Systems engineering approach to the reliability of complex civil infrastructure

复杂民用基础设施可靠性的系统工程方法

基本信息

  • 批准号:
    462879-2013
  • 负责人:
  • 金额:
    $ 5.97万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Collaborative Research and Development Grants
  • 财政年份:
    2014
  • 资助国家:
    加拿大
  • 起止时间:
    2014-01-01 至 2015-12-31
  • 项目状态:
    已结题

项目摘要

The dams and hydropower industry has a demand to characterize the risk associated with its operations, and in particular, the risk of dam failure. In current practice, the capability to reliably estimate risk remains very weak. The reasons are essentially all due to the fact that the existing capability to characterize dam risk is the "extreme event" philosophy of dam safety that prevailed in the 1970's and 1980's. In terms of this philosophy, there could be no consideration of combinations of lesser floods and earthquakes. Beyond these physical dam safety concerns, this traditional philosophy does not consider operator error or procedural failures in any way, nor does it embody any consideration of institutional failures or contributions to risk. In particular the problem of "uncommon combinations of problems that individually are not uncommon" is omitted completely.
大坝和水电行业需要描述与其运营相关的风险,特别是溃坝风险。在目前的实践中,可靠地估计风险的能力仍然非常薄弱。其原因基本上都是由于这样一个事实,即现有的能力,以大坝风险的特点是“极端事件”的大坝安全的哲学,在20世纪70年代和80年代盛行。根据这一理念,不可能考虑较小的洪水和地震的组合。除了这些大坝的物理安全问题,这种传统的哲学不考虑运营商的错误或程序失败,也没有体现任何考虑机构故障或风险的贡献。特别是“个别并不罕见的问题的罕见组合”的问题被完全省略。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Simonovic, Slobodan其他文献

Simonovic, Slobodan的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Simonovic, Slobodan', 18)}}的其他基金

Water Resources Management Capacity Building in the Context of Global Change
全球变化背景下的水资源管理能力建设
  • 批准号:
    RGPIN-2016-03696
  • 财政年份:
    2021
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Water Resources Management Capacity Building in the Context of Global Change
全球变化背景下的水资源管理能力建设
  • 批准号:
    RGPIN-2016-03696
  • 财政年份:
    2020
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Water Resources Management Capacity Building in the Context of Global Change
全球变化背景下的水资源管理能力建设
  • 批准号:
    RGPIN-2016-03696
  • 财政年份:
    2019
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Linking hazard, exposure and risk across multiple hazards
将多种危害的危害、暴露和风险联系起来
  • 批准号:
    472152-2014
  • 财政年份:
    2019
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Collaborative Research and Development Grants
Linking hazard, exposure and risk across multiple hazards
将多种危害的危害、暴露和风险联系起来
  • 批准号:
    472152-2014
  • 财政年份:
    2018
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Collaborative Research and Development Grants
Water Resources Management Capacity Building in the Context of Global Change
全球变化背景下的水资源管理能力建设
  • 批准号:
    RGPIN-2016-03696
  • 财政年份:
    2018
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Systems engineering approach to the reliability of complex civil infrastructure
复杂民用基础设施可靠性的系统工程方法
  • 批准号:
    462879-2013
  • 财政年份:
    2017
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Collaborative Research and Development Grants
Water Resources Management Capacity Building in the Context of Global Change
全球变化背景下的水资源管理能力建设
  • 批准号:
    RGPIN-2016-03696
  • 财政年份:
    2017
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Linking hazard, exposure and risk accross multiple hazards
将多种危害的危害、暴露和风险联系起来
  • 批准号:
    472152-2014
  • 财政年份:
    2017
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Collaborative Research and Development Grants
Systems engineering approach to the reliability of complex civil infrastructure
复杂民用基础设施可靠性的系统工程方法
  • 批准号:
    462879-2013
  • 财政年份:
    2016
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Collaborative Research and Development Grants

相似国自然基金

软骨调节素调控BMSCs骨和软骨双向分化平衡的研究
  • 批准号:
    81272128
  • 批准年份:
    2012
  • 资助金额:
    70.0 万元
  • 项目类别:
    面上项目
Frontiers of Environmental Science & Engineering
  • 批准号:
    51224004
  • 批准年份:
    2012
  • 资助金额:
    20.0 万元
  • 项目类别:
    专项基金项目
Chinese Journal of Chemical Engineering
  • 批准号:
    21224004
  • 批准年份:
    2012
  • 资助金额:
    20.0 万元
  • 项目类别:
    专项基金项目
基于脂肪干细胞的同种异体肌腱缺损修复及机制
  • 批准号:
    81101359
  • 批准年份:
    2011
  • 资助金额:
    22.0 万元
  • 项目类别:
    青年科学基金项目
Chinese Journal of Chemical Engineering
  • 批准号:
    21024805
  • 批准年份:
    2010
  • 资助金额:
    20.0 万元
  • 项目类别:
    专项基金项目
脂肪来源干细胞诱导尿路上皮细胞及其机制的研究
  • 批准号:
    81070605
  • 批准年份:
    2010
  • 资助金额:
    30.0 万元
  • 项目类别:
    面上项目
Ihh在组织工程骨构建中作用和机制研究
  • 批准号:
    30973069
  • 批准年份:
    2009
  • 资助金额:
    34.0 万元
  • 项目类别:
    面上项目
Leydig干细胞纯化、扩增及雄激素分泌组织构建
  • 批准号:
    30970736
  • 批准年份:
    2009
  • 资助金额:
    30.0 万元
  • 项目类别:
    面上项目
预构血管化支架以构建大体积岛状组织工程化脂肪瓣的实验研究
  • 批准号:
    30901566
  • 批准年份:
    2009
  • 资助金额:
    19.0 万元
  • 项目类别:
    青年科学基金项目
人脐血间充质干细胞成骨潜能亚群的特异性分子标志
  • 批准号:
    30800232
  • 批准年份:
    2008
  • 资助金额:
    20.0 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Resilient EMS PSLL: Using a Systems Engineering Approach to Enhance EMS Cognitive Work and Safety for Older Adults During Prehospital Care.
弹性 EMS PSLL:使用系统工程方法来增强院前护理期间老年人的 EMS 认知工作和安全。
  • 批准号:
    10769353
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
A Systems Engineering Approach to Optimize Pediatric Medication Safety
优化儿科用药安全的系统工程方法
  • 批准号:
    10628555
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
Image-based Systems Biology of Vascular Co-option in Brain Tumors
脑肿瘤血管选择的基于图像的系统生物学
  • 批准号:
    10681077
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
MIRA: Systems genomics of complex traits - Administrative Supplements to Support Undergraduate Summer Research Experiences
MIRA:复杂性状的系统基因组学 - 支持本科生暑期研究经验的行政补充
  • 批准号:
    10810171
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
Preparing older adults for major abdominal surgery: a systems engineering approach to implement preoperative comprehensive geriatric assessments
为老年人进行腹部大手术做好准备:实施术前综合老年评估的系统工程方法
  • 批准号:
    10643615
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
SAIA-TB: Using the Systems Analysis and Improvement Approach (SAIA) to prevent TB in rural South Africa
SAIA-TB:使用系统分析和改进方法 (SAIA) 预防南非农村地区的结核病
  • 批准号:
    10699071
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
Impact of gene-drive systems for population modification on malaria vector mosquitoes
基因驱动系统对疟疾媒介蚊子种群改造的影响
  • 批准号:
    10658710
  • 财政年份:
    2023
  • 资助金额:
    $ 5.97万
  • 项目类别:
HORNET Center for Autonomic Nerve Recording and Stimulation Systems (CARSS)
HORNET 自主神经记录和刺激系统中心 (CARSS)
  • 批准号:
    10557007
  • 财政年份:
    2022
  • 资助金额:
    $ 5.97万
  • 项目类别:
Solving and Analyzing Nonlinear Multibody Dynamic Engineering Systems with a Piecewise Linearization Approach
使用分段线性化方法求解和分析非线性多体动态工程系统
  • 批准号:
    RGPIN-2020-06926
  • 财政年份:
    2022
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Discovery Grants Program - Individual
Generational Family Patterns, and Engineering Entry and Persistence: A Bowen Family Systems Approach
代际家庭模式、工程进入和持久性:鲍文家庭系统方法
  • 批准号:
    2225381
  • 财政年份:
    2022
  • 资助金额:
    $ 5.97万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了