖尿病缺血性脑卒中后NLRP3炎症小体形成的机制研究
-
批准号:81771232
-
项目类别:面上项目
-
资助金额:54.0万元
-
批准年份:2017
-
负责人:张鸿飞
-
依托单位:
Notch1与RISK/SAFE/HIF-1α信号通路整合在I-postC保护中的作用及其机制
-
批准号:81260024
-
项目类别:地区科学基金项目
-
资助金额:50.0万元
-
批准年份:2012
-
负责人:刘季春
-
依托单位: